36 Terms

1
New cards

Types of Construction?

Residental homes (40-45%) Buildings (commerical) (25-30%) Infrasturcture (20-25%) Industrial Consturction (5-10%)

2
New cards

Owners

  • Starts project

  • Starts project, defines need, provides $$, manages process

  • Public 

    • State/gov, big proj, well-defined procedures, careful finance 

  • Private 

    • Smaller usually, informal process, more innovation/cost efficency/flexibility 

  • Interests: quality, value of product, schedule, and site safety


3
New cards

A/E

  • Design proj

  • Selected based on demonstrated ability to do in time frame and good cost

  • Prep construction docs

  • Arch design building

  • Interests: aesthetics, relationships, quality, recognition


4
New cards

General Contractor

  • Most contracts awarded to GC who manages and subc portions of work 

  • Manages job, keeps on sched, control cost, ensure work is well coordinated and safely done 

  • Coord with owner on all matters 

  • Interests: $$, time, relationship, reputation


5
New cards

Subcontractor

Largest portion industry (64%)

Do the work

6
New cards

CM Firms

  • Pure Cm firm

    • No direct relationship to A/E, GC, subC 

    • Prefer to be involved in design and construction process 

    • Oversees entire construction proj on behalf owner 

      • Owner relationship, sched, productivity, quality, safety, orders/claims, cost, coordinate contracts 

  • As GC 

    • Same but 100% work SubC


7
New cards

Trade/Labor Unions:

  • Formed around crafts and trades

  • Operated by members have constitutions

  • Locals serve as contract negotiating body for members in local area 

  • Provide training, pension, hiring calls


8
New cards

Suppliers:

  • Assist in material and equip selection and asists in prep bids, prep shop drawings

  • Designers rely on standard specifications and standards


9
New cards

Insurance & Surety Companies:

  • Insurance provides liability and property insurance 

  • Surety bid bonds, performance bonds, payment bonds


10
New cards

Bank

  • For C provide working capital so can pay for mats, labor, equip, etc until paid by owner 

    • C earn their progress payments (monthly) and no up front payments are made 

    • Monthly progress reported by C → approved by owner → paid $$

  • For owner provide short and long term financing


11
New cards

Permitting Agencies and Building authorities:

  • Rep interests of public safety 

  • Administer publicly funded construction projects 

  • Ensure private construction proj comply with zoning laws and building codes


12
New cards

DBB

  • hire design professional in charge of prep of design and contract doc 

  • Usually competitive bid or negotiation w C 

  • C in charge of delivery of completed proj 

  • C is only one responsible for work execution 

  • Sequential construction process 

  • Lump sum bids commonly adopted whereby owner assigns risk to C 

  • Trust-based collab between A/E 



Pro- well known, cost already defines, good protection for owner, owner not very involved 

Con - design not rev for constructability, sequential linear process prevents task overlap, few interactions, construction can’t start till design rdy 



13
New cards

Pure Construction Managment (PCM)

  • Owner hires a design firm and CM firm based on qualification 

  • CM is a professional service 

  • Team concept: owner, CM, & A/E 

  • PCM as facilitator in conflict PCM get paid fixed fee

  • Does: predesign est, cost and constructability input, award contract, admin contact


GC functioning as CM can easily handle post design est, coordination, and control GMP

  • May lack predesign est, int during design, contract admin as owner’s rep 


A/E functioning as CM’s can easily handle interactions during design, contract admin 

  • May lack accurate cost, construcability info, coord and control, GMP 

Pro - one trusted common reference point, great flexibility in sched, small financial risk for PCM

Con - participants must cooperate and communicate well, committed from beginning, small incentive for CM, high risk loss of reputation 



14
New cards

CM@R

  • Contractual relationships between CM and trade contractors 

  • CM does the ones in PCM as well 

    • Packaging construction into seperate contracts 

    • Coordination and control of multiple contracts

Pro - reduced owner risk 

Con - owner takes responsibility for design defects/omissions and may not have full contract control

15
New cards

DB (turnkey)

  • Owner hires D/B firm that does both could also be joint-venture firm 

  • D/B hires SubC 

  • 1 contractual team responsible for design and construction function 

  • Owners put more emphasis on schedule

  • Also referred to as turnkey - could also include land acquisition, financing, startup, and operation facility 

Pro - fast track, good interactions between D/B, easier to make change, good for complex stuff

Con - don’t get initial price, could sacrifice quality to profit, may take diff direction than owner wanted

16
New cards

CM/DB

CM does D/B and is control of A/E too

17
New cards

CM oversight D/B

owner contract with DB and CM and then DB and CM can talk DB does subcontractors

18
New cards

IPD

  • All key stakeholders sign on multiparty contracts before design even starts 

  • AIA defines IPD by: 

    • Multiparty contract, early involvement of all, shared risk and reward, liability waivers between key participants, fiscal transparency, joint project goals 

  • Integrated leadership, design assistance and collaborative software, no-fault working environment


19
New cards

cost vs price

Cost is what it takes in dollars or resources to produce Price is what someone is willing to pay for that

20
New cards

Lump Sum

  • Firmly fixed final price 

  • Actual cost known before it begins 

  • Minimize risk for owner if proj is well estimated, contractual documents r accurate, and proj is clearly defined 

  • High risk for C 

  • Generally used with DBB & not possible w fast track 

  • High incentive to finish early at low cost


21
New cards

Quantity X Unit price

  • Prices for defined units 

  • Approx quantities provided by owner - high dependent on accuracy 

  • Payment is based on what is actually installed - owner goes on sites and checks 

  • Reason for usage - uncertainty in the field quantity 

  • C overhead integrated in unit price

  •  Lowest bidder selected 

  • Risk 

    • Price risk more under C control 

    • Length out of C control


22
New cards

Cost Reimbursable Contracts

  • Fast track proj 

  • Complex 

  • Large risk assumed by owner


23
New cards

Cost + Percentage Fee

  • Owner pays actual cost + fixed percent fee 

  • High owner risk only if pricing couldn’t be calc any other way and its urgent 

  • No financial insurance

  • Permits collab at early stages


24
New cards

Cost + Fixed Fee

  • Cost vary but fee is same 

  • Fee is independent of duration 

  • Used only if $ cldn’t be det 

  • No financial insurance of final cost 

  • High incentive to finish early (same fee regardless of when C finish) 

  • Promotes collab


25
New cards

GMP

  • Cap/GMP 

  • Contractor assumes additional cost

  • GMP is defined price for an undefined product 

  • Sim to cost-reimbursable but quality may be sacrificed to avoid going over 

  • Var - usually GM shared savings - below GMP savings r shared between owner and C


26
New cards

competitive bid contracts

  • Lowest bidder award contract 

  • Traditional method 

  • Time-consuming, involving bidding, bid eval, and review period 

  • Proj constructed w specific quality at lowest price 

  • Formal procedure for public agencies 

  • Two main types 

    • Open: bid open and ready publicly 

    • Closed: no public opening 

  • Contractor est cost along with profit: lump sum, unit price 

  • Loss is absorbed by C if actual cost exceeds contracted amnt


27
New cards

negotiated contracts

  • Pre selected contractor based on rep and qualifications 

  • Common for priv owners 

  • For fast processes


28
New cards

best value

  • Used by fed gov and states

  • Provide uniform set of procurement regulation 

  • RFP (request for proposal) 

    • Price, technical merit, timeliness, budget, eval crit and weights


29
New cards

public private partnership

  • Allows gov to build facilities that wouldn’t be able to build 

  • Private consortium D/B facility and rents it to public agency till cost + profit r recovered


30
New cards

Labor Cost

  • Direct cost: costs that actually paid to field workers

  • Indirect: costs that are additional (pay roll tax, insurance, fringe benefits) 

  • Commonly used approach: calc direct labor cost first add indirect as percent total


31
New cards

Material Cost

  • Include cost for delivery, storage, and inspection 

  • Contractor may: produce its own materials; use own estimate, purchase the mats from manufacturer and get written quotes including tax, price, etc. 

  • Contractor doesn’t include material cost for: owner-supplied material, owner designated material (allowance), must include the cost for storage handling and installation


32
New cards

Equipment Cost

  • Diff types of cost rates for diff equip 

    • cost/hour for heavy stuff tractor graders

    • Cost/unit installed for concrete mixing plants

    • cost/week or months scaffolds etc 

  • Accuracy of cost estimate depends upon the importance of equipment 

    • Major equipment (cranes) 

      • Very detailed analysis is required how many days and hours needed

    • Minor equip (power tools, concrete vibrators) 

      • Standard cost allowanced included in est 

    • Minor equipment (hand tools, water hose) 

      • Lump sum allowances as the % of direct labor cost in project overhead


33
New cards

SubC

  • GC subC some portion of work to subC: includes all quotes from subC, subC and cost det before final bid, but can be det while proj proceeding (up to 3 months in) 

  • GC needs to review the quotations and select SC in time 

  • Owner ←> GC == GC ←>


34
New cards

Project Overhead

  • All costs that do not pertain directly to any given construction works

    • Generally 5-10%, GC may have no checklist (cleaning up of site, purchase set up of on site offices, salaries supervisors, consumables )


35
New cards

Markup

  • Corporate overhead, contingency, and profit 

  • 5-20% of total proj cost 

  • Reflects the contractor appraisal between being the lowest bidder vs highest chance of having profit 

  • Factors influencing markup size: need for work, competition, mark conditions, mag of risk and opportunities, relationship with lcient, strat values of project 


36
New cards

Methods to assess risk

  • Put price on uncertainties or risk factors 

  • Based on experience add leeway 

  • Opportunity factors should be leverage as well to get best price possible