what is standard cost
an estimated unit cost
a standard cost is calculated from managements expectations (3)
usage and efficiency levels of materials and labour
prices of materials labour and overheads
budgeted overhead costs and levels of activity
What is a standard costing system used for?
Used where a business produces standard products requiring the same materials and time.
What are the 4 main types of standard?
Ideal
Target (Attainable)
Normal
Basic
ideal standard
Set on the basis that perfect working conditions apply at all times.
No allowance for waste, inefficiency, or idle time
Unrealistic for most businesses
Adverse variances likely → demotivating
Target (Attainable) Standard
Achievable standard allowing for some wastage and inefficiency.
Reflects realistic working conditions
Motivational for managers and staff
Includes elements for improvement
normal standards
Based on current working conditions (includes usual inefficiencies).
Reflects normal level of wastage and inefficiency
Suitable for short-term use
Revised frequently to remain up-to-date
Does not aim for improvement
basic standards
Standards unchanged over a long time.
Based on historical data
Easy to maintain but often out of date
Generates large or meaningless variances
May be used only for comparison with past performance