ME 2331 Design Md

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/99

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 10:00 AM on 10/6/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

100 Terms

1
New cards
Design exists between ____ and _______
Abstract and Concrete
2
New cards
What does it mean to design the right thing?
Fulfilling the customer's mission
3
New cards
What does it mean to design the thing right?
How well we do our design job
4
New cards
What is cost committed?
Money set aside for future in the project
5
New cards
What is cost incurred?
Money already spent
6
New cards
Product Life Cycle
Idea -> Product Design -> Manufacture -> Operation & Maintenance -> Disposal
7
New cards
V-Diagram for Development
Planning -> Inputs -> Outputs -> Portotyping -> Verification -> Validation -> Changes
8
New cards
Kickoff

-Start of project
-Design brought in
-Budget shared
-Schedule shared

9
New cards

SRR (Systems Requirements Review)

Every requirement is presented

10
New cards
PDR (Preliminary Design Review)

Presenting the Design
CAD Models
Meeting the requirements

11
New cards
CDR (Critical Design Review)
Presenting finished design
12
New cards
How to pass PDR (preliminary design review)

-design meets requirements
-design supports cost and schedule
-all risks are identified
-all interfaces are defined
-verification methods

13
New cards

How to pass CDR (critical design review)

-design shows all details defined
-plans for procurements and fabrication
-cost and staffing is defined
-all component drawings exist
-all hardware and analyses are done

14
New cards
Design
A process to bring a solution from an abstract to concrete state
15
New cards
What percent of a project's budget is committed by the conclusion of conceptual design
70% - 80%
16
New cards
What are the 4 Product Characteristics

Purpose
Function
Operation
Form

17
New cards
1) Purpose
What is it for?
18
New cards
2) Function
What does it do?
19
New cards
3) Operation
How does it work?
20
New cards
4) Form
Geometry, Material, Construction
21
New cards
Behavior
Describes what the device actually does
22
New cards
Performance
The comparison of behavior and function
23
New cards
What is considered "Good Performance"
Function and behavior match
24
New cards
What is considered "bad performance"
Behavior falls short of function
25
New cards
What is a machine?
A device the does work
26
New cards
What is a simple machine?
A machine that does work with only one movement
27
New cards
Examples of Simple Machines
Level, Wheel & Axle, Screw, Pulley, Wedge, Inclined Plane, Gears?, Hydraulics?
28
New cards
IMA (Ideal Mechanical Advantage)

Geometry-based

Effort distance / Resistance distance
Input distance / Output distance

29
New cards
AMA (Actual Mechanical Advantage)

Output force / Input force

Resistive force / Effort force

30
New cards
Mechanical Percent Efficiency
(AMA / IMA ) x 100%
31
New cards

1st Class MA of Level

>1 , = 1, < 1


32
New cards
2nd Class MA of Level
MA > 1
33
New cards
3rd Class MA of Level
MA < 1
34
New cards
Examples of Design and Development Outputs
CAD models, Engineering Reports, Drawings, BOMs
35
New cards
Examples of Controlled Documents

Memos/Reports
Company Procedures
CAD Models
Drawings / BOMs

36
New cards
Minimal Requirements for "Control"

1) Document Number (with Unique ID)
2) Title - Description
3) Version Number
4) Change Management

37
New cards
Configuration Break
A period of time if the product does NOT represent the model/drawing
38
New cards
What are the two ways to document a change on a Controlled Document

1) Roll the Revision
2) Create a new document

39
New cards
When do you "Roll the Revision"?
For a minor change
40
New cards
When do you "get a new part number"?
For a major change
41
New cards
The 3 F's of Changes

1) Form
2) Fit
3) Function

If all 3 are unchanged, roll the rev

42
New cards
Benefit of New Part Number
You preserve the old design
43
New cards
Disadvantage of New Part Number
Cost is higher than rev changes (new parts, new BOMs)
44
New cards
Identification
A collection of qualities that establish uniqueness for each part
45
New cards
Definition
A collection of details that describes each part
46
New cards
Product Structure (Order)

1) End Item (Product)
2) Assembly
3) Part
4) Hardware/COTS
5) Material

47
New cards
End Item

Finished Product
May have children

48
New cards
Assembly

Collections of Parts
Have BOMs

May have children

49
New cards
Part(s)

-The simplest designed thing with a drawing

-Includes Materials (only material children)

50
New cards
Hardware/COTs
A component that was NOT designed, but purchased elsewhere
51
New cards
Material
Material, part number, description, revision #
52
New cards
What 2 characteristics should part numbers have?
Unique and Consistent
53
New cards
T/F A Bill of Materials (BOM) for a given drawing is a single-level section of the overall product structure pertaining to what is contained in the drawing.
True
54
New cards
What is a requirement?
A brief, complete statement that describes the "necessary functions and features" of the product
55
New cards
How are requirements grouped?
By type and hierarchy
56
New cards
What part of the development path are "requirements"?
Inputs
57
New cards
What is proper requirement structure?
[Device Name] + [Keyword] + [Capability Description]
58
New cards
Requirement Keywords
Shall, Will, Should, May, (Must)
59
New cards
Shall
Req is a "must-have"
60
New cards
Will
Req is a lower priority "must have" than shall
61
New cards
Should
Communicates a goal the customer is interested in (not binding)
62
New cards
May
Req is optional or a suggestion
63
New cards
Must
Equivalent to "Shall"
64
New cards
Important Requirement Attributes

-Specific / Unambiguous
-Current (time-based)
-Verifiable
-Singular
-Consistent/Correct
-Feasible

65
New cards
T/F Every requirement must have a way to be checked to confirm it was met by design
True
66
New cards
Method of Verifying Requirements

-Examination/Observation/Inspection
-Testing
-Demonstration
-Analysis

67
New cards
T/F Following kickoff, the design staff typically begins design tasks while the requirements are being firmed up.
False, we need requirements
68
New cards
Which requirement keyword is used the least
Will
69
New cards
Which requirement type usually needs to be very specific/longer?
Performance Requirements
70
New cards
Which verification methods draws the most scrutiny from customers and reviewers?
Analysis
71
New cards
Where do requirements, codes, and standard belong on the V-Diagram for Development?
Inputs
72
New cards

Codes (Regulations)

A level of adequacy for structures, machines, and testing. Often related to safety.
(Legally based / carries the law.)

73
New cards
Standards

Established Norms for uniform engineering processes
(No legal basis)

74
New cards
T/F You should utilize standards in design whenever possible.
True
75
New cards
Who governs "National Standards"?
ANSI - American National Standards Institute
76
New cards
Who governs "International Standards"?
ISO - International Organization for Standardization
77
New cards
5 Types of Standards

1) Specification
2) Tests/Verification Methods
3) Practices & Procedures
4) Definition of a term
5) Units of Measurement

78
New cards
What is the best practice for a designer if there are overlapping standard material specifications?

Choose one material and list that

79
New cards
What is a "Design Concept"?
A preliminary design intended to address system/product requirements
80
New cards
T/F Lots of concepts and variety is preferred
True
81
New cards
T/F Ideas = Concepts
False
82
New cards
What do "Design Concepts" look like?

Sketches (pencil or digital)
Basic CAD Models

83
New cards
What are the four product characteristics?

1) Purpose (what is it for?)
2) Function (what does it do?)
3) Operation (how does it do it?)
4) Form (what it made of?)

84
New cards
Popular Ways to generate ideas

1) Analogies (previous experience / designs)
2) Brainstorming
3) Reverse Engineering
4) Extremes (ask to change reqs)
5) Permutations (changes to function sequence)

85
New cards
Analogous Design
Use previous designs / concepts
86
New cards
"Extreme" Design Strategies
Propose changes to requirements to generate ideas
87
New cards
"Permutations" Design Strategies
Suggest changes to the sequence of a product's function
88
New cards
Morphology Matrix
A way to brainstorm design concepts by combining ways to meet product requirements
89
New cards
Where does "Conceptual Design" occur in the development process?
Right after SRR
90
New cards
What are the 2 Stages of Concept Evaluation?

1) With a designer
2) With a formal group

91
New cards
What are the 3 categories a designer evaluates concepts with?
Feasible, Conditionally Feasible, Unfeasible
92
New cards
Feasible

-Meets requirements

-No unacceptable risks

93
New cards
Conditionally Feasible
-Meets reqs except for a small obstacle
94
New cards
Unfeasible

-Doesn't meet requirements
-Unacceptable risk (low TLR - tech-readiness-level)
-No sponsorship

95
New cards
What is considered "The Heart of a Design Matrix"
The Criteria
96
New cards
T/F Criteria should be based on requirements where possible
True
97
New cards
Datum
A chosen design to act as a benchmark for comparing designs
98
New cards
According to Pugh's Method/ Decision Matrix, how many criteria is a good range?
10-15 criteria
99
New cards
What are the 6 boxes of a Decision Matrix?

1) The Issue (Product)
2) The Concepts/Alternatives
3) Criteria
4) Weighting / Importance
5) Evaluation / Scoring
6) Results

100
New cards

T/F Standards can overlap.

True
EX- Pipe has ANSI and ASTM