1/47
Comprehensive vocabulary flashcards based on Exam 1 SCM lecture notes covering Introduction to SCM, Demand Planning & Forecasting, and Supply Chain Planning.
Supply Chain
A connected network consisting of suppliers, a manufacturer, and customers connected by logistics and enablement.
Inbound Logistics
The management and movement of incoming shipments into a business.
Outbound Logistics
The management and movement of outgoing shipments going out to customers.
Tier 1 Partner
A supply chain partner that the manufacturer deals with directly, such as Supplier 1 or Wholesaler/Distributor.
Tier 2 Partner
A supply chain partner that is one step further away from the manufacturer, such as Supplier 2 or Retailer.
Goal of Supply Chain Management
To increase customer service while simultaneously lowering inventory and cost.
Reverse Logistics
The supply chain process handling products coming back for repair, recycling, or disposal.
4 Foundations of Supply Chain Management
The four fundamental areas of SCM: Operations, Supply, Logistics, and Integration.
Efficient Supply Chain Model
A supply chain model focused on stable, predictable products and low-cost, functional products.
Responsive Supply Chain Model
A supply chain model focused on new, fast-changing products, speed, and innovative products.
Make-To-Stock Model
Also known as the Push model or Make to Forecast; a model that starts with a forecast (anticipated demand) to take advantage of economies of scale in large quantities and reduce costs.
Make-To-Order Model
Also known as the Pull model; a production model that starts with a customer order and maintains low inventory.
Demand Planning
The process of combining forecasting math with human management judgment to estimate demand.
Independent Demand
Demand for finished products or spare parts that is forecasted in the Master Production Schedule (MPS).
Dependent Demand
Demand for components and materials that is calculated rather than forecasted.
Qualitative Forecasting
Forecasting based on opinion and human judgment, such as using Historical Analogy to analyze a similar product's sales history.
Quantitative Forecasting
Forecasting based on math and historical data, such as time series and regression analysis.
Regression Analysis
A quantitative forecasting method that links demand to the historical relationship between an independent variable and a dependent variable.
Bullwhip Effect
A supply chain phenomenon where small changes in demand grow bigger as they move up the supply chain because partners guess and overreact.
CPFR
Collaborative Planning, Forecast Replenishment; a system where partners share plans and forecasts to reduce the bullwhip effect and safety stock.
Agility
The capability of responding fast to supply chain changes without losing quality or raising cost.
Random Variation
Sudden, unexpected variations in demand caused by unexpected occurrences like a hurricane or strike.
Seasonal Variation
A demand pattern that repeats every year, such as sales of snow shovels in winter.
Cyclical Variation
Demand variations consisting of wave-like patterns longer than a year, such as macro business cycles.
Trend Variation
A demand variation pattern showing steady upward or downward movement, such as sales growing yearly.
Naive Forecasting Method
A quantitative forecasting method where the next period's forecast equals the last actual demand (Next=last actual).
Simple Moving Average
A forecasting method calculated by adding the actual demand of the last n periods and dividing by n.
Weighted Moving Average
A forecasting method where demand in each period is multiplied by its assigned weight and then summed, with weights totaling 1.
Exponential Smoothing
A quantitative forecasting method calculated using the formula (Actual×S)+(Forecast×(1−S)), where S is the smoothing constant.
Mean Absolute Deviation (MAD)
The average forecast error measured in units, showing only the magnitude of error without sign bias.
Mean Absolute Percentage Error (MAPE)
The average forecast error expressed as a percentage relative to actual demand.
Aggregate Production Schedule (APP)
A long-range strategic plan covering a period of 2 to 10 years that plans production by product family for facilities and major equipment.
Master Production Schedule (MPS)
A short-range tactical plan specifying which end items (finished products, independent items, parent items) to produce, how many, and when.
Material Resource Planning (MRP)
A short-range operational plan that calculates requirements for parts and materials (dependent items and components).
Time Fences
Established boundaries that limit schedule changes on a production schedule.
Distribution Requirements Planning (DRP)
A planning method that decides how much finished product to send to each individual warehouse.
Enterprise Resource Planning (ERP)
An enterprise software system that connects all company departments through a shared central database.
Level Strategy
An aggregate planning strategy that maintains the exact same output every period while inventory goes up and down.
Chase Strategy
An aggregate planning strategy where output directly matches demand, offering low cost to hire and lay off low-skilled workers when workers are easy to train or replace.
Hybrid Strategy
An aggregate planning strategy that maintains a steady core crew and utilizes overtime to meet fluctuating demand.
Bill of Materials (BOM)
A detailed list specifying every single part required in the finished product.
Parent Item
The finished good or independent item in MRP where the demand forecast is assigned.
Component Item
A dependent item or part required to satisfy the needs of a parent item.
Planning Factor
The specific quantity of component parts that go into making ONE parent item.
Scheduled Receipt
A parts order that has already been placed and is currently on its way.
Planned Delivery
A planned parts order that has not yet been released, requiring a customer order and full lead time.
Pegging
The MRP process of tracing a specific part back to the higher-level item that uses it.

Product Z MRP Chart Calculation
An MRP record where monthly ending on-hand inventory equals starting on-hand plus scheduled receipts plus planned deliveries minus gross requirements.