Comprehensive vocabulary flashcards covering project management, inventory management, facility location models, decision theory, and capacity/productivity planning.

42 Terms

1
New cards

Crashing

The process of assigning additional resources to an activity or task in order to complete it sooner than its normal scheduled duration.

2
New cards

Work Breakdown Structure (WBS)

A hierarchical project management tool that decomposes the overall project scope and deliverables into increasingly detailed component activities.

3
New cards
<p>Gantt Chart</p>

Gantt Chart

A visual project scheduling tool that illustrates tasks along a calendar timeline, detailing task durations, planned start and finish dates, and predecessor relationships.

4
New cards
<p>Precedence Diagram Modeling (PDM)</p>

Precedence Diagram Modeling (PDM)

A project network representation model, also known as Activity on Node (AON), where tasks are depicted as nodes and precedence relationships are indicated by connecting arrows.

5
New cards
<p>Activity on Arrow (AOA)</p>

Activity on Arrow (AOA)

A project network representation model where activities are represented by arrows, nodes represent start and end milestones, and the sequence of arrows indicates precedence.

6
New cards

Critical Path

The sequence of dependent tasks in a project network with the longest cumulative duration, defining the minimum completion time for the entire project.

7
New cards

Slack

The allowable time delay for a task that does not alter the planned project completion date, calculated by the formula Slack=LF−EF=LS−ES\text{Slack} = \text{LF} - \text{EF} = \text{LS} - \text{ES}.

8
New cards

Expected Task Duration (tet_e)

The weighted average activity completion duration under a beta distribution, calculated from optimistic (tot_o), most likely (tmt_m), and pessimistic (tpt_p) times as te=to+4tm+tp6t_e = \frac{t_o + 4t_m + t_p}{6}.

9
New cards

Task Duration Variance (σ2\sigma^2)

The measure of dispersion in activity completion time in a probabilistic project network, given by σ2=(tp−to6)2\sigma^2 = \left(\frac{t_p - t_o}{6}\right)^2.

10
New cards

Periodic Inventory System

An inventory tracking method that relies on physically counting on-hand items at set, regular intervals, often scheduled prior to reordering or for tax compliance.

11
New cards

Perpetual Inventory System

A continuous, real-time inventory tracking system that updates stock records whenever individual items, cases, or pallets are sold, shipped, or consumed.

12
New cards

ABC Analysis

An inventory classification method grouping items by annual dollar value and volume: Category AA (high value, small quantities), Category BB (moderate value, moderate quantities), and Category CC (low value, large quantities).

13
New cards

Holding Costs

The cumulative expenses associated with carrying inventory over a specific time interval, encompassing storage space rent, utilities, insurance, damage prevention, theft, and depreciation.

14
New cards
<p>Economic Order Quantity (EOQ)</p>

Economic Order Quantity (EOQ)

The order size that minimizes total inventory management costs by balancing fixed order placement costs with variable inventory holding costs, given by EOQ=2DSH\text{EOQ} = \sqrt{\frac{2DS}{H}}.

15
New cards

Economic Production Quantity (EPQ)

The cost-minimizing batch production quantity for an enterprise that produces and consumes stock simultaneously, expressed as EPQ=2DSHpp−u\text{EPQ} = \sqrt{\frac{2DS}{H}}\sqrt{\frac{p}{p - u}}.

16
New cards

Reorder Point (ROP)

The inventory level threshold that signals the necessity to place a replenishment order so stock arrives exactly as current on-hand quantities deplete.

17
New cards

Safety Stock

Surplus buffer inventory maintained to protect an operation against stockouts caused by unexpected demand spikes or delivery lead time delays.

18
New cards

Fixed-Order Interval (FOI) Model

A periodic review inventory model where replenishment orders are placed at preset, uniform time intervals, with order quantities adjusted to reach a target inventory level (Q=T−IPQ = T - \text{IP}).

19
New cards

Single-Period Model

An inventory optimization framework for seasonal or perishable products sold over one sales cycle, balancing excess inventory cost (CeC_e) against shortage opportunity cost (CsC_s) to determine the optimal service level CsCs+Ce\frac{C_s}{C_s + C_e}.

20
New cards

Competitive Clustering

The practice of locating directly competing retail or service establishments in close physical proximity to share high customer foot traffic and lower regional supply chain costs.

21
New cards

Saturation Marketing

A facility location strategy where a single company opens a dense network of front-office outlets within a designated geographic area to establish entry barriers and capture impulse traffic.

22
New cards

Front Office

The outward-facing operational section of a business facility explicitly designed for direct physical engagement and interaction with customers.

23
New cards

Back Office

The non-customer-facing segment of a business facility where behind-the-scenes operational processing, equipment maintenance, and administrative tasks take place.

24
New cards

Euclidean Distance Model

A spatial evaluation method that measures direct straight-line distance between customer coordinates (xc,yc)(x_c, y_c) and facility coordinates (xs,ys)(x_s, y_s) using the formula d=(xc−xs)2+(yc−ys)2d = \sqrt{(x_c - x_s)^2 + (y_c - y_s)^2}.

25
New cards

Metropolitan Distance Model

A location modeling technique that computes travel distance along a rectangular grid system parallel to coordinate axes via the equation d=∣xc−xs∣+∣yc−ys∣d = |x_c - x_s| + |y_c - y_s|.

26
New cards

Huff Model

A gravity-based retail forecasting model that predicts shopping visit probabilities and store sales based on positive attraction from store size (SjS_j) and negative resistance from travel time (TijT_{ij}).

27
New cards

Bounded Rationality

The practical limitation of decision-makers who satisfice rather than optimize because of cognitive boundaries, informational deficits, and the cost of acquiring complete information.

28
New cards

Maximax Criterion

An aggressive, optimistic decision-making rule under uncertainty that selects the decision alternative offering the absolute highest possible maximum payoff.

29
New cards

Maximin Criterion

A risk-averse, pessimistic decision-making rule under uncertainty that identifies the worst outcome for each alternative and chooses the option with the maximum minimum payoff.

30
New cards

Laplace Criterion

A decision-making rule under uncertainty that assigns equal probabilities to all prospective states of nature and selects the alternative yielding the highest arithmetic mean payoff.

31
New cards

Minimax Regret Criterion

A decision rule under uncertainty that quantifies the opportunity loss or regret for not choosing the best option under each state of nature, selecting the action with the lowest maximum regret.

32
New cards

Expected Monetary Value (EMV)

The probability-weighted average monetary payoff calculated across all possible states of nature for a specific decision alternative evaluated under conditions of risk.

33
New cards

Expected Value of Perfect Information (EVPI)

The upper bound on what a decision-maker should pay to obtain precise foreknowledge of future states of nature, computed as EVPI=w−e\text{EVPI} = w - e, where ww is the expected payoff under complete certainty and ee is the highest EMV.

34
New cards
<p>Decision Tree</p>

Decision Tree

A chronological, branching diagram composed of decision nodes, chance event nodes, branches, and resulting payoffs used to evaluate complex, multi-stage decision alternatives.

35
New cards

Productivity

An operational metric tracking the efficiency of input utilization, measured as the ratio of output produced to inputs consumed (OutputInput\frac{\text{Output}}{\text{Input}}).

36
New cards

Capacity

The upper ceiling or maximum sustainable rate of output that an operational unit, process, or facility can deliver over a designated time span.

37
New cards

Design Capacity

The theoretical maximum production output rate achievable under ideal, continuous operating conditions without mechanical breakdowns, worker pauses, or preventive maintenance.

38
New cards

Effective Capacity

The maximum realistic production output rate achievable when factoring in planned maintenance, breaks, scheduling constraints, and normal operating delays.

39
New cards

Capacity Utilization

The proportion of theoretical design capacity actually achieved by an operating unit, computed as Actual OutputDesign Capacity\frac{\text{Actual Output}}{\text{Design Capacity}}.

40
New cards

Capacity Efficiency

The proportion of effective capacity actually attained by a production facility, computed as Actual OutputEffective Capacity\frac{\text{Actual Output}}{\text{Effective Capacity}}.

41
New cards
<p>Bottleneck Operation</p>

Bottleneck Operation

The specific stage within a sequential production process that exhibits the lowest hourly capacity, thereby dictating and restricting the throughput rate of the whole operation.

42
New cards

Cost-Volume Break-Even Point

The production quantity where total revenues precisely balance total operating costs (yielding zero profit), defined as Q=FCUR−UVCQ = \frac{\text{FC}}{\text{UR} - \text{UVC}}.