CH25 Facility Design, Layout, and Organization pt 1

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/41

encourage image

There's no tags or description

Looks like no tags are added yet.

42 Terms

1
New cards

the first step in planning and designing a new facility is

forming a committee of professionals

2
New cards

what are 4 phases of designing a new strength and conditioning facility in order

predesign, design, construction, preoperation

3
New cards

what occurs in the predesign phase

needs analysis, feasibility study, master plan, hire architect

4
New cards

what happens during a needs analysis

why it is needed, number of athletes, goals, hours

5
New cards

what happens during a feasibility study

budget, how much money you have

6
New cards

who might be included in a design committee

contractors, architects, executives, pts, ots

7
New cards

what happens during the design phase

finalize committee, create blueprint

8
New cards

what happens during the construction phase

follow master plan, arrange equipment, check construction progress, access legal counsel

9
New cards

what happens during the preoperation phase

hire staff, create cleaning schedule, assign duties, create plan for operation

10
New cards

what should a strength and conditioning professional assess when modifying an existing facility

existing equipment and its condition, needs of athletes and teams, repairs, replacements, or upgrades

11
New cards

what is one challenge when taking over an existing strength and conditioning facility

you may inherit another coach’s set up, equipment, and problems

12
New cards

what is the first step to modifying an existing strength and conditioning facility

form a committee, feasibility study, needs analysis

13
New cards

what is the second step to modifying an existing strength and conditioning facility

create operational plan, remodel and/or upgrade, finalize design and decorations

14
New cards

what is the third step to modifying an existing strength and conditioning facility

arragne equipment, create employee duties and schedule, hire/keep staff

15
New cards
16
New cards

where should the location of the facility be

ground floor away from offices and classrooms

17
New cards

supervision in a facility should be located in

clear line of sight with mirrors providing the opportunity to look out and see everyone

18
New cards

in your facility there should be a ramp or wheelchair lift for any change of height exceeding

0.5 inches (1.3 cm)

19
New cards

a ramp should run

12 in for every 1 in rise (30.5 cm run for every 2.5 cm rise)

20
New cards

steps should have a ____ on the edge to prevent people from falling

rough strip

21
New cards

the ceiling height should be high enough for

jumping or explosive activities

22
New cards

the recommended height of a ceiling is

12 to 14 ft (3.66 m to 4.27 m)

23
New cards

what are the most common floor option

rubber flooring and antifungal carpet, indoor turf

24
New cards

weightlifting platforms should be made of

wood to prevent slipping

25
New cards

what is the minimum recommended amount of floor space for an athlete within a strength and conditioning facility

100 sq ft (9.3m²)

26
New cards

the facility’s lighting should include

artificial and natural, 50 to 100 lumens

27
New cards

what should be the temp of a facility

67-78 degrees

28
New cards

the relative humidity should not exceed

60%

29
New cards

mirrors need to be placed at least ___ from any equipment

6 in (15 cm)

30
New cards

mirrors should be a minimum of ___ above the floor

20 in (50 cm)

31
New cards

drinking fountains should be located away from

training area

32
New cards

having a shower somewhere in the building helps to

prevent the spread of infections and disease

33
New cards

equipment should be grouped in

sections

34
New cards

cardio machines should be

in their own section organized into groups

35
New cards

barbells and dumbbells should have a minimum of ___ between them

36 inches (91 cm)

36
New cards

what are top priorities when placing equipment

safety and function

37
New cards

the area should have at least ____ of open space to perform a dynamic warm up

49 square feet (4.6 m²)

38
New cards

in the circuit area machines should be placed at least ____ and ___ apart

24 inches (60 cm), 36 inches (90 cm)

39
New cards

walkways in the circuit area should be between

4 and 7 feet (1.2-2.1 m) wide

40
New cards

racks and dumbbells should be lined up along the

wall

41
New cards

there should be at least ___ between ends of racked bars

36 in (90 cm)

42
New cards

kettlebells can be

under dumbbell rack and have a large area