1/99
Looks like no tags are added yet.
An organization achieves quality by consistently meeting its competitors’ standards.
False
Regardless of superior quality, consumers will not pay premium prices.
False
Reducing the variability in our product or service is an important key to qualty.
True
Medical malpractice claims are an example of how poor quality can affect an organization through liability.
True
Convenience, reliability, and assurance are dimensions of service quality.
True
Cost of inspectors, testing, test equipment, and labs are examples of appraisal costs.
True
Modern quality management emphasizes finding and correcting mistakes before they reach the customer - catching the errors before they are shipped.
False
Six Sigma programs have both management and technical components.
True
When considering service quality, convenience often is a major factor.
True
The purpose of benchmarking is to establish a standard against which the organization’s performance can be judged and to identify a model or possible improvement.
True
A quality circle is a management team focused on implementing major changes to improve quality.
False
Total quality management attempts to involve everyone in an organization in the effort to achieve quality.
True
The “Control” phase of DMAIC is intended to ensure that
improvements are sustained
A tool that is not used for quality management is a
redesign
The quality tool which helps focus on the most important problem areas based on the 80-20 rule is
Pareto analysis
The quality tool that resembles a “fishbone” is
cause-and-effect diagrams
In order for TQM to be successful, it is essential that most of the organization be
in agreement with the philosophy and its goals
The process of identifying other organizations that are best at some facet of your operations, analyzing your performance versus theirs in order to establish a standard against which to judge performance, and identifying a model for learning how to improve is known as
benchmarking
Giving workers responsibility for quality improvements and authority to make changes is known as
employee empowerment
Managers have obligations to a wide variety of stakeholders such as shareholders, employees, and customers. When considering outsourcing production to offshore suppliers, managers have to weigh
I. cost benefits that might make shareholders wealthier.
II. quality issues that might make firms less productive and/or products riskier.
III. the investments already tied up in relationships with existing suppliers
I, II, and III
If customer satisfaction does not always lead to customer loyalty, firms may need to focus additional effort on _________ strategies.
retention
Which of the following is a tool that is widely used for assessing service quality?
SERVQUAL
Approving the effort that occurs during the production process is known as acceptance
False
Statistical process control is the measurement of rejects in the final product
False
Processes that are in control eliminate variations
False
Concluding that a process is out of control when it is not is known as a Type I error
True
Range charts are used mainly with attribute data
False
A p-chart is used to monitor the fraction of detectives in the output of a process
True
Control limits tend to be wider for more variable processes
True
Patterns of data on a control chart suggest that the process may have nonrandom variation
True
Run tests are useful in helping to identify nonrandom variations in a process
True
The best way to assure quality is to use extensive inspection and control charts
False
Attribute data are counted, variable data are measured
True
Range control charts are used to monitor process central tendency
False
The assurance that processes are performing in an acceptable manner is the focus of
quality control
Acceptance sampling, when it is used, is used
I. before production
II. during production
III. after production
I and III only
Which of the following quality control sample statistics indicates a quality characteristic that is an attribute?
proportion
A point which is outside of the lower control limit on an R-chart
should be investigated because an assignable cause of variation might be present
A shift in the process mean for a measured characteristic would most likely be detected by a
x-bar chart
The range chart (R-chart) is most likely to detect a change in
variability
The purpose of control charts is to
distinguish between random variation and assignable variation in the process
Organizations should work to improve process capability so that inspection efforts can become more
unnecessary
The basic issues of inspection include all of the following except
what will be the total cost involved
The greater the volume of the process being targeted for inspection, the more attractive _______ blank inspection is
automated
The approaches to quality assurance are
inspection alone, process control, and continuous improvement
Value stream mapping is a technique focused on finding new ways of adding value for critical stakeholders such as customers
False
Quality and highly capable production systems are requirements for the successful implementation of lean operations
True
Lean systems often use layouts that are based on multiple manufacturing cells
True
A goal of lean operations is to produce output using fewer resources than traditional planning systems
True
The lean philosophy recognizes that some work-in-process inventories are a necessary investment to allow for smooth work slow
False
In lean operations, a responsibility of the worker is to check the quality of their work
True
Limited WIP lowers inventory carrying costs but reduces flexibility
False
Engineering changes should not be made in the six-month period following the introduction of a new product
False
Lean purchasing requires frequent contract bidding by multiple sources to ensure the buyer of competitive prices
False
Setup time and its associated cost can often be reduced by the use of group technology
True
One problem with lean operations is that they can lead to much stress on workers due to their increased responsibility for process and quality improvement
True
The lean philosophy suggests that workers are
assets
Which of the following would you not expect to see in a lean environment?
a significant number of daily schedule changes
Which of the following does not contribute to reduced setup time and cost?
custom setup procedures for each product
The kaizen philosophy applies to __________
waste
Process design that supports lean does not include
duplicate facilities
A successful conversion to a lean system requires that the conversion
convert vendors to lean as one of the last steps
With regard to suppliers, lean systems typically involve
long-term relationships
A common objective of both MRP and the lean philosophy is to
reduce (and ultimately eliminate) “excess” inventory
Which of the following would not contribute to making services more lean?
have service workers handle multiple tasks simultaneously
Which of the following is not a risk of lean systems?
reduced cycle time
Breakdown programs often are prioritized such that some equipment gets a lot of attention and other equipment gets very little. This typically reflects the fact that breakdowns are consistent with
Pareto phenomena
The goal of maintenance is to maintain the productive system in good working order while minimizing
total maintenance costs
Factors affecting the decision of how much preventative maintenance is desirable typically include all of the following, except
type of product
Preventative maintenance is generally scheduled on the basis of
all of the choices
Ideally, preventative maintenance will be performed
just prior to a breakdown or failure
Attempting to determine when preventative maintenance activities should be performed is called
predictive maintenance
In the broadest sense, equipment and facilities preventative maintenance extends back to the
design and selection stage
A reactive approach to maintenance is _______ maintenance
breakdown
Which of the following is the primary consideration with regard to preventative maintenance?
how often the maintenance will occur
Which of the following would not improve the performance of a breakdown program?
reducing inventories of spare parts
The goal of aggregate planning is to achieve a production plan that effectively utilizes the organization’s resources to meet expected demand.
True
The assignment of work to specific machines and people are examples of aggregate planning.
False
Seasonality in demand has the advantage of leveling out requirements for our product or service.
False
Ultimately the overriding factor in choosing a strategy in aggregate planning is overall cost.
True
Aggregate planners commonly use trial-and-error methods in developing aggregate plans.
True
The use of tables and charts in aggregate planning usually enables planners to arrive at an optimal plan.
False
Aggregate planners typically use mathematical techniques such as linear programming for planning.
True
Subcontracting “in” would apply to periods in which our organization has excess capacity.
True
A time fence in the master schedule is used to prevent changes to the schedule within the frozen section.
True
After the first period of the planning horizon, available-to-promise is computed only for those periods in which there is no MPS guarantee.
True
Aggregate planning is capacity planning for
the intermediate range
One area in which aggregate planning decisions are made is
inventory levels
Aggregate planners attempt to balance
capacity and demand
One option for altering the pattern of demand is
pricing differentials
Which of the following would not be a strategy associated with adjusting aggregate capacity to meet unexpected demans?
use back orders
One option for altering the availability of capacity is
use of overtime or slack time
Moving from the aggregate plan to a master production schedule requires
disaggregation
Proactive and reactive aggregate planning strategies are best associated with
demand and capacity options
Which of the following are typically in play in a circumstance in which yield management is worthwhile?
I. perishable capacity
II. ample finished goods storage
III. demand variability
IV. low holding costs
I and III only
Aggregate planning for services is more difficult than aggregate planning for manufacturing because _______ and ________ are more difficult to predict.
demand; capacity availability
When the opportunity cost of lost revenue is relatively high, ________ become(s) relatively more attractive.
excess capacity
Which of the following differs between aggregate planning in services and aggregate planning in manufacturing?
costs of storing inventory
Which of the following steps in necessary to ensure that a master schedule is valid?
rough-cut capacity planning
The following are important considerations when developing a strategy to meet uneven demand
flexibility, costs, and company policy