3.2 Hotel Development: Process, Feasibility, Location, and Design

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/29

flashcard set

Earn XP

Description and Tags

Comprehensive flashcards covering hotel development stages, feasibility analysis, location types, financial estimations, accessibility, and architectural design principles.

30 Terms

1
New cards

What are the five main stages in the hotel development process?

The five stages are: 1. Conceptualization, 2. Feasibility Analysis, 3. Commitment, 4. Design and Construction, and 5. The Opening.

2
New cards

What key business questions must a developer answer during the Conceptualization stage?

Questions regarding the source of capital, expected return on investment, macro and micro market conditions, target audience, facility size, unique competitive positioning, and current and projected demand for room nights.

3
New cards

What is the primary objective of conducting a Feasibility Analysis?

To determine whether the project is feasible and capable of being carried out successfully by providing evidence that supports or rejects the concept and determining if the hotel will generate sufficient profit to meet investor expectations.

4
New cards

What specific operational factors are projected by a hotel feasibility study?

Room rates, occupancy levels, operating expenses, and the necessary capital investment required for acquisition, construction, and ongoing operations.

5
New cards

In hotel development, what does the term "stabilization" refer to during the Commitment stage?

The point at which the hotel reaches viability, requiring funding to cover operating expenses in addition to construction costs until operations become viable.

6
New cards

What managerial and operational actions occur during the Design and Construction phase?

Management or franchise agreements are formalized, management and operating staffs are mobilized, and preliminary marketing and personnel training begin.

7
New cards

What activities take place during The Opening stage of hotel development?

Sales and marketing staffs become fully operational to ensure guests from the first day, all front- and back-of-the-house staff are trained and prepared, and the facility opens for business.

8
New cards

Why is location considered the most influential factor in a hotel's potential success?

Studies show that most guests rate proximity high on their list of deciding factors when choosing a place to stay.

9
New cards

What are the five classifications of lodging facilities based on location?

  1. Airport Properties, 2. Downtown Properties, 3. Suburban Properties, 4. Highway Motels, and 5. Resorts and Attractions.
10
New cards

What are the key characteristics of Airport Properties?

Originally built for flight crews and delayed travelers, they average a minimum of 100100 guest rooms, provide banquet/convention facilities directly competing with downtown convention hotels, and offer transportation ranging from moving sidewalks to shuttles.

11
New cards

Why are Downtown Properties predominantly high-rise structures, and what occupancy trend do they exhibit?

They are high-rise structures due to limited inner-city land and high development costs; they have higher average room rates and experience higher occupancy rates on weekdays compared to lower occupancies on weekends.

12
New cards

What typical size and height constraints govern Suburban Properties?

Height and size-zoning guidelines limit most suburban hotels to mid-rise buildings containing 200200 to 500500 rooms.

13
New cards

What architectural and operational features define Highway Motels?

Simple one- or two-storey exterior corridor structures with fewer than 200200 rooms, free surface parking, separate public space/registration areas, and complimentary breakfast and workout facilities for transient guests staying an average of one night.

14
New cards

How must Resort properties compensate for being built away from population centers and transit routes?

They must develop their own infrastructure (such as roads and utility systems) and often provide employee housing, off-duty recreational facilities, and meeting/banquet space to maintain year-round profitability.

15
New cards

What seven elements surround the central hotel concept in the initial idea stage (FIGURE 4.1)?

Name, Decor/Ambiance, Type of Hotel, Type of Ownership, Location, Room Rate Structure, and Number of Rooms.

16
New cards

In a feasibility study, what details are analyzed in the Market Area section?

Geographic and economic data, including available market and workforce, channels of distribution, and existing attractions.

17
New cards

In a feasibility study, what information is reviewed in the Competition section?

Competitors, including brands in the market, competition's concept, current operations, and future goals.

18
New cards

In a feasibility study, what parameters are evaluated in the Site section?

Geographic and legal aspects: infrastructure, zoning regulations, environmental measures, and title insurance.

19
New cards

In a feasibility study, what information does the Demand section provide?

Target market and demographics: market share, market segmentation trends, and pricing strategies.

20
New cards

In a feasibility study, what does the Facilities and Services section evaluate?

Hotel type and design: layout, construction, efficiency and cost of equipment, and availability and cost of raw materials.

21
New cards

In a feasibility study, what components are included under Financial Estimates?

Economic feasibility: proposed budget, start-up costs, projected revenues, and projected return on investment.

22
New cards

How did hotel investment practices differ between the 1980s and the 1990s?

Constructing new facilities was the preferred investment practice in the 1980s, whereas buying and renovating existing structures became the better option in the 1990s.

23
New cards

What traditional "rule of thumb" was devised by hotel architects to set room rates based on construction costs?

Charging $1\text{\$}1 in room rate for every $1000\text{\$}1000 spent in the construction of the room.

24
New cards

By how much can pre-opening expenses, furnishings, landscaping, and supplies increase actual construction costs?

They may add from 50%50\% to 75%75\% more to the actual construction costs.

25
New cards

What constitutes the most significant ongoing operating expense in hotel operations?

Wages, salaries, and employee benefits.

26
New cards

What two essential needs must a new hotel's design satisfy?

  1. Provide guests with a comfortable, safe environment in which they can enjoy their stay, and 2. Allow hotel staff to keep the hotel operating efficiently to meet guest needs.
27
New cards

What is the primary function of the Front of the House design regarding guest retention?

The lobby architecture grabs initial interest, but the guest room keeps customers coming back.

28
New cards

What are the main design objectives for the Back of the House in a hotel?

Efficiency and control, ensuring smooth operations without revealing workings to guests and allowing staff to enter, exit, and work out of sight.

29
New cards

What four design considerations comprise facility accessibility in hotel design?

Security, independence, safety, and comfort.

30
New cards

What is ambiance in hotel design, and what key element does it incorporate?

Ambiance is the complete impression a lodging facility gives to its guests, incorporating sensory perception (the sights, sounds, and smells of the customer experience).