Project Cost and Schedule Management

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/17

flashcard set

Earn XP

Description and Tags

Flashcards covering cost management planning, cost estimation techniques, project budget components, cost control tools, and project scheduling concepts such as milestones, deliverables, and Gantt charts.

18 Terms

1
New cards

What is a Cost Management Plan?

The official document that defines how project costs will be estimated, budgeted, and controlled throughout the entire project lifecycle.

2
New cards

What are the four pillars of the Cost Management Plan?

Cost Estimation, Cost Baseline, Cost Control, and Reporting/Metrics (such as Earned Value Management).

3
New cards

How does the Bottom-Up Estimation method calculate project costs?

It breaks down each task into its smallest individual components (labor, materials, and equipment) from the ground up and multiplies unit rates by duration or quantity to arrive at a precise total.

4
New cards

How is the overall project budget built?

By aggregating the cost estimates of individual Work Packages (from the WBS) and adding reserves for identified risks.

5
New cards

What are the four main cost categories considered when determining the project budget?

Labor, Materials, Equipment, and Overheads (indirect administrative expenses).

6
New cards

What is the Contingency Reserve and what percentage of the budget does it typically represent?

It typically represents 5–10%5\text{–}10\% of the budget and is specifically set aside to cover known, anticipated risks documented during risk planning (like minor delays or expected price fluctuations).

7
New cards

What are the two primary components that make up the total Project Budget?

The Cost Baseline (the approved budget for planned work) plus the Management Reserve (a buffer for unforeseen events).

8
New cards

What is the Cost Baseline?

The approved, time-phased budget used as a benchmark to measure actual financial performance.

9
New cards

What is the Management Reserve, and who controls it?

A 5–10%5\text{–}10\% financial cushion for unforeseen risks outside the project's defined scope that is controlled by upper management.

10
New cards

What are Control Accounts in project budgeting?

Management checkpoints where scope, budget, and actual costs are integrated and compared against the baseline.

11
New cards

What is the core purpose of the Control Project Costs process?

It is the ongoing process of monitoring financial performance to detect and address budget deviations promptly.

12
New cards

Which specific tools and techniques are highlighted for controlling project costs?

Earned Value Management (EVM), forecasting, and the To-Complete Performance Index (TCPI).

13
New cards

What key outputs are produced when controlling project costs?

Updated cost forecasts and formal change requests whenever corrective action is needed.

14
New cards

What is a Project Schedule and what are its key components?

A detailed roadmap outlining project tasks, their sequence, start and end dates, and needed resources. Its key components include Tasks/Activities (from the WBS), Dependencies, Duration, Milestones, and Deadlines.

15
New cards

What is a Project Milestone and what is its duration?

A significant event or point in time marking the completion of a major phase or key achievement. Under theoretical rules, milestones have zero duration—they are simply specific dates.

16
New cards

What is the difference between a project deliverable and a milestone?

A deliverable is the actual tangible or intangible work output produced and delivered to a stakeholder (such as a prototype, report, or software release), whereas a milestone is the moment that deliverable is completed and approved.

17
New cards

What general workflow is followed to create a project schedule?

Developing the WBS to identify and sequence activities, estimating task durations, assigning resources, determining milestones, building the visual timeline (Gantt Chart), and entering the monitoring and control phase.

18
New cards

In a Gantt Chart, what do the horizontal axis, bars, arrows, and diamonds represent?

The horizontal axis represents the timeline; the position and length of the bars show when each task begins, how long it takes, and when it ends; arrows indicate task dependencies; and diamonds mark key milestones.