1/59
Looks like no tags are added yet.
What does runoff refer to?
In hydrology, the term “runoff” refers both to:
The process of water moving overland or in the subsurface toward streams
Toward stream: up to downhill
Overland or subsurface
Draining of watershed area
Volume of streamflow/watershed area = depth -> runoff
Streamflow is volume per time, runoff is depth per time
Streamflow divided by watershed area
What is in the water budget?
For its use in a water budget, it is the latter (streamflow divided by watershed area) that enables you to take a realistic measurement and apply the same units as precipitation and ET so you can do the +/- math.
Input – outputs
Streamflow/watershed area -> allows to use realistic measurement and apply same measurements
Realistic measurements: assume that streamflow represents what's happened form landscape over time -> take 3d volume/area -> normalized depth of runoff
To make calculation -> good
Actual runoff movement -> iffy
Need everything as same unit
What is approximate peak runoff from storm hydrograph in mm per hour?
Small stream in area
Station where to measure streamflow: subject to lots of forestry objects
Low streamflow (single digits)
7.5 L/s -> cm^3 + watershed area


2. If average streamflow above for the storm is 3.5 L/s, about how many mm of total storm runoff?

What is the Runoff Ratio or Coefficient (RC)?
A measure of the amount of precipitation input that is observed as discharge
Take total runoff for a storm/ total prec that needed to have occurred for the storm runoff to happen
Ex: RC = 43.2 mm/75 mm = 0.58
58% of prec that went in came off as runoff
During rain: air is already saturated -> ET is not often
Mostly to soil storage, puddle (ex: depressions) , snowstorm (storage)
Remember, water inputs can go OTHER PLACES…
ET, seepage to deep ground water, and STORAGE (e.g., increases in soil moisture)

What are some Some Typical Runoff Coefficients?
Meadow: 41% runoff
Urbanized area -> max runoff areas approach 100% of prec input
Rare for 100% because of puddles in depressions, hydrogen bonding holding to roof and then evap even in paved areas
Most prec coming is observed as runoff
Rainfall: 75-95% of prec turns into runoff in roofs
Collect water -> measure volume/area of roof
Also need to know amnt of prec
Also gets hydrogen bonded to the roof -> ET
Forst: interception loss
Depressions storage
Forest
Leaf and litter interception
Soil storage
Movement to GW
Not into runoff in timescale that is being measure

How can pervious storms impact other storms?
Storm -> take up soil storage -> can raise GW and lead to overground water saturation flow or reduce infil capacity (less tension -> less infil capacity ) -> more overland runoff in the second strom
Antecedent moisture conditions:
Conditions happen prior to the storm
FINAL EXAM QUESTION
What factors affect streamflow responses to prec inputs?
Aspects of landscape that effect how streamflow responds to prec input
Watershed size
Topography
shape
aspect/orientation
Geology
Soil
Storage in watershed
How does watershed size affect streamflow responses to prec inputs?
Generally, greater streamflow for larger watershed because more precipitation falling on a larger area
Larger land mass to collect prec and falling on larger area -> moving toward stream
Ex: Missipi river is a huge watershed -> go to gulf stream
How does topography size affect streamflow responses to prec inputs?
Flow directions perp to contour lines
Velocity of flow: watershed with steep slopes -> transfer ability of water from landscape to stream is quicker than flatter landscape
Significant topographic relief -> quicker and sometimes greater response of flow compared to flatter topographic relief
How does shape affect streamflow responses to prec inputs?
Circular (fan-shaped) watershed tend to have high rates of runoff because flow from various parts of watershed tend to reach outlet at similar time, but high rates shorter-lived
Circle
Movement of water equal in time and space -> get to outlet at same time
Hydrograph: total runoff doesn’t change -> shape (ex: peak runoff) would be higher in the left than right in same area
Go to outlets at similar times
Also come down more quickly
High peak flows
Hydro response can be short lived
Rain stops -> similar lengths -> all stop near the same time
Right
Smooth out the hydrograph
Not all water arrives at same times
Affect shape of hydrograph
Longer reaches -> take longer -> elongates response time and how long hydrograph? exists well above base flow

Aspect vs orientation?
Aspect: direction major hillslope is facing
Orientation: major axis direction of basin (i.e., east-west, north-south, etc)
How does aspect affect streamflow responses to prec inputs?
Aspect: direction major part of watershed is facing
Important control with landscape with sig topography
Watershed on side of mountain is facing north -> north facing aspect
Facing south -> south facing aspect etc
Flatter landscape
Aspect has smaller influence
West aspect has more runoff than east
Winds west to east ->hillslope catches rainfall more easily on the west compared to East
Large difference with snow
North facing slopes in Northern hemi temperate -> hold snow for much longer but not as much solar radiation
South facing slopes get more radiation -> melt earlier -> impact hydrograph based in snow
How does orientation affect streamflow responses to prec inputs?
Orientation:
Upper reaches of water shed is in the east, lower parts that draining is west -> east west orientated watershed
North hemi
Less energy from sun
Impacts how much and when streamflow responds to snow melt or incoming prec
West facing in north hemi
More rainfall
Storms tend to move from west to the east -> west facing aspect catches more rain than east facing
More important with snow
East facing slope is conducive to downhill movement with wind moving it out of water shed
Orientation rainfall delivery
Storm moving west -> east
East west orientated water shed
West (where outlet of stream is) -> receiving the rainfall first and outer parts receive rainfall later
Rain falling near outlet -> quicker response in streamflow
Wind: west to east most common in Toronto
West to east watershed
East to west: receive prec earlier on that reach outlet (outlet in the west)
Frontal system follows wind direction -> starts prec near outlet
North to South watershed
What is streamflow response measured?
Response:
How quick hydrograph goes up from base flow to peak flow
How large peak flow is
How long storm lasts
From start of rising limb towards end of falling limb
How does geology affect streamflow responses to prec inputs?
Affects
soil formation
thickness
slope/gradients
drainage
partitioning of surface and subsurface flows
How much water goes over surface vs subsurface
Watershed boundaries -> makes topography that makes boundaries
How does soil affect streamflow responses to prec inputs?
Soil properties can affect hydraulic parameters
Makeup can help determine likelihood of macropore formation/earthworm activity
All affect how quickly water moves in subsurface, if it moves in subs at all, how quickly in subsurface
Impact on quickly streamflow response to prec
Most flow forces over land in HOF -> responses quick and large
Permeable surface soil with lots of infil capacity -> drain into subsur -> not as fast toward stream
Unless major macropore (but still slower than overland)
How does storage in watershed affect streamflow responses to prec inputs?
Are there lakes, wetlands and other major surfaces stores of water?
Rain event happen -> are there places in watershed that terminate/slow flow because of flatness of features or concavity of features
Ex: lakes, wetlands, huge ponds
Is there depression storage areas -> water enter and it stops and stops moving since they have large storage capacity
Is there substantial frozen water (snow and ice) in the watershed?
Impact how timing works from input of prec (snow, rain) and when it comes out as stream flow
Has it rained recently or not for a long time (“antecedent moisture conditions”)?
Antecedent
Watershed recently rained in watershed -> likelihood of storage being higher is larger -> not much more room for storing water -> more come off as runoff -> greater and quicker response in runoff
Not rain recently -> large storage capacity that needs to be filled before runoff is generated that goes int stream to see streamflow response
Watershed might just suck up water and not see a stream flow response at all
Antecedent: moisture conditions before the event occurred (wet or dry)
What is the hydrological regime?
the entire state of water movement in a watershed.
Regime: Hydrographs on a yearly basis
General pattern
Hydrological regime Toronto = urban based, water on surface
What is a runoff regime?
the characteristic response of runoff in a watershed given its climate and geography.
The annual hydrographs of watersheds from different climates and areas of the world can say a lot about the “runoff regime” for that area
Climate is imp
Identify principle processes that are most imp in streamflow generation in a area given its particular climate
What is a hydrograph?
Hydrograph: any graphic that looks as streamflow (SF) or runoff over time
What are important runoff regimes in Canada?
Nival Regime: snowmelt-dominated
Pluvial Regime: rainfall-dominated
Glacial Regime: glacier-melt dominated
What is a Nival Regime?
Hydrograph over entire year (not storm based)
Integrate under curve -> mast majority of flow is in the spring
Characteristic snowmelt in March that causes big peak and sustained -> large stream flow in March/April
The dominant regime in Canada

What is the dominant regime in Canada?
In Canada, normally associated with a major peak in flow during March or April.
THE dominant regime in Canada.

What is a Pluvial Regime?
Usually in west coast
Temps are rarely cold enough for sig snow accumulation to allow for big spring melt
Temps stay above 0 for most year -> winter rainfall dominants annual hydrograph
Major flows in the winter -> lots of rain + nots lots of energy that’s reducing amnt of storage -> when wet -> producing lots of runoff
Constant high antecedent conditions
Where can you find the Pluvial Regime?
Geographically, most closely associated with the west coast of Canada (i.e., Vancouver Island).
Here, temperatures are rarely cold enough for significant snow accumulation. Winter RAINFALL dominates the annual hydrograph.
What is a glacial regime?
Peak flows are shifted into May, June, July -> vast majority of glaciers at high latitude and high altitude
Glaciers at high latitude and altitude -> not be subject to warmer melt level sustained temp until later in season compared to snowmelt dominated -> peak shifted towards summer
Places fed by rock mountain glaciers, Alberta -> dominated by long term stores of water and ice in glaciers that are melting later on because they are at high altitude
Also in arctic islands
Latitude feeds them (big ice way up North)
Dominant springish
Coming down in July and August -> not a nival regime
Shift of timing in which domination of runoff happens
Glaciers exist at high latitude or altitude
Get warm enough to melt ice later in the year in these areas

Where can you find the Glacial regime?
SUMMER melting of mountain glaciers dominate the hydrograph. Peak flows generally sustained for a while in May, June, and/or July.
Geographically, most closely associated with places fed by Rocky Mountain glaciers.

How do you measure streamflow?
Discharge = flow velocity x cross-sectional area
Stream moving at certain velocity with cross sectional area
m/s x m^2 area of stream = volume per time (cm^3/time)

What is stream gaging?
the process of measuring discharge
Where criteria is there for the location of stream gaging?
Stream gage: process of measuring discharge
Where you measure discharge is what the purpose is
Trying to measure water budget of water shed
Measure streamflow near emptying point
Not always possible
Should be:
1. Easy access
2. Areas where groundwater flow is minimal and flooding of banks unlikely
Stream's channelized and not dominated by gravel, boulders , where GW flow and interactions between stream and banks are high.
3. Areas where backwater conditions are unlikely.
Backwater: large slowdown of stream flow
Ex: large change , drip, or upward part of stream -> turbulence or backward flow momentarily
Want place with straight forward directing flow
4. Relatively straight stream reaches.
Southern Ontario -> dominance of meandering stream reaches -> glacial influencing land scape
Areas btwn streams where they are straight
Less turbulence and easier to make accurate measurements of velocity
How is streamflow measurement based on?
Usually measure streamflow based on what
Where you are measuring depends on Question trying to answer
Watershed: outlet of watershed
Most watersheds in Toronto: most interest in outlet into lake ontario
Backwater
Where water goes backwards
Straight stream: 100+ meters minimum
What is the velocity area method?
Measure velocity of water and the area it is moving through
Square pipe: length x height = area
M^2
Velocity: speed water moving
m/s
Vxarea = streamflow

What does a pygymy meter do?
Top middle: pygmy meter
Water catches cups-> faster the water is moving the faster the cups are moving -> tells you m/s (stream flow velocity)

What does a torpedo do?
Back tail twists in relation to stream flow velocity

What is a doppler velocimeter?
Uses sound and bounces it off particles in water -> uses doppler effect to find how fast water is
Dopller effect: slower movement -> more elongated sound
Bounding stream off of particles in stream
Going fast -> certain sound as doppler bounces back at thingie
Relate return of sound -> how fast they're moving
Doppler effect
Sound bouncing off something and sound coming back to you that depends on how fast the thing moving is bouncing the sound back off of
Bounce off particles in water moving at similar velocity as the water -> associate the timing of sound to milliseconds and in 3d (forward, left, right, down, up)

What is a more manual way to measure stream flow velocity?
Weighting rod (bottom left) -> attaches a meter
Tape measure to. Measure area + depth
Velocity in field
Test question
What way is the river flowing? : right to the left
Stand down stream -> water moving front to behind them
Stay out of the way of the velocity field

What is the cut off for pygymy meter/hand held meters?
0.75 m
What are the different depth methods to measure volocity?
6/10 Depth
2/t0 and 8/10 Depth
When is the 6/10 Depth method used?
When stream depths are <0.75 m, average velocity is generally assumed to be representative at 6/10 depth below surface (4/10 depth above bottom)
Below stream depth of 0.75m
Take one velocity at 6/10 of depth (0.6 from top, closer to bottom ) -> take as the avg v

What do you use when the stream is greater than 0.75 m?
In deeper streams, the average of measurements made at both 2/10 and 8/10 depths are usually taken.
Measures at 20% of depth and 80% of depth -> take avg of measurements
As streams get deeper -> take avg
When stream is deeper than 0.75 m

What does the velocity change along a profilie?
Closer to banks and bed -> more friction from sediment -> velocities lower
Highest v at the surface
Final exam: have section less than 0.75 and parts with more -> take avg of sections


How to measure the velocity in this image?
Triangle: a = 1/2bh near the banks
1-2: triangle + rectangle
Areas tend to measure are uncertain measurement of rectangles and triangles
Delineate areas -> take v in the middle of each of the areas
0-1: less than 0.75 -> just .6
2-3: .9 m -> do .8 and .2 -> take avg and them multiply by area
V x area for each of the 7 section
Each one would have a discharge/streamflow measurement -> add them together -> overall stream flow
Calculate v x area of each section -> add them together -> total discharge/streamflow that exists in the stream during that period of time
Measure at each point in hydrograph ->. only way to do it


When do you use dilution gauging?
Alternative methods for estimating streamflow
Use in streams that is difficult to use instrument to measure v or area
Ex: mountain streams where stream bed is made of large rocks -> water flow through them and can't get tools between these rocks

How does dilution gauging work?
Mixture that is salt or dye (usually salt because its cheap)
Concentration and meter it in at a known rate ->
Add salty solution to stream -> still salt by the time it gets mixed in -> low discharge
Not lots of water -> not dilute as much -> still salty
Lots of water would dilute the signal -> not a salty
Use when instruments in stream is difficult
Ex: difficult with big streams (lots of salt needed)
Little streams: salt good
Instruments too big for small stream
Add salt upstream
Measure conductivity: saltier stuff conduct more electricity
Other measure downstream -> two measurements downstream math each other in time -> know that salt is mixed
At least 20x more down than stream than how wide it is
If it matches -> well mixed -> use equation
Solution becomes dilute once added -> lots of water flowing by that dilutes mixture
More flow in stream -> less impact that adding solution has on what is downstream
Small flow -> downstream might have higher relative concentration because less flow coming in
Measure amnt of dilution in relation to amount of tracer added

What is the equation for dilution gauging?
Q = discharge
Qi = injection rate (constant rate)
Ci = concentration of dye/salt in injection solution
Cd = concentration downstream after mixing length and stabilization of concentration at mixing length
Cu = concentration upstream/ background concentration already in stream
Cu: even freshwater has salinity -> remove background salinity
If you use florescence as tracer, usually no back ground florescence


Q= (2) x (35-0.25)/(0.25-0.1) = 463 L/min
What is the rating curve?
Try to obtain continuous record of streamflow -> not practical to use people to measure all the time
Try to relate series of streamflow measurements to more easily measured and continuously measured variables
Depth of stream itself (stage, also (H-h0)
Stage = how deep the river is in relation to particular datum
Relate discharge to depth of stream/stage because it's easy
Measure discharge across diff flow scenarios (low to high flows) -> relate to stream depth at any one time
Rating curve: relationship btwn multiple measurements of discharge at same time of measurements of stage
Constantly measuring v is difficult
Constantly measuring water level in stream is easy
Flow goes up in stream -> higher depth
Unless it floods and stops getting higher
Channelized stream -> depth goes up as flow goes up

How to make a rating curve?
Relationship that is log vs log linear
Log (h-h0) -> height of stream in relation to a datum
Log (depth of river)
Log(q) = flow
Need to calibrate at points ->
(each point is a measured flow + depth of river at the same time)
-> take line of best fit -> use equation to make calibration curve
Take digital level -> apply calibration curve with an equation to the depths -> give estimation according to depth

How to use a rating curve?
Calibrate stream depth with certain discharge -> use cont measurements of stream depth to estimate discharge to estimate times where you aren't there
Something in stream that measures stage every hour/day/week -> apply equation that fits curve
X = stage
Give estimate of discharge
Make calibration curve using previous methods-> apply curve to sample that you don't know discharge
Velocity constantly changes as depth constantly changes
Measuring constantly is also costly
Measuring stage is easy

How does a gauging station work?
Measuring depth/stage of river -> use gauging station
Concrete well
well stills the waves in stream
Pipes that connect well and stream
When river levels go down -> levels in well go down to same level
Same when river goes up
Levels in well under gauging station and adjacent to stream -> same as levels observed in stream
Measure well water depth with the right image tools
Float encounter weight
Float on top of water -> weight overtop of wheel
Water level go down -> flat goes up (counter weight makes sure it stays there)-> wheel turns -> how far wheel turns and pen writes how much it turns
How much it turns -> measures water level going up and down
Shaft encoder: measures pressure from bottom -> digital
On a cont basis -> how water level goes up and down
Relate how water level goes up and down to equation above -> gets discharge measurement
Use data through time to get hydrograph
How to measure cont. Methods of discharge

What do weirs and flumes do?
Weirs and flumes restrict cross-sectional area of streams
Don't have to put something in -> but good for more accurate information
Especially long term
measuring flow sometimes -> relate to depth -> use it to make estimate of flow
Easier and more accurate and sensitive between relationships with flow if you constrain the width
Estimate flow with relationship with depth
Some streams just start to widen instead of deeper -> larger flow not through depth
Curve looks bad with this
Structures put into stream to make discharge measurements more accurate
Research grade measurements for flow
Gov body needs to know
Can't find places on streams where banks aren't flooded or don't erode a lot etc that can lead to issues to making gauging methods (can't measure depth and realte to discharge)
Both Restrict cross sectional area at time -> give idea of cross sectional area

What is a weir?
Weir: restricts depth to flow over a notch that is raised above the stream bed (limits depth of flow)
Cheaper and easier to install, and generally more accurate than flumes,
but require an available drop in head and relatively regular cleaning
Pros and Cons
Cheap
Easier to install
More accurate than most flumes
Require gradient to stream
Can't be a flat stream
Need somewhere (like small waterfall)
Need maintenance
Not used for large streams

What is a flume?
restricts both depth and width
More expensive to install, but generally self maintaining
Pros and Cons
Self- cleaning
More expensive (larger)
Easier to maintain
Can be small to large
What do flumes do?
Left: water enters -> restrict depth and width
Something in flume that keeps track of depth of water in flume
Measure water level in flume
Geometry of flume -> measure volume of discharge at any one level of water in flume
More expensive
Don't need dropoff in topography
Works well in straight shot streams
Accurate: restricts width
What is a throat?
Or make a throat: but two boulders to make stream narrower
Force a higher rise in flow -> better calibrated rating curve
Error or flow measurements can be 40% -> throat method brings it down to 5%

What are the parts of the weir?
Right: like a dam across stream with notch
Water builds up behind -> flows over v notch
Left: v notch
Pipe that measures stage behind weir
Higher flow over v –notch -> higher discharge
Usually no weir in a straight no topographic change (bottom right bad image)
Use geometry in order to make estimate of flow over time
White pipe (water level equipment) +gauging station

How do you measure flow over a weir?
Everything in SI units
Cd = discharge coefficient; determined in relation to vnotch angle
Don't have to know this equation
Know geometry on how water flows over v notch
Doesn't require curve to measure flow
Uses geometry and engineering equations to calculate of height of v notch (changes through time) -> assess flow
Flumes and weirs are more accurate by restricting depth and width
Don't need rating curve, just geo of measuring discharge

What issues can rise with weirs?
Weirs simple to put in, but:
High sediment load (ex: losts of particles) -> weirs act like dams and need to be cleaned often to clear out stacked sediment
Forms small pond behind the weir
Water quality issues can be affected by ponding -> weirs could impact it
Some places don't have room for ponding and it will travel around the weir
Weirds and flumes can change accuracy on diff levels

What is a stage?
Water level = stage