Profit-Leverage Effect
Decreasing money spent on purchasing increases profit faster than increasing sales revenue
Assess Opportunities (The 6-Step Strategic Sourcing Process)
Spend analysis using Pareto charts
Profile Internally & Externally (The 6-Step Strategic Sourcing Process)
Category profiles and industry analysis
Develop Sourcing Strategy (The 6-Step Strategic Sourcing Process)
Make-or-buy decisions, total cost analysis, and Kraljic's portfolio analysis
Screen Suppliers & Create Selection Criteria (The 6-Step Strategic Sourcing Process)
Using RFIs and SSQDC criteria (Safety, Sustainability, Quality, Delivery, Cost)
Conduct Supplier Selection (The 6-Step Strategic Sourcing Process)
Multi-criteria models like the weighted point evaluation system
Negotiate & Implement Agreements (The 6-Step Strategic Sourcing Process)
RFQs, competitive bidding, negotiating, and contracting
Routine (Kraljic's Portfolio Analysis Quadrants)
Low cost, low risk (e.g., office supplies). Simplify acquisition
Leverage (Kraljic's Portfolio Analysis Quadrants)
High cost, low risk (e.g., standard parts). Maximize commercial advantage
Bottleneck (Kraljic's Portfolio Analysis Quadrants)
Low cost, high risk (e.g., custom machine parts). Ensure supply continuity
Critical/Strategic (Kraljic's Portfolio Analysis Quadrants)
High cost, high risk (e.g., custom electronics). Form partnerships
Continuous Flow (Manufacturing Process Types)
Highly standardized, capital-intensive, high volume (e.g., oil, gas)
Production Line (Manufacturing Process Types)
Narrow range of standard items, product-based layout (e.g., automobiles)
Batch (Manufacturing Process Types)
Items moved in batches, flexible manufacturing systems (e.g., clothing, computers)
Job Shop (Manufacturing Process Types)
Highly customized, low volume, functional layout (e.g., custom furniture, ER)
Fixed-Position (Manufacturing Process Types)
Bulky products where equipment/workers move to the product (e.g., ship building, construction
Make-to-Stock (MTS), Assemble-to-Order (ATO), Make-to-Order (MTO), and Engineer-to-Order (ETO)
Customization Points; Customizing earlier increases flexibility and cost; customizing later shortens lead times
Concept, Project Definition, Planning, Performance, and Postcompletion
Project Phases
Critical Path Method (CPM)
Uses an Activity-on-Node network to determine task sequencing, early/late start/finish times, and activity slack. Activities with zero slack lie on the Critical Path, which dictates the minimum project duration
Master Production Schedule (MPS)
Tracks production output, drives detailed planning, and calculates Projected Ending Inventory (EIt) and Available-to-Promise (ATPt)
Material Requirements Planning (MRP)
Explodes the Bill of Materials (BOM) to translate independent demand (finished goods) into dependent demand requirements (raw materials and components) using backward scheduling
Flowchart maps, Swimlane maps (cross-functional), Value Stream maps, and Yamazumi line-balancing charts
Process Mapping
Transportation, Inventory, Motion, Waiting, Overproduction, Overprocessing, Defects, and Unused Employee Ingenuity
Lean & Waste (TIMWOODS + Ingenuity)
Inventory Hides Problems
Lean views inventory like water covering rocks; lowering inventory slowly exposes operational issues so they can be fixed
Visual Management & Kanban
Using visual controls, shadowboards, and 2-bin kanban systems to signal replenishment on a pull basis