IB Design Technology HL - Topic 10 (Commercial Production)

0.0(0)
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
Card Sorting

1/13

Study Analytics
Name
Mastery
Learn
Test
Matching
Spaced

No study sessions yet.

14 Terms

1
New cards

Computer integrated manufacturing (CIM)

A system of manufacturing that uses computers to integrate the processing of production, business and manufacturing in order to create more efficient production lines.

2
New cards

Cost-effectiveness

The most efficient way of designing and producing a product from the manufacturer's point of view.

3
New cards

Just in case (JIC)

A situation where a company keeps a small stock of components (or complete items) or ones that take a long time to make, just in case of a rush order.

4
New cards

Just in time (JIT)

A situation where a firm does not allocate space to the storage of components or completed items, but instead orders them (or manufactures them) when required. Large storage areas are not needed and items that are not ordered are not made.

5
New cards

Kaizen

A culture of continuous improvement originating in Japan and considered an important aspect of an organization's long-term strategy.

6
New cards

Lead time

The time between the initiation and the execution of a process.

7
New cards

Lean production

A long-term production strategy that considers product and process design as an ongoing activity. It focusses on continual feedback and incremental improvement.

8
New cards

Quality assurance (QA)

This covers all activities from design to documentation. It also includes the regulation of quality of raw materials, assemblies, products and components, services related to production, and management and inspection processes.

9
New cards

Quality control (QC)

Involved in development systems to ensure that products or services are designed and produced to meet or exceed customer requirements and expectations.

10
New cards

Statistical process control (SPC)

A quality control tool that uses statistical methods to ensure a process is operating at its most efficient.

11
New cards

Value for money

The relationship between what something, for example, a product, is worth and the cash amount spent on it.

12
New cards

Value stream mapping

A lean production management tool used to analyse current and future processes for the production of a product through to delivery to the customer.

13
New cards

Environmental impact assessment matrix

A tool designed to identify and predict the impact of a product on the environment.

14
New cards

Workflow analysis

The review of processes in a workflow in order to identify potential improvements.