1/44
Looks like no tags are added yet.
System weaknesses, fraud or errors, personnel changes, business strategy, new technology, cost reduction, changing information needs and regulatory requirements.
Transformational change makes a major change at once, often with greater disruption;
incremental change introduces improvements gradually, allowing adaptation and review.
Initial costs are incurred when implementing the change;
recurring running costs are included for each year of the assessment period.
Evaluate the existing system
recommend solutions
communicate with stakeholders
train users
implement the change
review its effectiveness.
Implementation follows a planned timetable with testing and safeguards;
review checks whether objectives were achieved and identifies any corrective action needed.
The old system is replaced on a designated date.
It can be fast and inexpensive but carries higher risk of disruption, errors or failure if the new system is not ready.
The new system is introduced in stages or departments.
It allows testing and adjustments with less immediate risk, but takes longer and requires coordination.
Old and new systems operate simultaneously so outputs can be compared.
It reduces data-loss and processing risks but duplicates work and increases costs.