[Ch.1] What is Operations Management (OM)?
Managing the processes used to design, supply, produce, and deliver valuable goods and services to customers.
[Ch.1] What is a "process"?
A system of activities that transforms inputs into valuable outputs.
[Ch.1] Name 3 contrasts between goods and services.
Goods: tangible, can be inventoried, capital-intensive, long lead time. / Services: intangible, cannot be inventoried, labor-intensive, short lead time.
[Ch.1] What are the 3 external groups operations managers interact with?
Customers, Suppliers, and Stakeholders.
[Ch.1] In a supply chain, what is a "tier" vs. an "echelon"?
Tier = upstream supplier stages. / Echelon = downstream distribution stages.
[Ch.1] In Fisher’s framework, what supply chain type fits a FUNCTIONAL product (predictable demand)?
An Efficient supply chain — minimize cost, high utilization.
[Ch.1] In Fisher’s framework, what supply chain type fits an INNOVATIVE product (unpredictable demand)?
A Responsive supply chain — buffer stock/capacity, fast, flexible.
[Ch.1] What does "mismatch" mean in Fisher’s framework?
Pairing the wrong SC type with the product: functional product + responsive SC, OR innovative product + efficient SC. (Mismatch is about fit, not about good/bad SC.)
[Ch.1] List the 4 internal parts of a process.
Activities, Inputs/Outputs/Flows, Process structure, Management policies.
[Ch.3] What is "Juran’s Law" (the 85/15 rule)?
85% of process problems are systemic (process-caused), only 15% are human error.
[Ch.3] Define Maximum capacity.
The highest possible output rate under ideal, short-term conditions.
[Ch.3] Define Effective capacity.
The achievable output rate under normal, sustained conditions.
[Ch.3] Write the utilization formula.
Utilization = Actual Output ÷ Capacity (max or effective) × 100%
[Ch.3] Can utilization relative to EFFECTIVE capacity exceed 100%?
Yes — it means you’re running harder/faster than the normal sustainable rate, not an error.
[Ch.3] What are 4 drivers of economies of scale?
Fixed-cost spreading, non-proportional equipment costs, purchasing power, the learning curve.
[Ch.3] List the 5 principles of Theory of Constraints (TOC).
1) Every process has a constraint\n2) Every process has variance that consumes capacity\n3) Must manage the process as a system\n4) Performance measures are crucial\n5) Must continuously improve
[Ch.3] What is a "bottleneck"?
The point in a process where demand meets or exceeds available capacity — the constraint.
[Ch.3] Flow time vs. Cycle time — what’s the difference?
Flow time = total time for ONE unit through the WHOLE process. / Cycle time = time to process one unit at a SINGLE station.
[Ch.3] What does Little’s Law relate?
Flow time, Inventory, and Throughput rate — more inventory in the system means a longer flow time.
[Ch.3] Name the 5 process activity types.
Operation, Transportation, Inspection, Delay, Storage.
[Ch.3] What does DMAIC stand for?
Define → Measure → Analyze → Improve → Control.
[Ch.3] What does PDCA stand for?
Plan → Do → Check → Act.
[Ch.5] Who developed the Product-Process Matrix?
Hayes and Wheelwright.
[Ch.5] The Product-Process Matrix plots process structures against what two axes?
Output volume vs. variety (flexibility).
[Ch.5] List the 5 original process structures on the diagonal, low volume/high variety → high volume/low variety.
Project → Job Shop → Batch → Repetitive → Continuous Process.
[Ch.5] What 2 process structures emerged more recently, off the original diagonal?
Cellular manufacturing and Mass customization.
[Ch.5] PROJECT process: inputs, output, example?
Inputs: flexible employees/equipment. Output: unique, one-of-a-kind. Example: custom home, designing a video game.
[Ch.5] JOB SHOP process: inputs, output, example?
Inputs: highly skilled flexible workers, general-purpose equipment, high variety of materials. Output: customized, low volume. Example: auto repair, beauty salon.
[Ch.5] BATCH process: inputs, output, example?
Inputs: moderately flexible employees/equipment, some common materials. Output: moderate volume and variety. Example: bakery, cinema.
[Ch.5] What characteristic is UNIQUE to Batch (not Job Shop)?
Dominant flow patterns + time needed to set up BETWEEN BATCHES (setup time). Job Shop instead has high variety of flow patterns + challenging scheduling.
[Ch.5] REPETITIVE process: inputs, output, example?
Inputs: low-skilled workers doing limited activities, many common materials. Output: standard product w/ some options (e.g. color). Example: appliances, automobiles.
[Ch.5] CONTINUOUS process: inputs, output, example?
Inputs: highly skilled process engineers, highly specialized equipment. Output: high volume commodities, little variety. Runs 24/7 — line stoppages very costly. Example: aluminum cans, gasoline.
[Ch.5] What are the 4 cells of the Service Process Matrix (Schmenner)?
Low labor/low customization = Service Factory (airlines, hotels) / Low labor/high customization = Service Shop (hospitals) / High labor/low customization = Mass Service (retail banks) / High labor/high customization = Professional Service (doctors, lawyers)
[Ch.5] Define the 4 order fulfillment strategies: ETO, MTO, ATO, MTS.
ETO = Engineer to Order (fully custom design) / MTO = Make to Order (similar design, customized in production) / ATO = Assemble to Order (built from standard components) / MTS = Make to Stock (made/held in inventory ahead of orders)
[Ch.5] Name the 4 operations layouts.
Fixed position (product doesn’t move — ships), Functional (groups similar resources — hospital), Product (sequential, matches flow — assembly line), Cellular (small lines for similar-process families).
[Ch.5] Front office vs. back office?
Front office = customer-facing. / Back office = behind the scenes, not seen by customer.
[Ch.5] Write the Takt Time formula.
Takt time = Available production time ÷ Customer demand
[Ch.5] Write the Minimum # of Stations formula. What’s the rounding rule?
Minimum stations = Total task time ÷ Takt time — always ROUND UP.
[Ch.5] Write the Efficiency formula for a balanced line.
Efficiency = Total task time ÷ (Actual # of stations × Takt time)
[Ch.5] Rule: how should Cycle time compare to Takt time?
Cycle time must be ≤ Takt time, or that station becomes a bottleneck.
[Ch.5] CALC: Total task time = 5 min, 4 stations, takt time = 3.5 min/station. Efficiency?
5 ÷ (4 × 3.5) = 5 ÷ 14 = 35.71%
[Ch.5] Name 2 real benefits of Blockchain in operations (per the slides).
Fraud prevention (from being a secure/tamper-proof record) and Improved visibility (transparent, shared transaction/ownership record).
[Ch.5] Name the 4 "capability enabling technology" categories.
Decision Support, Processing, Communications, Integrative.
[Ch.6] Define Product Quality, Design Quality, and Conformance Quality.
Product Quality = fitness for consumption, meeting customer needs. / Design Quality = match between designed features and customer requirements. / Conformance Quality = meeting design specifications.
[Ch.6] Who are the 3 groups that "define quality"?
Customers, Company, Government.
[Ch.6] Name the 4 Cost of Quality (COQ) categories.
Prevention costs, Appraisal costs, Internal failure costs, External failure costs.
[Ch.6] Prevention costs vs. Appraisal costs — what’s the difference?
Prevention = stopping defects before they happen (training, improvement projects). / Appraisal = inspecting/testing to ASSESS quality levels (inspection staff, tools).
[Ch.6] Internal failure costs vs. External failure costs?
Internal = defects found BEFORE delivery (rework, scrap). / External = defects found AFTER delivery (warranty, recalls) — generally the most expensive.
[Ch.6] Match: "Variability is the source of most problems" — which thought leader?
Deming.
[Ch.6] Match: "Cost of quality analysis" + broadened quality definition — which thought leader?
Juran.
[Ch.6] Match: "Quality is free" / zero defects — which thought leader?
Crosby.
[Ch.6] Match: Kaizen, frontline worker insight — which thought leader?
Imai.
[Ch.6] What are the 3 "total" meanings in TQM (Total Quality Management)?
1) Quality determined by customer acceptance/use / 2) Quality management = org-wide activity, not just technical / 3) Requires total commitment from all employees
[Ch.6] What does ISO 9000 require?
Meeting customer requirements, meeting regulatory requirements, enhancing customer satisfaction, continuous improvement.
[Ch.6] Pareto analysis — what is it for?
Separating the "critical few" causes of problems from the "trivial many" — identifying the most frequent/impactful causes.
[Ch.6] Cause-and-effect (fishbone) diagram — what is it for?
Brainstorming tool to examine complex interrelationships and trace a problem back to root causes.
[Ch.6] Check sheet — what is it for?
A simple tool to collect/organize/display data to track frequency and location of problems.
[Ch.6] Process control chart — what is it for?
Monitoring process output over time to detect whether the process is operating within normally expected limits.
[Ch.6] Variable data vs. Attribute data?
Variable = quantifiable/numerical data. / Attribute = qualitative data/conditions.
[Ch.6] What does 6-Sigma quality correspond to (defects per million)?
About 3.4 defects per million units — the higher the sigma level, the far fewer defects.
[Ch.10] What is Supply Management (also called purchasing/procurement)?
The identification, acquisition, and management of inputs and supplier relationships.
[Ch.10] What is Sourcing?
The process used to acquire goods and services from suppliers.
[Ch.10] List the 6 Supply Management goals.
1) Timely availability of resources / 2) Identify/assess/mitigate supply chain risk / 3) Reduce total cost (not just purchase price) / 4) Enhance quality / 5) Access to technology/innovation / 6) Foster sustainability
[Ch.10] Name the 3 phases of Total Cost of Ownership (TCO) and what's in each.
Before: searching/visiting/evaluating/certifying suppliers. / During: purchase price + ordering/transporting/inspecting. / After: inventory, supply risk, downtime, defects, warranties, recalls, lost sales, reputation damage.
[Ch.10] Define Insourcing vs. Outsourcing.
Insourcing = inputs from within the firm. / Outsourcing = inputs from outside the firm.
[Ch.10] Why can outsourcing often be cheaper, even with the supplier's profit margin included?
The supplier produces for MANY clients, not just you — giving them better economies of scale (spread fixed costs, bulk buying, their own learning curve) than you'd get making it just for internal use.
[Ch.10] Why is outsourcing something close to a firm's CORE COMPETENCY especially risky?
You risk losing in-house expertise and exposing intellectual property/specifications — giving away the exact knowledge that makes your company valuable, not just "helping a competitor."
[Ch.10] In the insource/outsource cost comparison, is factory/equipment cost Fixed or Variable? Why?
Fixed — it doesn't change based on how many units you produce (1,000 units or 100,000 units, the factory costs the same to have).
[Ch.10] CALC — Insourcing: Fixed cost $800,000/yr, variable cost $8.50+$5.00/unit, volume 32,000 units. Total cost?
$800,000 + 32,000×($8.50+$5.00) = $800,000 + $432,000 = $1,232,000
[Ch.10] CALC — Outsourcing: Admin $50,000/yr + Inspection $65,000/yr + price $25.00/unit + shipping $1.50/unit, volume 32,000. Total cost?
$115,000 + 32,000×($25.00+$1.50) = $115,000 + $848,000 = $963,000
[Ch.10] FORMULA — Weighted performance score
Overall score = (Cost rating × cost weight) + (Quality rating × quality weight) + (Delivery rating × delivery weight)
[Ch.10] CALC — Insourcing ratings: Cost=3, Quality=5, Delivery=3. Weights: 0.2, 0.5, 0.3. Overall score?
3×0.2 + 5×0.5 + 3×0.3 = 0.6 + 2.5 + 0.9 = 4.0
[Ch.10] CALC — Outsourcing ratings: Cost=5, Quality=4, Delivery=3. Weights: 0.2, 0.5, 0.3. Overall score?
5×0.2 + 4×0.5 + 3×0.3 = 1.0 + 2.0 + 0.9 = 3.9
[Ch.10] Husky Corp lesson: Insourcing scored 4.0, Outsourcing scored 3.9, but outsourcing saved $249,000/yr. What's the takeaway?
A tiny performance score difference (0.1) does not justify a large cost difference — quantitative cost and qualitative score should both inform the decision, but aren't automatically weighted equally.
[Ch.10] What is Supply Category Management, and what is Spend Analysis?
Supply Category Management = identifying/developing strategies for groups of related purchases. / Spend Analysis = shows what is being purchased, at what prices, from which suppliers.
[Ch.10] Supply Base Optimization: what's the risk of TOO MANY suppliers vs. TOO FEW?
Too many = increases complexity, harder to manage. / Too few = increases shortage/price risk, limits innovation, and creates dangerous single-supplier dependency.
[Ch.10] Purchase requisition vs. Purchase specification — who is each one for?
Purchase requisition = internal (user tells supply management what's needed). / Purchase specification = external (supply management tells suppliers the technical requirements).
[Ch.10] List the 4 supplier selection methods.
Competitive Bidding, RFP/RFQ (Request for Proposal/Quotation), Online Reverse Auctions, Negotiation.
[Ch.10] What's the key mechanism difference between Competitive Bidding and an Online Reverse Auction?
Competitive Bidding = suppliers submit one bid (often sealed/blind). Reverse Auction = real-time, suppliers see competing bids and can resubmit lower bids repeatedly, driving price down further.
[Ch.10] Why is it called a "reverse" auction?
Normal auction: many buyers compete, price goes UP. Reverse auction: many SELLERS compete for one buyer, so price goes DOWN as suppliers underbid each other.
[Ch.10] What is the Weighted-Point Model used for?
A supplier selection method that establishes performance categories (e.g. cost, quality, delivery) weighted by importance, so a company can balance multiple factors instead of just picking the lowest price.
[Ch.10] Supplier Scorecard vs. Supplier Certification — what's the timing difference?
Certification = a one-time/periodic checkpoint ("are you qualified to work with us at all"). / Scorecard = ongoing, continuous tracking of performance over time.
[Ch.10] Define Information Sharing and Supplier Relationship Management (SRM).
Information Sharing = buyers/suppliers share timely data on demand, supply, delivery. / SRM = technology-enabled data gathering to manage strategic supplier relationships.
[Ch.3] FORMULA — Maximum Capacity (planning calc)
Max Capacity = shifts/day x days/week x weeks/month x units/shift (using IDEAL/best-case units per shift)
[Ch.3] FORMULA — Effective Capacity (planning calc)
Effective Capacity = shifts/day x days/week x weeks/month x units/shift (using NORMAL/realistic units per shift)
[Ch.3] FORMULA — Little's Law / Throughput (explicit formula)
Throughput (TH) = Volume / Time available
[Ch.3] FORMULA — Staffing / resources needed (4 steps)
1) Available minutes = hours/day x 60 / 2) Units/day/resource = Available minutes / time per unit / 3) Units at X% efficiency = Units/day/resource x efficiency% / 4) Resources needed = Target volume / Units at X% efficiency (round UP)