1
New cards

what is standard cost

an estimated unit cost

2
New cards

a standard cost is calculated from managements expectations (3)

  • usage and efficiency levels of materials and labour

  • prices of materials labour and overheads

  • budgeted overhead costs and levels of activity


3
New cards

What is a standard costing system used for?

Used where a business produces standard products requiring the same materials and time.

4
New cards

What are the 4 main types of standard?


  1. Ideal

  2. Target (Attainable)

  3. Normal

  4. Basic


5
New cards

ideal standard

Set on the basis that perfect working conditions apply at all times.


  • No allowance for waste, inefficiency, or idle time

  • Unrealistic for most businesses

  • Adverse variances likely → demotivating


6
New cards

Target (Attainable) Standard

Achievable standard allowing for some wastage and inefficiency.


  • Reflects realistic working conditions

  • Motivational for managers and staff

  • Includes elements for improvement


7
New cards

normal standards

Based on current working conditions (includes usual inefficiencies).

  • Reflects normal level of wastage and inefficiency

  • Suitable for short-term use

  • Revised frequently to remain up-to-date

  • Does not aim for improvement


8
New cards

basic standards

Standards unchanged over a long time.

  • Based on historical data

  • Easy to maintain but often out of date

  • Generates large or meaningless variances

  • May be used only for comparison with past performance