Huawei "Full Lifecycle + Full Stack" 6 Service Phases
Planning, Construction, O&M, Optimization, Operations, and Training
2
New cards
AICC Top-Layer Key Metrics (Module 1)
Finance/Gov focus, omni-channel video, 100% GCH, and outbound call marketing
3
New cards
Mobile Money Key Metrics
Finance focus, 99.999% reliability, cloud-based OC deployment, and merchant registration within 1 week
4
New cards
iDOP Platform (Industry Business Operations Support)
China-focused platform with 12 service suites and 40% efficiency improvement via RPA
5
New cards
Service Experience 4D Exploration: Network
B.E.S.T Network (50–80 m horizontal positioning, 30% higher than average)
6
New cards
Service Experience 4D Exploration: Data
DataCube Lite (minimum 3 nodes, IT/OT/CT integration)
7
New cards
Service Experience 4D Exploration: Video
Video Cube (10+ protocols, 70+ open APIs, millions of terminals)
8
New cards
Service Experience 4D Exploration: Sensing
Yuantu / Metaworks (zero-code orchestration, 200+ digital twin components)
9
New cards
ICT Deployment & Integration 4 Highlights
Many (300+ migration scenarios), Fast (1.5 yrs to 4 months), Stable (zero-loss migration), Energy Saving (PUE reduced 8%–20%, down to 1.15)
10
New cards
Specialist Certifications: HCSA vs HCSP vs HCSE
HCSA = whole network design & CXO dialogue, HCSP = technical communication & solution design, HCSE = bidding requirements & configuration quotation
11
New cards
Huawei ICT Service System Scale
11 GSCs/TACs (170 countries), 48 tool types, 3,000+ experts, 10,000+ self-owned resources, 6,200 partners, 78,000 certified engineers
12
New cards
Customer Support 3 Service Portfolios
1) Equipment (Hi-Care, Co-Care, Warranty card), 2) Software (Software SnS), 3) Special Assurance (Defective Part Retention, Health Check)
13
New cards
Defective Part Retention Service
Special assurance allowing customers to keep faulty HDDs/SSDs for data security
14
New cards
Hi-Care vs Hi-Care Onsite Differences
Hi-Care Onsite adds onsite hardware replacement by an engineer and Intelligent Fault Reporting (24/7 storage monitoring, Premier level only)
15
New cards
WeiKnow
Huawei's online Q&A robot included in Hi-Care self-service support
16
New cards
Co-Care Service Model
Partner-branded service combining Huawei basic L3/spare parts/Service Care/Call Home with Certified Partner L1/L2 and onsite delivery
17
New cards
Software SnS
Perpetual software license plus yearly subscription/support (24/7 TAC, online support, software updates & upgrades)
18
New cards
Warranty Card Activation
Used for distribution products (Intelligent Collaboration, Datacom, Storage) via self-service on Huawei website with card password + SN for same-day availability
19
New cards
SCT Quotation Rule for Devices > 5 Years
Devices in service over 5 years from first maintenance start time must renew via the Maintenance Renewal portal, not the standard configurator
20
New cards
Day 2 O&M Pyramid & Platforms
1 Business Foundation (Customer Support) + 3 Growth Drivers (Smart NOS, Industry O&M, Business Operations Support) using eCare, STC, IMOC, IOCC
21
New cards
Onsite Service vs Smart NOS: Alarm Monitoring
Provided in Onsite Service, NOT provided in Smart NOS
22
New cards
Onsite Service vs Smart NOS: Network Inspection
Common single-NE check in Onsite vs 4-layer 12-dimensional in-depth health evaluation in Smart NOS
23
New cards
Onsite Service vs Smart NOS: Staffing & Revenue Recognition
Onsite uses ASP mid/senior (straight-line monthly) while Smart NOS uses ASP senior/Huawei HCIE experts (straight-line OR PAC by times)
24
New cards
Smart NOS Risk Prevention: 3 Libraries & 2 Baselines
Libraries = Known industry issues, Software version defects, Security vulnerabilities. Baselines = Config compliance, Health
25
New cards
Software Milestones: EOM vs EOFS vs EOS vs EOES
EOM = no new orders (spares OK), EOFS = last patch dev date, EOS = no tech support, EOES = extended service (excludes non-mainstream versions)
26
New cards
Smart NOS 3 Patch Types
Main (annual plan after FOA), Routine (patch train, no workarounds), Emergency (urgent major risks or Level-1/2 security vulnerabilities)
27
New cards
Hardware EOX Bathtub Curve & Board Life
Beta < 1 early failure, Beta = 1 random, Beta > 1 wear-out. Recommended board life is 10 years, fault rate spikes after 8–9 years
28
New cards
Smart NOS In-Depth Health Evaluation Tools
Datacom = 4 layers, 12 types (eDesk Pro + STM). Storage = Flash (3D) & Scale-out (4D, 110 basic + 80 in-depth checks via DeviceManager, SmartKit, eService)
29
New cards
Smart NOS Exclusive Problem Support (VIP TAC) SLA
Response = 5 min (P1) / 15 min (P2). Recovery/workaround = 2 hours (P1) / 4 hours (P2)
30
New cards
Smart NOS VIP TAC 4 Accelerations
1) Auth exemption (trustlist), 2) Dedicated CSE (HCIP preferred), 3) Dedicated PSE (HCIE preferred), 4) P1/P2 transparent transmission
31
New cards
TRUST DC Evaluation
5-dimensional Data Center evaluation covering 20+ brands, 150+ models, and 300+ indicators
32
New cards
Storage Capacity & Performance Evaluation
Checks >100 indicators, predicts capacity for next 6 months, and improves KPIs by 20%
33
New cards
Effective Capacity Guarantee
Huawei supplements storage capacity if actual effective capacity falls below the committed value
34
New cards
FlashEver Service
Online controller upgrade for Dorado V6 with zero data migration and zero service interruption
35
New cards
SSD Lifetime Assurance
Warns and replaces expired SSDs without temporary budget requests (standard maintenance disclaimers do NOT cover SSDs at end of lifespan)
36
New cards
Smart NOS Major Change Rules
Over 90% of accidents come from change failures, so Smart NOS enforces 3 authorizations & 3 approvals (optional Demo Cloud verification)
37
New cards
Smart NOS SCT Quotation Rules
Smart NOS entry = Financial industry & China Region only. Subscription IP optimization = Outside China only. Liquid cooling = tied to onsite computing staff & duration
38
New cards
AUTIN Partner Collaboration Split
Enterprises need E2E Assurance + Provision: AUTIN excels in Assurance, while Partners excel in Provision
39
New cards
AUTIN Value Metrics & Scale
90% alarm compression, 80% fault coverage, 90% diagnosis accuracy. Flink-powered for 1M NEs, 2M active alarms, 2,000/sec, 10M daily, 0 alarm loss
40
New cards
AUTIN Core Module & Mobile App
DIM = core module (unified topology, resources, data collection). Mateline = mobile app for GIS monitoring & work orders
41
New cards
AUTIN Indicator Analysis & OWS Interaction
4 processes (TT/CR/PDT/WO), 3 matrices, 21 SLAs, 80 KPIs. Orchestration design center interacts with OWS mainly through training data
42
New cards
IP Network New Build 5 Phases
Requirement Analysis -> Target Network Design (8D) -> Design Verification (IPCrystal + OpenLab) -> Deployment (STM) -> Acceptance Testing
43
New cards
IP Network SCT Color Rule
Black = NE quantities auto-retrieved from same BOQ. Red = manually entered quantities. Verification defaults to Unneeded
44
New cards
Datacom Powered Implementation: Collaborative Design (LLD, Remote)
Complete LLD in 10 workdays -> review in 5 workdays -> revised draft in 7 workdays -> final LLD in 7 workdays after feedback
45
New cards
Datacom Powered Implementation: Collaborative Review (LLD, Remote)
Start review within 10 workdays, max 2 remote meetings in 2 consecutive weeks (<= 2 hours each)
46
New cards
Datacom Powered Implementation: Collaborative Assurance (Onsite)
Huawei guides partner engineers in hardware installation & software commissioning (Huawei does NOT directly install/commission)
47
New cards
Datacom Powered Implementation Restrictions
Outside China only, excludes Class-A and 3rd-party products, 1 calendar year validity, suggested for < 300 NEs (or 10 OLT). Packages: 3/5 HW or 3/5/10 SW man-days
48
New cards
Optical Domain Planning & Pre-Installation
Uses NetStar Plan (99.999% reliability). Factory pre-installation lowers fiber error rate to 0.01% and cuts onsite deployment from 2 days to 0.5 days
49
New cards
Optical Automatic Commissioning & Features
ODT App (single-site + photo acceptance) + iMaster NCE (auto optical power). Features: FD (Fiber Doctor) & OD (Optical Doctor) cut provisioning by 10x
50
New cards
Optical SCT Quotation Rules
Information Collection & Analysis and Network Planning & Design are mandatory in Design Service. 1H/24H Bit Error Test meter fees are evaluated separately
51
New cards
Data Storage P&D&I Outside China & 18000 Rule
Outside China P&D&I includes hardware installation (optional toggle). OceanStor 18000 Series bundles HW install + P&D&I
52
New cards
Solid-State / Converged Storage P&D&I Exclusions
Does NOT include DR or migration features (SmartVirtualization, HyperMetro, SmartMigration, HyperReplication, HyperVault)
53
New cards
Carefree Configuration Rule
Piloted only in centralized storage (new deployment) for enterprise customers, allowing onsite adjustments within 30 calendar days after acceptance
54
New cards
FusionCube 1000 H&D Quotation Rules
FusionStorage & virtualization preinstalled. Excludes VMware, Oracle, VDI, DR. Must quote per site (do not sum nodes across sites)
55
New cards
Storage SCT Auto-Retrieval vs Manual Entry
Auto-retrieval works for Dorado, Converged, FusionCube, IVS3800. NOT ready for Distributed Storage (Pacific) and DCS Virtualization (set manually)
56
New cards
IT Collaborative Support (Powered Service)
Outside China only, covers 741 Class-B/C/D single products, and excludes DME, distributed products, DCS, and Class-A
57
New cards
IT Migration Service Rules
Uses MigrationDirector (3–10x efficiency, 4 phases, 17 steps). Zero interruptions for SAN, short interruption for NAS. V2V migrates 3rd-party virtualization only
58
New cards
IT DR Service Rules
Uses iDRP, BCmanager, DME, OpenLab. Intra-city <= 100 km, Remote > 100 km (RPO=0, RTO ≈ 0). FusionCube Backup covers eBackup only, DCS DR quoted by vCPUs
59
New cards
Storage Operations Support Quotation
Uses CloudOps + DME + MigrationDirector + onsite experts (5x efficiency, 7+ days shorter rollout) and is quoted as Data Management Supporting Operation Service
60
New cards
IT Infrastructure Assessment Conversion Rules
Evaluates 11 dimensions. 1 PM = 1 host, 5 VMs = 1 host, 1 big data/backup/DB instance = 1 host. 1 storage/gateway/FC switch = 1 unit
61
New cards
HALP Tiers: Certified vs Preferred vs Advanced
Certified = >=1 instructor/region/classroom. Preferred = CNY1M/$150k, >=1 HCIE/HCSE, >=60% renewal. Advanced = >=2 HCIE/HCSE, >=10 regions, Huawei invitation
62
New cards
Training Sales Strategy & Class Size
Public = Talent Store/HALPs, VNAs & SMEs = HALPs, Premier/Strategic/Core NAs = SCT. Quote by class allows max 16 trainees
63
New cards
Online Courses & Exam Voucher Rules
Online courses valid 1 yr from first login (discounts: 1–5=100%, 6–20=80%, >=21=50%). Vouchers valid 1 yr from generation (Digital=transferable, Secret code=non-transferable)
64
New cards
Written Exam Rules (Pearson VUE)
Requires 2 valid original IDs. Failed retake = 7 days, passed retake = 30 days. Cancel >= 24 hours prior. Cert valid 3 years (HCIE written valid 18 months)
65
New cards
HCIE Lab Exam Rules
Schedule >= 7 natural days ahead, seats released quarterly on 1st day (12:30–13:00). Retake & free cancel = 15 natural days. 3 cancels/month = 30-day lock
66
New cards
AICC 4 Pillars & Multi-Tenancy
Omni-Channel, All-in-One (enterprise CC setup in 10 mins), Intelligent (+AI), and Openness. O&M delivers 8 CV and 4 BV per year
67
New cards
AICC AI & Openness Metrics
Smart Interaction (+50% self-service), Smart Decision (+30% routing), Agent Assistant (-20% duration), 100% QA. ISA Tool: 400+ monitor, 600+ report, 80+ APIs
68
New cards
eIBMS Auto-Distribution Rules
Huawei SSR = Direct and Premier/Strategic/Core NA, Partner = Valued NA, Huawei TAC = Commercial
69
New cards
eIBMS Tab 1 (Installed Base View) Rules
Query By Contract (max 100 contracts, SN disabled) or By SN. Partners can only transfer IB within the same sales path (not if in a renewal ticket). Only SSR transfers across paths
70
New cards
eIBMS Tab 2 (IB Data Matching) Limits & Scenarios
Quickly Import SN = max 1,000 SNs, Template = >1,000 SNs. Scenario 1.1 (Myself) is mandatory, 2.2 (Same Root) is unchecked by default
71
New cards
eIBMS Associate Replace SN & Collection Tools
Status N = Original (replaced), Status Y = New (replacement). Tools: Datacom = eDesk Pro, Optical = ON-Toolkit, Storage = SmartKit (11 fields in .xlsx/.xml)
72
New cards
eIBMS Matching FAQ Codes
4.2 = Not in auth database, 4.0 = Not Matched Quote SN (but Quote Item), 4.1 = Not Matched Quote SN
73
New cards
eIBMS Tab 3 (Service Renewal) Rules
Qualify only when Party = partner & Status = Not Start/Expansion Cancel. One-Click BOQ syncs eIBMS -> SCT. Cross-company transfer only if Qualified & same sales path
74
New cards
eIBMS Dashboard 1.0 & API
Shows AR (Attach Rate) and CYRR (Current Year Renewal Rate). RR was removed because CYRR excludes multi-year contracts. API = partner.huawei.com/openapi/ (POST)