Cycle Time
CT = Processing Time at Bottleneck Station
Throughput Rate
TR = 1 / Cycle Time
Maximum Output per Day
= Available Production Time per Day / Cycle Time
Little’s Law
Average Inventory = Throughput Rate × Average Flow Time
Break-Even Point
= Fixed Costs / (Selling Price per Unit − Variable Cost per Unit)
= FC / (SP - VC)
NB: Round up
Multi-Product Break-Even Process
CM₁ = P₁ − V₁ and CM₂ = P₂ − V₂
use sales mix ratio to relate quantities (e.g. Q₁ = kQ₂)
set F = CM₁Q₁ + CM₂Q₂
substitute using mix
solve for units
Revenue = (Q₁ + Q₂) × P;
Number of Kanban Cards
K = (Demand Rate × Lead Time × (1 + Safety Factor)) / Container Size
= (D*L(1 + S)) / C
NB: Round up
Break-Even Revenue
Revenue = Break-Even Quantity (BEP) × Selling Price per Unit
Target Profit Quantity
= (Fixed Costs + Target Profit) / (Selling Price − Variable Cost)
= (FC + Target profit) / (SP - VC)
Weighted Contribution Margin
WCM = Sum of (Contribution Margin per Product × Sales Mix Proportion)