1/129
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Which of the following is an example of MRO inventory?
Finished goods in a warehouse
Raw materials used in production
Spare parts for manufacturing equipment
Work-in-process items
Spare parts for manufacturing equipment
Which type of inventory is in transit between a manufacturing plant and a distribution center?
Safety stock
Transportation inventory
Cycle stock
Finished goods inventory
Transportation inventory
A toy manufacturer produces and stores toys throughout the year to meet the high demand during the holiday season. What type of inventory does this represent?
Anticipation inventory
Work-in-process inventory
Speculative inventory
Safety stock
Anticipation inventory
What is the primary purpose of safety stock?
To take advantage of bulk discounts
To cover unexpected demand variations
To prepare for plant shutdowns
To reduce inventory investment
To cover unexpected demand variations
A company buys extra raw materials because it anticipates a supplier strike next month. This is an example of:
Cycle stock
Fluctuation inventory
Speculative inventory
MRO inventory
Speculative inventory
What is a key benefit of using cycle counting instead of annual physical inventories?
It reduces the need for safety stock
It reduces operational downtime
It eliminates the need for inventory records
It eliminates the need for suppliers
It reduces operational downtime
A company discovers that several components needed for production are missing from inventory, causing a delay in manufacturing. Which inventory management problem is this an example of?
Overstocking
Excess safety stock
Efficient operations
Poor record accuracy
Lowering the total capital tied up in inventory
A manufacturer works with a supplier who manages inventory levels at the manufacturing plant and automatically replenishes parts when needed. This approach is known as:
Vendor-managed inventory (VMI)
Cycle counting
Anticipation inventory
Safety stock management
Vendor-managed inventory (VMI)
Which two factors contribute to inaccurate inventory records? (Choose Two)
Unauthorized withdrawals
Routine cycle counting
Unsecured stockrooms
Vendor-managed inventory
Unauthorized withdrawals
Unsecured stockrooms
Which two metrics are commonly used to measure inventory performance? (Choose Two)
Employee turnover
Weeks of supply
Inventory turnover
Product defect rate
Weeks of supply
Inventory turnover
Which two objectives are key to inventory management? (Choose Two)
Maximizing inventory levels to prevent stockouts
Providing the desired level of customer service
Keeping safety stock levels equal to demand
Ensuring cost-efficient operations
Providing the desired level of customer service
Ensuring cost-efficient operations
What is a key advantage of using cycle counting instead of periodic counting?
It eliminates the need for inventory records
It reduces the need to shut down operations
It allows companies to hold more safety stock
It only counts inventory once a year
It reduces the need to shut down operations
Which two challenges are associated with periodic counting? (Choose Two)
It often requires stopping production to complete the count
It uses real-time inventory tracking systems
It is typically performed by employees who may not be trained in inventory management
It improves record accuracy after every transaction
It often requires stopping production to complete the count
It is typically performed by employees who may not be trained in inventory management
Raw materials
Purchased items or extracted materials transformed into components or products.
Components
Parts or subassemblies used in the final product.
Work-in-process (WIP)
Items in process throughout the plant.
Finished goods
Products sold to customers.
Distribution inventory
Finished goods in the distribution system.
Anticipation inventory
Inventory built in anticipation of future demand.
Fluctuation inventory
Provides a cushion against unexpected demand.
Lot-size inventory
A result of the quantity ordered or produced.
Transportation inventory
Inventory in movement between locations.
Speculative inventory
Used to protect against some future event.
Maintenance, repair, and operating (MRO) inventory
Items used in support of manufacturing and maintenance.
Percentage of orders shipped on schedule
A customer service measure appropriate for use when orders have similar value.
Percentage of line items shipped on schedule
A customer service measure appropriate when customer orders vary in number of line items ordered.
Percentage of dollar volume shipped on schedule
A customer service measure appropriate when customer orders vary in value.
Setup cost
Costs such as scrap costs, calibration costs, and downtime costs associated with preparing the equipment for the next product being produced.
Inventory turnover
A measure of inventory policy effectiveness.
Weeks of supply
A measure of inventory policy effectiveness.
Item cost
Includes price paid for the item plus other direct costs associated with the purchase.
Holding costs
Include the variable expenses incurred by the plant related to the volume of inventory held.
Capital costs
The higher of either the cost of the capital or the opportunity cost for the company.
Storage costs
Include the variable expenses for space, workers, and equipment related to the volume of inventory held.
Risk costs
Include obsolescence, damage or deterioration, theft, insurance, and taxes associated with the volume of inventory held.
Ordering costs
The fixed costs associated with either placing an order with a supplier or setup costs incurred for in-house production.
Shortage costs
Incurred when demand exceeds supply.
Back order
Delaying delivery to the customer until the item becomes available
Lost sale
Occurs when the customer is not willing to wait for delivery.
Continuous review system
Updates inventory balances after each inventory transaction
Periodic review system
Requires regular periodic reviews of the on-hand quantity to determine the size of the replenishment order.
Two-bin system
One bin with enough stock to satisfy demand during replenishment time is kept in the storeroom; the other bin is placed on the manufacturing floor.
Lead time
Time from order placement to order receipt.
Periodic counting
A physical inventory is taken periodically, usually annually.
Cycle counting
Prespecified items are counted daily.
What is the primary purpose of aggregate planning?
To reduce product prices
To develop production rates and resource requirements for the medium-term
To schedule individual jobs
To evaluate employee performance
To develop production rates and resource requirements for the medium-term
Which type of aggregate plan maintains a constant workforce and produces the same amount each period?
Chase plan
Hybrid plan
Level plan
Reactive plan
Level plan
Which two functional areas contribute directly to the aggregate planning process?
Marketing
Legal
Customer Service
Engineering
Marketing
Engineering
Which two options are considered demand-based options in aggregate planning?
Using inventories
Hiring and firing employees
Offering discounts to shift demand
Using overtime and undertime
Using inventories
Offering discounts to shift demand
Which type of aggregate plan adjusts the workforce or output capacity each period to match demand exactly?
Chase plan
Level plan
Hybrid plan
Static plan
Chase plan
Which two capacity-based options can be used in aggregate planning?
Subcontracting
Using back orders
Hiring and firing workers
Changing customer preferences
Subcontracting
Hiring and firing workers
What is the first step in developing an aggregate plan?
Identify the aggregate plan that matches company objectives
Evaluate the plan’s cost
Calculate workforce size
Conduct a feasibility study
Identify the aggregate plan that matches company objectives
Which of the following measures customer service levels in an aggregate plan?
Number of back orders
Number of employees hired
Machine utilization
Production cost per unit
Number of back orders
When evaluating the current situation for aggregate planning, which two factors should be considered?
Point of departure
Advertising expenditures
Magnitude of change
Total number of product lines
Point of departure
Magnitude of change
What type of plan is most suitable for make-to-order products with fluctuating demand?
Level plan
Chase plan
Hybrid plan
Fixed plan
Chase plan
Which aggregate plan strategy combines options like inventory, workforce adjustments, and subcontracting?
Chase plan
Level plan
Hybrid plan
Static plan
Hybrid plan
Which two performance factors are evaluated when testing an aggregate plan?
Stability of workforce
Marketing campaign success
Employee satisfaction scores
Total cost
Stability of workforce
Total cost
Which capacity-based option involves letting another company produce part of the workload?
Subcontracting
Back ordering
Overtime
Demand shifting
Subcontracting
Which type of aggregate plan option tries to smooth demand by offering incentives like off-season discounts?
Reactive option
Back ordering option
Proactive option
Inventory option
Proactive option
Which two factors should a company evaluate to determine the best options for an aggregate plan?
Duration of required changes
Employee turnover rates
Number of suppliers
Expected demand variation
Duration of required changes
Expected demand variation
What is the primary way aggregate planning supports the marketing plan?
By scheduling daily advertising campaigns
By ensuring production capacity meets forecasted sales demand
By setting product pricing and promotional budgets
By selecting new target markets
By ensuring production capacity meets forecasted sales demand
Which two ways do marketing and aggregate planning interact in the business planning process?
Aggregate planning ensures enough resources are available to meet marketing’s demand forecasts
Marketing adjusts pricing to match the production schedule
Marketing provides sales forecasts that drive aggregate production planning
Aggregate planning decides which advertising channels to use
Aggregate planning ensures enough resources are available to meet marketing’s demand forecasts
Marketing provides sales forecasts that drive aggregate production planning
Strategic business plan
A statement of long-range strategy and revenue, cost, and profit objectives.
Sales and operations planning
The process that brings together all the functional business plans (marketing, operations, engineering, and finance) into one integrated plan.
Marketing plan
Identifies the markets to be served, desired levels of customer service, product competitive advantage, profit margins, and the market share needed to achieve the objectives of the strategic business plan.
Aggregate plan
Includes the budgeted levels of finished products, inventory, backlogs, workforce size, and aggregate production rate needed to support the marketing plan.
Financial plan
Identifies the sources and uses of funds; projects cash flows, profits, return on investment; and provides budgets in support of the strategic business plan.
Engineering plan
Identifies new products or modifications to existing products that are needed to support the marketing plan.
Master production schedule
The anticipated production schedule for the company expressed in specific configurations, quantities, and dates.
Demand-based options
A group of options that respond to demand fluctuations through the use of inventory or back orders, or by shifting the demand pattern.
Capacity-based options
A group of options that allow the firm to change its current operating capacity.
Finished goods inventory
Products available for shipment to the customer.
Back orders
Unfilled customer orders.
Shifting demand
A marketing strategy that attempts to shift demand from peak periods to nonpeak periods to smooth out the demand pattern.
Overtime
Work beyond normal established operation hours that usually requires a premium be paid to the workers.
Undertime
A condition occurring when there are more people on the payroll than are needed to produce the planned output.
Subcontracting
Sending production work outside to another manufacturer or service provider
Hiring and firing
Long-term option for increasing or decreasing capacity.
Point of departure
The percentage of normal capacity the company is currently using.
Magnitude of the change
The relative size of the change needed.
Duration of the change
The expected length of time the different capacity level is needed.
Level aggregate plan
A planning approach that produces the same quantity each time period. Inventory and back orders are used to absorb demand fluctuations. A level aggregate plan maintains a constant workforce and produces the same amount of product in each time period of the plan.
Chase aggregate plan
produces exactly what is needed to satisfy demand during each period. The production rate changes in response to demand fluctuations. Whereas the level aggregate plan sets capacity to accommodate average demand, the chase aggregate plan sets labor and equipment capacity to satisfy demand each period.
Hybrid aggregate plan
A planning approach that uses a combination of level and chase approaches while developing the aggregate plan.
Enterprise resource planning (ERP)
Large, sophisticated software systems used for identifying and planning the enterprise-wide resources needed to coordinate all activities involved in producing and delivering products.
SCM software
Designed to improve decision making in the supply chain.
Closed-loop MRP
An MRP system that includes production planning, master production scheduling, and capacity requirements planning.
Manufacturing resource planning (MRP II)
A method for the effective planning and integration of all internal resources.
Material requirements planning (MRP)
A system that uses the MPS, inventory record data, and BOM to calculate material requirements.
Backward scheduling
Starts with the due date for an order and works backward to determine the start date for each activity.
Capacity requirements planning (CRP)
Determines the labor and machine resources needed to fill the open and planned orders generated by the MRP. CRP enables a company to evaluate both the feasibility of the MRP system and how well the company is using its critical work centers.
Bill of material (BOM)
Lists all the subassemblies, component parts, and raw materials that go into an end item and shows the usage quantity of each required.
Independent demand
The demand for an item is unrelated to the demand for other items.
Dependent demand
The demand for component parts is based on the number of end items being produced.
Time-phased
Expressing future demand, supply, and inventories by time period.
Open shop orders
Released manufacturing orders.
Project
Endeavor with a specific objective, multiple activities, and defined precedence relationships, to be completed in a specified time period.
Concept
Identify the need for the project.
Feasibility analysis or study
Evaluate costs, benefits, and risks.
Planning
Decide who does what, how long it should take, and what you need to do it.