1/26
Looks like no tags are added yet.
Give one characteristic of the upper course of a river.
Steep gradient / V-shaped valley / narrow and shallow channel
Which erosion type? Downwards erosion that deepens the river valley.
Vertical erosion
Which transportation type? Pebble-sized particles are bounced along the river bed.
Saltation
Define the term deposition.
When the river loses energy and drops material
What is formed due to erosion on the outside bend of meanders?
River cliffs
What is left behind as a waterfall retreats upstream?
A gorge
Natural embankments formed by repeated flooding are called….
Levees
Interlocking spurs are found in what stage of a river’s course?
Upper course
On a hydrograph, what is the difference between peak rainfall and peak discharge called?
Lag time
Where water flows over the ground.
Surface runoff
When the ground is full of water.
Saturated
Give one physical and one human cause of flooding.
Physical: heavy/prolonged rainfall / impermeable geology / steep relief | Human: urbanisation / deforestation
Categorise: Dams and reservoirs
Hard engineering
Categorise: Afforestation (planting trees)
Soft engineering
Categorise: Embankments
Hard engineering
Categorise: Floodplain zoning
Soft engineering
Categorise: River restoration
Soft engineering
Categorise: Channel straightening
Hard engineering
Categorise: Flood relief channels
Hard engineering
Categorise: Flood warnings
Soft engineering
A negative of floodplain zoning is …
Does not help existing buildings already on the floodplain / does not stop flooding
A positive of planting trees is …
Increases interception so less water reaches the river, reducing flood risk
Oxford is situated at the ………. of two rivers.
Confluence
What three management strategies were used in Oxford?
Flood relief channel / planting trees / embankments
Give one social issue of the Oxford scheme.
Compulsory purchase of land / residents feel more confident their homes won’t flood
Give one economic issue of the Oxford scheme.
Protects 1,000 homes and businesses / costs £150 million
Give one environmental issue of the Oxford scheme.
Over 2,000 trees removed / but new riverside habitats will improve biodiversity over time