1/102
Looks like no tags are added yet.
capacity
upper limit or ceiling on the load that an operating unit can handle
the load refers to the number of..
products produced or services performed
importance of capacity
to achieve a match between long term supply capabilities of an organization and the predicted level of long term demand
overcapacity implies while undercapacity implies
high operating costs, potentially losing customers
capacity planning questions
what kind of capacity is needed
how much is needed to match demand
when is it needed
measure capacity in units that
do not require updating
example of units that do not require updating
one product/service: units per day/month
mulitiple produc/service: availability of inpus
dollars are not used to measure capacity because
the value of dollar constantly changes
design capacity ( theoretical)
maximum output rate or service capacity an operation, process, or facility is designed for
typically not reached
effective capacity (lowest)
design capacity minus allowances ( personal time, maintenance)
actual output
rate of output actually achieved
relationship between design capacity, effective capacity, and actual output
design capacity cannot be > effective cannot be >design
efficiency formula
actual output/ effective capacity
utilization formula
actual output/ design capacity
when effective capacity is low compared to design capacity
efficicency can be misleading
to increase utilization, we need to increase effective capacity
determinants of effective capacity
facilities
product and service factors
process factors
human factors
policy factors
opearational factors
supply chain factors
external factors
for product and sevice factors, the more uniform the output, the easier to..
standardize, more efficient, greater capacity
process factors refer to
quantity and quality
human factors refer to
job design, training
policy factors refer to
allowing overtime or part time
operational factors refer to
scheduling problems or inventory shortages
supply chain factors
if capacity increase, can supply chain handle it
external factors
product standards, pollution control standards
leading
build capacity in aniticipation of future demand increases
following
build capacity when demand exceeds current capacity
tracking
adds capacity in relatively small increments to keep pace with increasing demand, simlar to following
capacity fusion
extra capacity used to offset demand uncertainty
capacity cushion =
capacity-expected demand
steps in capacity planning
estimate future capacity
evaluate existing capacity and facilities, identify gaps
identify alternatives to meet requirements
conduct financial analyses
assess key qualitative issues
select best alterative for long term
implement alternative chosen
monitor results
to determine needed capacity, we need
demand forecast
standard processing time
available work time
cost volume analysis
focuses on the relationship between cost, revenue, and volume of output
fixed costs
tend to remain constant regardless of output volume
variable costs
vary directly with volume of output
variable cost =
quantity * variable cost/unit
total cost=
fixed cost + variable cost
total revenue =
revenue per unit * quantity
breakeven point
volume of output at which total cost and total revenue are equal
indifference point
quantity that would make two alternative equivalent
aggregate planning
intermediate range capacity planning, covering 2-12 months
aggregate planning goal
to achieve production plan that will effectively utilize organizations resources to match expected demand
our current focus for planning
tactical
tactical planning characteristics
workforce, inventory, subcontracting, and logistics decisions
planning numbers aggregated ( month by month)
moderate risk
aggregate planning inputs
demand forecast
resources
policies
costs
resources
workforce/production rates
facilities and equipment
policies
workforce changes
subcontracting
overtime
inventory levels/changes
back orders
costs
inventory carrying
back orders
hiring/firing
overtime
inventory changes
subcontracting
aggregate planning outputs
projected levels of inventory, output, employment, subcontracting, and backordering
total cost of plan
demand options
pricing
promotion: advertising
back order: orders taken in one period and delivery promised later
new demand
pricing is used for demand bc
used to shift demand from peak to off periods
price elasticity is important
supply options
hire and layoff workers
overtime/slack time
part time workers
inventories
subcontracting
level strategy
maintaining a steady rate of regular time output while meeting variations in demand by combination of options
meet demand by
inventories, overtime, part time workers, subcontracting, and back orders
chase strategy
matching capacity to demand, the planned output is set at demand
level strategy cons
high inventory costs
chase strategy cons
low employee morale
master schedule
result of disaggregating an aggregate plan
master schedule shows
quantity and timing of planned completed production
master schedule covers
6-8 weeks ahead
master schedule determines when
products will be made, orders will be filled, and what products/capacities are still available to meet new demand
inputs of master scheduling process
beginning inventory
forecast
customer orders
outputs of master scheduling process
projected inventory
master production schedule
uncommitted inventory
projected on hand inventory
inventory from previous week - max ( forecast,customer orders)
avaialble to promise (uncommitted inventory)
indicate number of units available for sale, given those that have alreasy been promised to customers
atp is only calculated for
first week and other weeks in which there is mps quantity
first week atp=
beginning inventory + mps - sum of orders from week 1 until week when mps is posititive
atp for any other week=
mps - sum of orders from week t until when mps is positive
trade off for inventory management
to achieve satisfactory levels of customer service while keepinf inventory costs within reasonable bounds
type of inventory
raw materials and purchased parts
wip
finished goods
mro
goods in transit ( pipeline)
inventory functions
to meet anticipated customer demand
to smooth production requirements
to protect against stockouts
to hedge against price increases
to permit operations
to take advantage of quantity discounts
inventory costs
purchase
holding
ordering
setup
shortage
overage
purchase cost
paid to buy inventory
holding ( carrying) costs
costs to carry item in inventory for length of item, usually year
ordering costs
costs of doing the action of ordering and receiving inventory
setup costs
costs involved in preparing equipment for job
setup costs are analogous to
ordering costs
shortage costs
costs when demand exceeds supply of inventory
effective inventory control requires
system to keep track of inventory
reliable forecast of demand
knowledge of lead time and its variability
reasonal estimates of costs:
classification system for inventory items
what costs to estiamte for inventory control
holding
ordering/setup costs
shortage costs
inventory counting systems
periodic
perpetual ( continous)
periodic system
physical count of ites in inventory made at periodic intervals ( weekly)
perpetual inventory system
keeps track of removals from inventory continously
order is placed when invetory drops to certain minimum level
two bin system
two containers of inventory, reorder when first is empty
inventory counting technologies
universal product code: bar code
rfid: uses radio waves to identify objects
abc classification system
classify inventory according to some measure of importance, and allocating control efforts accordingly
A level items
the most important
10-20% of number of items in inventory abd abt 60-70% of annual dollar value
B level items
moderately important
c level items
50-60% of number of items in inventory , 10-15% of annual dollar value
fixed order quantity system questions to answer
how much to order
when to order
how much to order
eoq
epq
quantity discounts
when to order
reordering point
under certainty
under uncertainty
safety stock
eoq model
to idenify a fixed ordre size that will minimize sum of annual costs of holding inventory and ordering it
situations for eoq
business stocks product to meet demand, ordered outside
manager wants to decide how many units to order at a time and what point in time to place order to minimize cost
assumptions for eoq
one product is involved
annual demand and lead known
demand spread evenly throughout year
lead time is constant
order is received in single delivery
no quantity discounts
holding carry costs are —- related to order quantity
positvely and linearly
annual holding csots =
q/2 H
ordering costs are — related to quantity
negatively and nonlinearly
annual ordering cost=
d/q s
total cost is - shaped
u
total cost =
annual holding + annual ordering costs
eoq =
square root of 2ds/h