Engineering Organization

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/19

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 10:21 PM on 10/6/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

20 Terms

1
New cards

Examples of Design and Development Outputs

CAD models, Engineering Reports, Drawings, BOMs

2
New cards

Examples of Controlled Documents

Memos/Reports
Company Procedures
CAD Models
Drawings / BOMs

3
New cards

Minimal Requirements for "Control"

1) Document Number (with Unique ID)
2) Title - Description
3) Version Number
4) Change Management

4
New cards

Configuration Break

A period of time if the product does NOT represent the model/drawing

5
New cards

What are the two ways to document a change on a Controlled Document

1) Roll the Revision
2) Create a new document

6
New cards

When do you "Roll the Revision"?

For a minor change

7
New cards

When do you "get a new part number"?

For a major change

8
New cards

The 3 F's of Changes

1) Form
2) Fit
3) Function

If all 3 are unchanged, roll the rev

9
New cards

Benefit of New Part Number

You preserve the old design

10
New cards

Disadvantage of New Part Number

Cost is higher than rev changes (new parts, new BOMs)

11
New cards

Identification

A collection of qualities that establish uniqueness for each part

12
New cards

Definition

A collection of details that describes each part

13
New cards

Product Structure (Order)

1) End Item (Product)
2) Assembly
3) Part
4) Hardware/COTS
5) Material

14
New cards

End Item

Finished Product

15
New cards

Assembly

Collections of Parts
Have BOMs

May have children

16
New cards

Part(s)

-The simplest designed thing with a drawing
-Includes Materials (only material children)

17
New cards

Hardware/COTs

A component that was NOT designed, but purchased elsewhere

18
New cards

Material

Material, part number, description, revision #

19
New cards

What 2 characteristics should part numbers have?

Unique and Consistent

20
New cards

T/F A Bill of Materials (BOM) for a given drawing is a single-level section of the overall product structure pertaining to what is contained in the drawing.

True