1
New cards

Project (PMI):

a temporary endeavor undertaken to create a unique product, service or result.

  • Characteristics

    • Has an established objective

    • Has a defined lifespan with a beginning and an end

    • Involves several department and professionals

    • Involves doing something never done before

    • Has specific time, cost and performance requirements

  • Operational duty is the responsibility 


2
New cards

Project Management:

planning scheduling and orchestration of project activities to achieve objectives within a specific period of time

  • Required skills:

    • Organizing, budgeting, staffing, monitoring, and communication 


3
New cards

Program vs. Project


  • Program: group of related projects designed to accomplish a common goal over an extended period of time. 

  • Project Management: a process of managing a group of ongoing, interdependent, related projects in a coordinated way to achieve strategic objectives

    • Project: completion of course in PM; Program: complete=ion of all courses in business major

    • Skill set should be aligned with project


4
New cards

Routine vs. Projects



Routine - class notes, Projects - term paper

5
New cards

Project Life Cycle: monitoring and  controlling should be done throughout (ex. Time cost and quality)


  • Defining Phase (initiation)

    • Goals

    • Specifications

    • Tasks

    • Responsibilities

  • Planning Phase (listing items needed)

    • Schedules

    • Budgets

    • Resources

    • Risks

    • Staffing

  • Executing Phase (doing project)

    • Status reports

    • Changes

    • Quality

    • Forecasts

  • Closing Phase (finalization phase of project)

    • Train customer

    • Transfer documents

    • Release resources

    • Evaluation

    • Lessons learned


6
New cards

Defining the Project Manager’s Roles


  • Assigned to complete task:

    • Manages temporary, NON REPETITIVE activities; acting independently form the formal organization 

  • Marshals resources for the projects

  • Communicates as the direct link to the customer

  • Works with a diverse troupe of characters

  •  Responsible for performance and success


7
New cards

1.2 Agile Project Management.

  • Rolling wave by Larson Gray - progressive project management technique where near‑term work is planned in detail while future tasks are outlined broadly and refined as more information becomes available.




  • Emerged from the frustration of traditional PM processes = software development

  • Being used across industries to manage projects with high levels of uncertainty

  • Employs incremental, iterative process referred to as “rolling wave”

  • Active collaborate between project and customer = for smaller functional pieces

  • Works best in small teams (4/8 Members)

  • Often used in the defining phase to set specifications and requirements, followed by traditional methods for planning, execution, and closure


8
New cards

1.2.1 Agile burgers


  • APM - flexible, iterative design and build process

    • Agile Projects are characterized by a series of tasks that are conceived, executed and adapted rather than a pre-planned process

    • Respond to unpredictability, incremental work processes

  • Emphasize adaptability along with adequate ongoing communication with the project team and client = reduce risk and better end product IF unprecedented events occur


9
New cards

Linear vs. Adaptive (Agile) Project Management


Aspect

Linear (Predictive)

Adaptive (Agile)

Process Flow

Sequential phases: Initiating → Planning → Executing → Closing

Iterative cycles: short sprints/iterations

Planning Detail

Scope, schedule, and cost baselines locked early

Scope refined progressively as project evolves

Tools Used

Gantt charts, CPM, WBS

Agile boards, burndown charts, sprint reviews

Stakeholder Role

Limited after requirements are set

Continuous collaboration and feedback

Best For

Stable projects (construction, compliance, manufacturing)

Dynamic projects (software, R&D, innovation)

Risk/Benefit

Rigid; costly if requirements change mid‑project

Flexible; lower risk in volatile settings


10
New cards

Rolling Wave Development

  • Iterations - last 1 to 4 weeks

    • Goal of iterations: make tangible progress such as:

      • Define key requirements

      • Solve technical problems

      • Create desired features to demonstrate to the customer

    • End of each iteration: progress is reviewed, adjustments made = beginning a different iterative cycle

      • Every new iteration = applying past iterations until project is complete and customer is satisfied


11
New cards

1.3 Current Drivers of Project Management.



Factors leading to increased use of project management:

  • Compression of the product life cycle

  • Knowledge explosion

  • Triple bottom line (planet, people, profit)

  • Increased customer focus

  • Small projects represent big problems


12
New cards

1.4 Project Management Today: A Socio-Technical Technical Approach

Technical Dimension (Science):

  • Consist of formal, disciplined, purely logical parts

  • Planning -> Scheduling -> Controlling



Sociocultural Dimension (Art):

  • Contradictory and paradoxical world of implementation 

  • Centered on creating a temporary social system in a larger organizational environment combining talents of divergent professionals.