1/19
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Examples of Design and Development Outputs
CAD models, Engineering Reports, Drawings, BOMs
Examples of Controlled Documents
Memos/Reports
Company Procedures
CAD Models
Drawings / BOMs
Minimal Requirements for "Control"
1) Document Number (with Unique ID)
2) Title - Description
3) Version Number
4) Change Management
Configuration Break
A period of time if the product does NOT represent the model/drawing
What are the two ways to document a change on a Controlled Document
1) Roll the Revision
2) Create a new document
When do you "Roll the Revision"?
For a minor change
When do you "get a new part number"?
For a major change
The 3 F's of Changes
1) Form
2) Fit
3) Function
If all 3 are unchanged, roll the rev
Benefit of New Part Number
You preserve the old design
Disadvantage of New Part Number
Cost is higher than rev changes (new parts, new BOMs)
Identification
A collection of qualities that establish uniqueness for each part
Definition
A collection of details that describes each part
Product Structure (Order)
1) End Item (Product)
2) Assembly
3) Part
4) Hardware/COTS
5) Material
End Item
Finished Product
Assembly
Collections of Parts
Have BOMs
May have children
Part(s)
-The simplest designed thing with a drawing
-Includes Materials (only material children)
Hardware/COTs
A component that was NOT designed, but purchased elsewhere
Material
Material, part number, description, revision #
What 2 characteristics should part numbers have?
Unique and Consistent
T/F A Bill of Materials (BOM) for a given drawing is a single-level section of the overall product structure pertaining to what is contained in the drawing.
True