Cost estimate: analogous

Uses similar past projects; used at initiation; accuracy −25% to +75%

2
New cards

Cost estimate: parametric

Uses a statistical rate such as $/sq ft; used in planning; accuracy −10% to +25%

3
New cards

Cost estimate: bottom-up

Estimate each work package, then roll up; detailed planning; accuracy −5% to +10%

4
New cards

Contingency reserve

Covers known unknowns (identified risks); controlled by the PM; included in the cost baseline

5
New cards

Management reserve

Covers unknown unknowns; controlled by senior management/sponsor; excluded from cost baseline but included in total project budget

6
New cards

Cost aggregation sequence

Work package estimates → control accounts → project estimate → + contingency = cost baseline → + management reserve = total project budget

7
New cards

Funding-limit reconciliation

Rescheduling work so planned spending fits within the tranches in which funds are released

8
New cards

PV (BCWS)

Budget for work scheduled to be done by now ("what should be done?")

9
New cards

EV (BCWP)

Budget for work actually completed ("what was done?")

10
New cards

AC (ACWP)

Actual cost of the work completed

11
New cards

Reading EVM variances and indices

Variances (CV, SV) negative = bad; indices (CPI, SPI) below 1.0 = bad; SV is in dollars, not days

12
New cards

Quality vs. grade

Meeting requirements (low is always a problem) vs. a category of features (low can be fine; a budget hotel can be high on the first)

13
New cards

Prevention costs

Training, quality planning, design reviews; usually the best return

14
New cards

Appraisal costs

Testing, inspections, audits; finds defects but doesn't stop them from occurring

15
New cards

Internal failure costs

Rework and scrap found before delivery

16
New cards

External failure costs

Warranty claims and returns after delivery; the most expensive cost-of-quality category

17
New cards

Plan Quality

Sets standards and metrics; outputs are the management plan for meeting requirements and the measures used to judge it

18
New cards

Manage Quality

Process-focused and proactive; audits how work is done

19
New cards

Control Quality

Product-focused and reactive; inspects deliverables; output feeds Validate Scope

20
New cards

Fishbone (Ishikawa) diagram

Root-cause tool organized by Man, Machine, Method, Material, Measurement, Mother Nature

21
New cards

Quality checklist

Standardizes required steps using lessons learned

22
New cards

Control chart

Plots process data against limits set at ±3σ from the mean

23
New cards

Rule of seven

7+ consecutive points on one side of the mean signal an assignable cause to investigate

24
New cards

Control limits vs. specification limits

Process behavior vs. customer requirements

25
New cards

Pareto chart

Descending bars plus a cumulative % line; shows the vital few causes (80/20)

26
New cards

PDCA

Plan-Do-Check-Act cycle (Deming); the improvement method

27
New cards

Kaizen

"Change for the better"; small daily gains by everyone; the improvement mindset

28
New cards

Verification

Building the product right: internal check against specs

29
New cards

Validation

Building the right product: done with the customer (e.g., UAT)

30
New cards

Acceptance criteria

Measurable conditions agreed on during planning, before work begins