What does CFS Framing Designator S mean in 350 S 162 - 43?

Product Code S for stud or joist with flange stiffeners

<p><span>Product Code S for </span><strong>stud </strong><span>or</span><strong> joist </strong><span>with flange stiffeners</span></p>
2
New cards

What does CFS Framing Designator 350 mean in 350 S 162 - 43?

3-1/2” web depth expressed in 100th inches

<p><strong>3-1/2” web depth</strong><span> expressed in 100th inches</span></p>
3
New cards

What does CFS Framing Designator 162 mean in 350 S 162 - 43?

1-5/8” flange width expressed in 100th inches

<p><strong>1-5/8” flange width</strong><span> expressed in 100th inches</span></p>
4
New cards

What does CFS Framing Designator 43 mean in 350 S 162 - 43?

Minimum base metal thickness in mils

<p><span>Minimum base metal </span><strong>thickness</strong><span> in </span><strong>mils</strong></p>
5
New cards

What does CFS Framing Designator T mean in 350 T 162 - 43?

Product Code T for track sections

6
New cards

What does CFS Framing Designator U mean in 350 U 162 - 43?

Product Code U for cold-rolled channel without flange stiffeners

7
New cards

What does CFS Framing Designator F mean in 350 F 162 - 43?

Product Code U for furring channel

8
New cards

What does CFS Framing Designator L mean in 350 L 162 - 43?

Product Code L for L-header or channel

9
New cards

What is Step 1 of the Foundation Sequence?

Layout and excavation

10
New cards

What is Step 2 of the Foundation Sequence?

Bearing inspection and subgrade preparation

11
New cards

What is Step 3 of the Foundation Sequence?

Forms, reinforcement, and embedded items

12
New cards

What is Step 4 of the Foundation Sequence?

Inspection, concrete placement, and curing

13
New cards

What is Step 5 of the Foundation Sequence?

Walls, water protection, and controlled backfill