COSC 275 - WOD EXAM 1

0.0(0)
Studied by 12 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/39

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:11 AM on 10/5/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

40 Terms

1
New cards

estimating

The process of determining the anticipated cost of materials, labor, and

equipment of a proposed project.

2
New cards

take-off

The process in which detailed lists are compiled, based on drawings and

specifications, of all the material and equipment necessary to construct a

project. The cost estimator uses this list to calculate how much it will cost to

build the project.

3
New cards

quantities

Measured amounts of construction items expressed in their customary

units.

4
New cards

quantification

In estimating an activity to translate project scope information into resource

quantities suitable for costing. In the engineering and construction industry,

a takeoff is a specific type of quantification that is a measurement and

listing of quantities of materials from drawings.

5
New cards

quantity survey

A detailed analysis of material and equipment required to construct a

project.

6
New cards

area

A measurement of a given planar region or of the surface of a solid6

7
New cards

area method

A construction cost estimating system employing unit square foot costs multiplied by the adjusted gross floor area of a building.

8
New cards

length

The longest dimension of an object

9
New cards

linear measurement

A unit or system of units for measuring length: 12" = 1', 3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.

10
New cards

dimension

A distance between two points, lines, or planes.

11
New cards

specifications or specs

Documents that define the qualitative requirements for products, materials, and workmanship upon which the contract for construction is based.

12
New cards

drawings

Graphic illustrations depicting the dimensions, design, and location of a project. Generally including plans, elevations, details, diagrams, schedules, and sections

13
New cards

addendum

A document describing an addition, change, correction, or modification to contract documents. An addendum is issued by the design professional during the bidding period or prior to the award of contract, and is the primary method of informing bidders of modifications to the work during the bidding process. Addenda become part of the contract documents.

14
New cards

amendment

A modification of the contract by a subsequent agreement. This does not change the entire existing contract but does alter the terms of the affected provisions or requirements

15
New cards

grade

The surface or level of the ground.

16
New cards

level

A term used to describe any horizontal surface that has all points at the same elevation and thus does not tilt or slope.

17
New cards

site

The location of a project geographically, usually defined by legal boundaries.

18
New cards

elevation

A vertical distance relative to a reference point.

19
New cards

cut and fill

An operation commonly used in road building and other rock and earthmoving operations in which the material excavated and removed from one location is used as fill material at another location.

20
New cards

fill

The soil or other material used to raise the grade of a site area.

21
New cards

foundation

The entire masonry substructure below the first floor or frame of a building, including the footing upon which the building rests.

22
New cards

grade beam

A horizontal end-supported (as opposed to ground-supported) load-bearing foundation member that supports an exterior wall of a superstructure.

23
New cards

width

the measurement or extent of something from side to side

24
New cards

footing

That portion of the foundation of a structure that spreads and transmits the load directly to the soil.

25
New cards

reinforced concrete

Concrete containing adequate reinforcement, prestressed or not prestressed, and designed on the assumption that the two materials (steel and concrete) act together in resisting forces

26
New cards

reinforcing bar

A steel bar, usually with manufactured deformations, used in concrete and masonry construction to provide additional strength.

27
New cards

footing beam

A reinforced concrete beam connecting pile caps or spread footings to distribute horizontal loads caused by eccentric loading.

28
New cards

bolster

In concrete, an individual or continuous support used to hold reinforcing bars in position. Usually used in slab work.

29
New cards

pan constructiion

A type of concrete floor or roof in which pan forms are used to create intersecting ribs and resulting in a waffle-like undersurface.

30
New cards

formwork

The total system of support for freshly placed concrete, including the mold or sheathing that contacts the concrete, as well as all supporting members, hardware, and necessary bracing.

31
New cards

PVR - Potential Vertical Rise

Potential Vertical Rise, expressed in inches (mm) is the latent or potential ability of a soil material to swell, at a given density, moisture, and loading condition, when exposed to capillary or surface water, and thereby increase the elevation of its upper surface, along with anything resting on it.

32
New cards

Liquid Limit

the moisture content expressed as a percentage of the weight of oven dried soil, at which soil changes from a plastic to a liquid state.

33
New cards

Plasticity Index

The plasticity index is a range of moisture in which a soil remains in a plastic state, while passing from a semisolid state to a liquid state.

34
New cards

Overburden

the soil above the layer or layers being investigated

35
New cards

Layer

Layer is a horizontal soil structure of uniform or nearly uniform material. When the material changes due to moisture, density, or compositioon, a new layer is considered to have been created.

36
New cards

Loading

Loading is the load (vertical pressure) per unit area in a lb/ft 2 (kPa) from both the structure and overburden of each layer of soil involved.

37
New cards

compaction tests

Tests employed to determine the density of a soil.

38
New cards

percolation

The movement of a fluid through a soil.

39
New cards

select material

Excavated pervious soil suitable for use as a foundation for a granular base course of a road, or for bedding around pipes

40
New cards

expansive soil

Soil that expands when water is added and shrinks when it dries out. This change in soil volume can cause shifting and cracking in structures.