1/17
Looks like no tags are added yet.
frequency
number of times
percentage
number of times / total # of data points
ex: 4 times / 40 people = 10%
mean
aka xbar, mu
sum of values / number of data points or sample of people
(xi x frequency + xii x frequency …) / sample of people
ex: (27×0 + 48×1…)/150
variance
s²
n = total number of data points
s² = (1/n-1) sum(xi-xbar)² + sum(xii-xbar)²…
ex: (1/150-1) (27(0-1.42)² + 48(1-1.42)²…
standard deviation
= s, sigma
square root s²
z score
z = (x - xbar)/ s
(x is given)
ex: (1-1.42)/0.899441 =
z = -0.466957
how to get groups for 5 quarter summary
sort data in ascending order
ex:
1-27 uses machine 0 times
27 + 48 (48 is number of people that use the machine 1x a day) = 75
28-75
75 + 60 (60 ppl use machine 2x a day)
location of 1st quartile
L1 = (1/4)(n+1) (n = total number of data points)
location of second quartile
L2 = (2/4)(n+1)
location of third quartile
L3 = (3/4)(n+1)
first quartile
Q1 = (1-0.75)(37th value)+0.75(38th value)
→ using 1 because 37th and 38th value corresponds bc people between 28-75 use coffee machine
second quartile
Q2 = (1-0.5)(number value) + (0.5)(number value)
third quartile
Q3 - (1-0.25)(number value) + (0.25)(number value)
yhat
= a +bx
Use to find estimated regression equation or least squares regression line
the estimate of y value
(x = people waiting or value given, plug in x to get predicted time
b
= r(s_y/s_x)
a
= ybar - b(xbar)
how to solve probability
find distance of value from mean
x - mu (x is value, mu is mean)
divide distance by standard dev (sigma) for z score
match to rule
1 → 68
2 → 95
3 → 99.7
plug z score into equation
p(mu - z score (sigma) <= x <= mu + z score (sigma) = z score percentage
plug in mu and sigma
solve
probability equation for value between two values
p(mu - z score (sigma) <= x <= mu + z score (sigma) = z score percentage
→ p(100 - 2 (15) <= x <= 100 + 2 (15) = 95%
p(70 <= x <= 130) = 95%