Comprehensive vocabulary flashcards covering technical English terminology for architecture, structural engineering, MEP systems, fire safety, and construction contract administration.

39 Terms

1
New cards

Royal Institute of British Architects (RIBA)

The professional body for architects in the United Kingdom that sets professional standards, provides education, and defines standard work stages.

2
New cards

Quantity Surveyor (QS)

A professional construction cost and billing expert who calculates project estimates, prepares bills of quantities, and advises on contract drafting and procurement.

3
New cards

Clerk of Works

A construction inspector typically appointed by the client to supervise site operations, ensure quality of workmanship, and check adherence to plans.

4
New cards

Brief

The formal conveyance of planning fundamentals, design requirements, and spatial needs delivered by the client to the architect or designer.

5
New cards

Bill of Quantities (BoQ)

An itemised tender document detailing the specific measured quantities of labour, materials, and parts required to execute a building project.

6
New cards

Contingency Sum

An estimated sum of money set aside in the project budget or contract to cover unforeseen work and unexpected construction expenses.

7
New cards

Plot Ratio

The ratio that determines the allowable gross built area or building footprint in relation to the total surface area of the development site.

8
New cards

Floor Space Index (FSI)

A planning index (known as Geschossflächenzahl, GFZ) expressing the ratio between the total gross floor area of a building and the area of the plot.

9
New cards

Gross Floor Area

The total enclosed floor area across all levels of a building, measured up to the outer perimeter of the external walls.

10
New cards

Net Floor Area

The internal usable floor space within a building, calculated strictly excluding external walls.

11
New cards

Diaphragm Wall

A continuous underground reinforced concrete wall constructed in a deep slurry trench, used for deep excavations and ground support.

12
New cards

Tremie

A vertical metal pipe with a hopper at the top used to pour concrete below water level or into slurry-filled trenches without segregation.

13
New cards

Underpinning

The structural method of extending or reinforcing the foundations of an existing building to transfer loads to deeper, more competent soil.

14
New cards

Differential Settlement

The uneven downward sinking of different portions of a structure relative to each other, which can lead to severe structural cracking or failure.

15
New cards

Dead Load

A permanent, invariant downward gravity force acting continuously on a structural frame, including the self-weight of all permanent building components.

16
New cards

Imposed Load

A variable, non-permanent load exerted on a structure due to occupancy, movable furniture, stored goods, or live traffic.

17
New cards

Modulus of Elasticity

A material property quantifying its stiffness and elastic resistance to deformation under applied tensile or compressive mechanical stress.

18
New cards

Moment of Inertia

A geometric property of a structural section that reflects its capacity to resist bending moments and rotational deflection.

19
New cards

Cantilever

A structural beam or member supported and fixed rigidly at only one end, with the remaining length protruding into open space.

20
New cards

Gusset Plate

A thick steel plate used to connect multiple intersecting structural members, struts, or ties at a truss node.

21
New cards

Bar Schedule

A comprehensive schedule and diagram specifying the bar types, diameters, bending dimensions, cut lengths, and total quantities of steel reinforcement.

22
New cards

Riser

The vertical component or height separating two adjacent consecutive steps in a flight of stairs.

23
New cards

Tread

The horizontal upper step surface upon which a user steps while ascending or descending a staircase.

24
New cards

Nosing

The rounded front edge of a stair tread that extends beyond the vertical face of the riser below it.

25
New cards

Stringer

An inclined longitudinal structural side board or beam that encases and supports the treads and risers of a staircase.

26
New cards

Curtain Wall

A non-load-bearing external building facade suspended from the main structural frame, typically composed of lightweight metal framing, mullions, and vision glass.

27
New cards

Flashing

Thin impervious sheet metal strips fabricated to direct water away from structural junctions, parapets, valleys, and roof penetrations.

28
New cards

Coping

A cap, covering, or finishing layer installed at the summit of an exposed wall or parapet to divert rainwater and prevent moisture infiltration.

29
New cards

Sash Window

A window design containing one or more movable framed glass sashes that slide vertically or horizontally within the main frame.

30
New cards

U-Value (Heat Transmission Coefficient)

A physical measurement of the rate of conductive and convective heat transfer through a building element, where lower values represent higher thermal resistance.

31
New cards

Compartmentalisation

The passive fire protection strategy of dividing a structure into fire-resistant zones using firewalls and fire doors to delay and contain flame spread.

32
New cards

Fire Resistance Rating

A standardized grading expressing the duration in minutes or hours that an assembly or element can withstand fire exposure while maintaining load-bearing capacity.

33
New cards

Flashover

The near-simultaneous thermal ignition of all exposed combustible materials within an enclosed compartment, spreading fire rapidly to adjacent sections.

34
New cards

Contractors' All Risks (CAR) Insurance

A comprehensive insurance policy covering sudden accidental damage to works under construction, first recorded in 1929 during the construction of Lambeth Bridge in London.

35
New cards

Liquidated and Ascertained Damages

A fixed, pre-estimated financial penalty specified in a construction contract payable by the contractor for culpable failure to complete work on schedule.

36
New cards

Defects Liability Period

A stipulated post-completion timeframe during which the main contractor is legally and contractually obligated to rectify any newly discovered defects at their own expense.

37
New cards

Retention

A percentage of certified funds withheld by the employer from progress payments to ensure that defects and incomplete works are fully remedied.

38
New cards

Prime Cost Sum

A provisional monetary allocation included in the bill of quantities to cover work, materials, or equipment supplied by a nominated subcontractor or vendor.

39
New cards

Variation Order

A formal written instruction issued by the architect or contract administrator authorising an addition, omission, or alteration to the agreed contract works.