the first step in planning and designing a new facility is
forming a committee of professionals
what are 4 phases of designing a new strength and conditioning facility in order
predesign, design, construction, preoperation
what occurs in the predesign phase
needs analysis, feasibility study, master plan, hire architect
what happens during a needs analysis
why it is needed, number of athletes, goals, hours
what happens during a feasibility study
budget, how much money you have
who might be included in a design committee
contractors, architects, executives, pts, ots
what happens during the design phase
finalize committee, create blueprint
what happens during the construction phase
follow master plan, arrange equipment, check construction progress, access legal counsel
what happens during the preoperation phase
hire staff, create cleaning schedule, assign duties, create plan for operation
what should a strength and conditioning professional assess when modifying an existing facility
existing equipment and its condition, needs of athletes and teams, repairs, replacements, or upgrades
what is one challenge when taking over an existing strength and conditioning facility
you may inherit another coach’s set up, equipment, and problems
what is the first step to modifying an existing strength and conditioning facility
form a committee, feasibility study, needs analysis
what is the second step to modifying an existing strength and conditioning facility
create operational plan, remodel and/or upgrade, finalize design and decorations
what is the third step to modifying an existing strength and conditioning facility
arragne equipment, create employee duties and schedule, hire/keep staff
where should the location of the facility be
ground floor away from offices and classrooms
supervision in a facility should be located in
clear line of sight with mirrors providing the opportunity to look out and see everyone
in your facility there should be a ramp or wheelchair lift for any change of height exceeding
0.5 inches (1.3 cm)
a ramp should run
12 in for every 1 in rise (30.5 cm run for every 2.5 cm rise)
steps should have a ____ on the edge to prevent people from falling
rough strip
the ceiling height should be high enough for
jumping or explosive activities
the recommended height of a ceiling is
12 to 14 ft (3.66 m to 4.27 m)
what are the most common floor option
rubber flooring and antifungal carpet, indoor turf
weightlifting platforms should be made of
wood to prevent slipping
what is the minimum recommended amount of floor space for an athlete within a strength and conditioning facility
100 sq ft (9.3m²)
the facility’s lighting should include
artificial and natural, 50 to 100 lumens
what should be the temp of a facility
67-78 degrees
the relative humidity should not exceed
60%
mirrors need to be placed at least ___ from any equipment
6 in (15 cm)
mirrors should be a minimum of ___ above the floor
20 in (50 cm)
drinking fountains should be located away from
training area
having a shower somewhere in the building helps to
prevent the spread of infections and disease
equipment should be grouped in
sections
cardio machines should be
in their own section organized into groups
barbells and dumbbells should have a minimum of ___ between them
36 inches (91 cm)
what are top priorities when placing equipment
safety and function
the area should have at least ____ of open space to perform a dynamic warm up
49 square feet (4.6 m²)
in the circuit area machines should be placed at least ____ and ___ apart
24 inches (60 cm), 36 inches (90 cm)
walkways in the circuit area should be between
4 and 7 feet (1.2-2.1 m) wide
racks and dumbbells should be lined up along the
wall
there should be at least ___ between ends of racked bars
36 in (90 cm)
kettlebells can be
under dumbbell rack and have a large area