1/59
Looks like no tags are added yet.
Manufacturing an item before it is needed is an example of what form of waste?
overproduction
In lean systems, part commonality serves to increase
repeatability
One of the LEAST effective supplier strategies for lean systems is
a short-term, competitive relationship between the company and the supplier
Line flows are recommended in designing lean system layouts because they eliminate waste by reducing
The frequency of setups
The service department of Monroe Brothers Automotive would like to achieve uniform workstation loads. An effective system for this firm would be
a reservation system
Lean systems can be an integral part of a corporate strategy based on speed as they improve what factors?
cycle times, labor productivity, & inventory turnover
What is a major reason why a traditional labor contract may cripple a company's ability implement lean?
t reduces the company's ability to reassign workers to other tasks as the need arises
(T or F) In manufacturing systems, one way to achieve continuous improvement can be to maintain low inventories, and periodically cut safety stocks almost to zero.
True
The just-in-time (JIT) system is a(n):
integrated system of managing resources, information, and decision processes to eliminate waste.
Regarding the Eight Types of Waste that must be eliminated to implement lean systems, using expensive high precision equipment when a simpler machine would suffice is part of which general waste category?
inappropriate processing
(T or F) Long production runs, poor material flows, and processes that are not tightly linked to one another can cause over 90% of a product's lead time to be spent waiting.
True
Regarding the Eight Types of Waste that must be eliminated to implement lean systems, manufacturing an item before it is needed is part of which general waste category?
overproduction
Continuous improvement with lean systems:
entails systematically stressing the system and focusing on problem areas
(T or F) In the push method of workflow, customer demand activates the production of a good or service.
False
(T or F) Just-in-time (JIT) systems rely on inspectors to inspect quality into the product.
false
(T or F) Five S practices can enable workers to visually see everything differently, prioritize tasks, and achieve a greater degree of focus.
true
Companies using lean systems generally have:
suppliers that are located nearby to decrease delivery lead time
Lean systems maintain inventory in small lot sizes because small lot sizes:
enable schedules to use machine capacities more efficiently
The lean system concept will not work without the proper environment. Which one of the following characteristics is most common to firms that have successfully implemented a lean system?
uniform assembly schedules
Using customer demand to activate production of an item or service is called:
the pull method
Automatically stopping the process when something is wrong and then fixing the problems on the line itself as they occur is known as
Jidoka
Designing shipping boxes to be packed only in a certain way to minimize damage and eliminate all chances of mistakes is an example of
poka-yoke
Combining parts or products with similar characteristics into families and setting machines aside for their production is known as
group technology.
The method that groups products with similar characteristics into families and sets aside groups of machines for their production is called
group technology
Benefits of having a flexible workforce include all of the following:
decreased reliance on inventory buffers, a more uniform work flow, it is easier to relieve bottlenecks
A kanban system is an important mechanism for lean system management. Which one of the following statements regarding the operation of a kanban system is best?
A kanban and a container move as a pair once production begins at the fabrication process.
An important mechanism for lean systems is a kanban system. Which one of the following statements correctly describes the behavior of a two-card kanban system?
Containers must never be removed from the storage location without an authorizing withdrawal kanban.
Which one of the following statements regarding the Toyota production system is best?
faster processing time for the part held by the container
Which of the following is NOT characteristic of a kanban system?
it serves as a push mechanism
Lean Farms operated every process with a lean philosophy. For example once Cletus returned with an empty wheelbarrow, Jake knew it was time to get busy shoveling manure in order to fill it back up. This is an example of
a container system
In the context of lean systems, what best defines the primary role of a Kanban system?
it serves as a visual tool to track inventory levels & trigger replenishment
(T or F) Lean systems require large batch sizes to gain economies of scale.
False
Which of the following is a process consideration in the implementation of a lean system?
firms might have to change existing layouts
Which one of the following is an advantage of lean systems?
Lean systems result in a decrease in safety stock and work-in-process inventory.
Lean systems can be an integral part of a corporate strategy based on speed as they improve which processes?
cycle times, inventory turnover, labor productivity
Lean systems coupled with statistical process control (SPC) requires a high degree of regimentation which in turn can lead to
worker stress
Which of these issues is a problem associated with the conversion to a lean production system?
Workers can feel pushed and stressed since the safety net of inventory has been removed.
Which of the following best characterizes JIT systems?
pull method of materials flow
The ability to automatically detect the occurrence of an abnormality, thereby helping achieve quality at the source, is
Jidok
Which of these terms is NOT one of the Five Ss?
store
The theory of constraints methods increase the firm's profits more effectively by focusing on what?
making materials flow rapidly through the entire system
Of the seven key principles of the theory of constraints, which is the first principal?
the focus should be on balancing flow, not on balancing capacity
If during week 1 the mix of work makes operation 1 a bottleneck, and the next week it may makes operation 3 the bottleneck, the variability in workload has created a
floating bottleneck
Bottlenecks exist in which type of manufacturing processes?
line, job, & batch processes
What is the name of the product mix decision method that produces the products with the highest contribution margins and ignores fixed costs?
the traditional method
The theory of constraints defines inventory as
all the money invested in a system in purchasing things that it intends to sell
An item that has been built to stock has yet to be sold. Which TOC operational measure is used to describe it in its current state?
inventory
what is the management philosophy that identifies the most significant limiting factor that stands in the way of achieving a goal and then systematically improves that constraint until it is no longer the limiting factor.
The theory of constraints
The focus for a process improvement exercise should be on balancing:
flow
Work should be released into the system when:
when the bottlenecks need work
The third step in Theory of Constraints application, "subordinate all other decisions to Step 2," means that the analyst should:
Schedule non-bottle neck processes to support the bottleneck schedule
A workstation in a process is a bottleneck if
it has the highest total timer per unit processed
The theory of constraints principles outlined are applicable to what type of processes?
large service processes, large hospital processes, large manufacturing processes
the total elapsed time from the start to the finish of a job being processed at one or more workcenters.
throughput time
(T or F) A bottleneck process has the lowest capacity and the longest total time from the start to the finish.
true
(T or F) The key to managing bottlenecks is to bypass the bottleneck step in the process.
False
In a drum-buffer-rope system, the lot size that moves from one work center to another for additional processing is a(n):
transfer batch
The process batch at the constraint in a drum-buffer-rope system should be:
of such a size as to improve utilization of the constraint
Which statement about process batches is BEST?
One or more transfer batches may combine at the constrain buffer to form a process batch
In a DBR system, the mechanism that controls the rate at which the bottleneck dictates the throughput of the entire plant is called the
Rope