116 Terms

1
New cards
Road
is a structure that link barangays and cities in the country
2
New cards
Primary National Road
is the main highway trunk line system that is continuous in extent that goes from province to province and region to region.
3
New cards
Road
It serves as medium in transporting goods and commodities from one place to another, and as communication link which brings economic development to a nation.
4
New cards
Secondary National Road
it connects a provincial road or national road to a public wharf or railway station.
5
New cards
Provincial Road
it connects two municipalities or cities within a province.
6
New cards
City Road
it a street within the urban area of the city.
7
New cards
Municipal Road
it is a street within the población area of a municipality.
8
New cards
Barangay Road
it is a street located outside the población area of a municipality or urban area of a city and those outside industrial, commercial areas or residential
9
New cards
Major Roads
are frequently used by traffic and classified as National Roads or those which are part of the highway system.
10
New cards
Minor Roads
are roads which is local in nature. It serves only the interest of the locality such as a street. They are less frequently used by traffic.
11
New cards
Highway
it can accommodate greater traffic volume
12
New cards
Street
it serves as a service area connecting to highways.
13
New cards
Earth Road
It is the “simplest form of road” constructed by shaping and smoothing the natural soil traversed by the road line.
14
New cards
Gravel Road
Are constructed from natural gravel together with a sufficient amount of good quality soil to serve as binder. It is sometimes termed as an “all weather road”
15
New cards
Gravel Road
are used to construct Farm to Market Roads which serves to connect rural and agricultural areas to market towns.
16
New cards
Asphalt Road
It is frequently described as “flexible pavement”. It is composed of hot mix combination of asphalt cement, crushed stone, fine sand and a small amount of air.
17
New cards
PCC Pavement Road
It is sometimes termed as “rigid pavement”. It is composed of cement and water which are mixed with clean sand and graded sizes of crushed rock or similar material to make concrete.
18
New cards
Subgrade
is the upper layer of natural soil which may be the undisturbed local materials, or soil excavated elsewhere placed as fill. In either case, it is compacted during construction for road stability.
19
New cards
Aggregate Subbase and Base Courses
are individual stabilizing layers of selected material and designed thickness placed on top of the subgrade to distribute the load transmitted from the surface course.
20
New cards
Surface Course
is the uppermost structural component of the roadway, which provides resistance to wear and shearing stress due to traffic load.
21
New cards
Surface Course
It also provides an even skid resistance surface with comfortable durability and is appropriately crowned to prevent rain water from penetrating into the sub grade.
22
New cards
Shoulders
are located beside the carriage way which is the total width available for passing vehicles, and is used to receive lateral clearance to protect major structures on the roadside, to secure safety and comfort of both motorists and pedestrians and for emergency stopping purposes.
23
New cards
Drainage Structures
are located beneath or alongside the roadway used in collecting, transporting and disposing of surface water originating in or near the road right of way.
24
New cards
Types of Drainage
lateral drainage: U shaped, V shapedl.
transverse or cross drainage: box culvert or pipe culvert.
25
New cards
Slope Protection Structures
are constructed along the side of the roadway to stabilize the slopes.
26
New cards
Retaining Walls
are constructed along the side of the roadway if there are space constrictions.
27
New cards
Erosion and sediment controls
are constructed to prevent detrimental effects.
28
New cards
As Stake Survey
Determines the actual position of the road structure based on the plans. Helps in determining what necessary deviation should be undertaken.
29
New cards
Detour Roads
Becomes necessary to divert traffic from any existing roadway whenever the construction operations block the flow of traffic.
30
New cards
Access Roads
A road by which a job is connected to the highway system and is generally used in connection with borrow pits.
Are also built for each isolated piece of job it services.
31
New cards
Clearing and Grubbing
is the removal and disposal of all surface objects including vegetation, grass, stumps, trees and other protruding obstructions not designated to remain along the roadway prior to commencing of any earth moving activity.
32
New cards
Disposal of Debris
The Contractor should coordinate with the Project Engineer regarding the identification of sites for disposal area in compliance with the provisions stated in the Environmental Clearance Certificate issued by the Department of Environment and Natural Resources (DENR).
33
New cards
Removal of structures and obstructions
consist of the taking away, wholly or in part, and the satisfactory disposal off the site of all structures within the construction site and right of way which have not been designated to remain.
34
New cards
Excavation
consists of all the excavation for grading and draining the roadway, and includes loading, hauling and placing the excavated materials from roadway cuts to construct embankments or its disposal to a designated location.
35
New cards
Unsuitable Excavation
is the removal and disposal of saturated mixture of soils and organic matter such as peat and muck which are not suitable as road foundation materials which can cause instability in embankments.
36
New cards
Common Excavation
refers to the excavation of common materials along the road traverse that may be placed as fill or disposed as surplus.
37
New cards
Rock Excavation
is the digging on the ground necessary along the road way traverse to remove encountered rock to its designed elevation either for use as an embankment or for hauling to a waste deposit area.
38
New cards
Thru Mechanical Ripping
if the rock is soft.
39
New cards
Thru Controlled Blasting
if the rock is too hard.
40
New cards
Surplus Excavation
are suitable materials excavated along the road traverse which are disposed as excess in the formation of embankment subgrade.
41
New cards
Structure Excavation
consists of the necessary excavation, removal and satisfactory disposal of all materials within the stipulated limits.
42
New cards
Embankment
is describe as the work or volume of earthen material necessary in the formation of embankment roadway thru the use of suitable materials which may be sourced along the road traverse or borrow from an outside source.
43
New cards
10 tons
Compaction should be done by rolling with a minimum weight of ______
44
New cards
500
Conduct one group of three in situ density tests for each _____ square meter or fraction thereof of compacted layer.
45
New cards
windrowing
should be undertaken and allow it to dry
46
New cards
watering/sprinkling
If the material is too dry, ______ with water shall be undertaken uniformly.
47
New cards
Field Density Test
which is conducted on site in order to determine if the required compaction specification has been attained to a specific layer.
48
New cards
Blue Tops
painted sticks placed along the side of the road traverse as guide and reference in the elevation of the different layering requirements of the road project
49
New cards
Subgrade
is that portion of the earth roadbed which after having been constructed to reasonably close conformance with the lines, grades and cross sections indicated on the plans, receives and supports the sub base or base course materials.
50
New cards
fill section
the sub grade is the top of the embankment or the fill.
51
New cards
cut section
the sub grade is the bottom of the cut.
52
New cards
Aggregate Subbase Course
refers to the structural sub layer material of a roadway placed directly on top of the subgrade.
53
New cards
20
Provide blue top of every _____ meters interval (marked staked) for vertical control reference, to be placed along the side of the roadway.
54
New cards
Appropriate crown/cross slope
should be maintained during laying/spreading operation to ensure proper draining when rains occur.
55
New cards
150
A maximum compacted thickness for any layer shall not exceed _____ mm.
56
New cards
Rolling/compaction
shall progress gradually from the sides to the center, parallel to the center of the road and shall continue until the whole surface has been rolled up to the number of passes required based on the trial section result where 100% compaction is attained.
57
New cards
aggregate base course
is the load carrying portion and provides the structural capacity to bituminous concrete slabs by carrying the load and distribute it to the soil under the layers of asphalt concrete.
58
New cards
Spreading
The subbase/base materials shall be spread to the required thickness for compaction.
59
New cards
Compaction
Each layer shall be compacted to the full width.
60
New cards
Prime Coat
is an application of thin bituminous material to a porous base before putting on a surface course.
61
New cards
Tack Coat
is an application of liquid asphalt on an existing pavement
62
New cards
Bitumen
is the essential ingredient in practically all flexible pavements.
63
New cards
“job mix formula”.
The exact percentage to be used is established by the
64
New cards
1. Aggregate
2. Mineral Filler
3. Hydrated Lime
4. Bituminous Material
Job Mix Formula:
65
New cards
Portland Cement Concrete Pavement (PCCP)
is constructed by casting in place, on a prepared foundation, a concrete slab with the top finished to provide a smooth and durable wearing surface for traffic.
66
New cards
Screeder
is used to grade concrete in such manner as to prevent segregation.
67
New cards
Concrete Finishing
Longitudinal Float is used after the concrete has been consolidated
68
New cards
Brooming
of concrete shall be in a uniform appearance of corrugations
69
New cards
Curing
is necessary for the hydration to take place
70
New cards
asphalt sealant
Joints shall be sealed with
71
New cards
Against Rain
To protect the newly poured concrete pavement.
72
New cards
Against Traffic
To protect the newly poured concrete pavement at its early age
73
New cards
cracking
If Contraction Joint or Weakened Plane Joint (WPJ) is not installed, random _____ will occur.
74
New cards
longitudinal construction joint
tie bars
If the lanes are concreted separately, a ________________________ in the form of a key and keyway is used. Deformed _______are placed perpendicular to this joint.
75
New cards
Expansion Joint
Dowel Bars
______________ is usually from 19 to 25 mm wide and extend the full depth of the slab. ___________ is used in expansion joint
76
New cards
Dowels
are “plain round steel bars” generally coated with a thin file of bitumen to protect them against corrosion and to facilitate sliding in concrete.
77
New cards
Tie Bars
: are deformed bars used in construction joints and longitudinal joints together with keys to tie two slabs together. Its installation must be midway in the slab
78
New cards
Concrete Slab
Made of reinforced on plain concrete
79
New cards
Subbase
Portion of the pavement structure between the subgrade and the slab
80
New cards
Subgrade
Bottom portion of the pavement structure
81
New cards
32
The Engineer shall require that measures be taken into consideration to prevent the temperature of concrete mix from exceeding ____ degree C
82
New cards
Surface texturing
is necessary to keep a skid resistant surface and is done after the surface has hardened enough.
83
New cards
Pipe Culverts and Storm Drains
can be constructed before the commencement of earthworks, during earthworks or when the formation has reached sub grade level.
84
New cards
1:2
Mortar proportion is ____ with enough water to obtain the desired consistency.
85
New cards
Backfill
15
30
________ are placed and compacted in layers not exceeding ___ cm. on both sides up to an elevation of _____ cm above the top of the culvert
86
New cards
Spreading
maybe done manually using rakes and shovels at a thin layer which is most ideal to produce easycompaction of material done using hand tampers to insure a thoroughly tamped backfill.
87
New cards
Riprap and Grouted Riprap
is a type of slope protection using boulders of specified size and character which may be done with or without grout and which holds in place embankment slopes, cut slopes and other earth surfaces that may either be eroded or washed away by water.
88
New cards
Dry Riprap
is more economical without considering the grout to bring together the boulders however; it is only applicable to a limited height and slope.
89
New cards
Grouted Riprap
requires the use of grout to fill up the interstices of the boulders both of which are put together to form a monolithic armor and obtain a strong but rigid slope protection structure.
90
New cards
alternately
Boulders and grout are placed layer by layer ________.
91
New cards
longest axis perpendicular
Each stone is laid with its _____________________to the slope in close contact with the adjacent stone.
92
New cards
3
After grouting, the surface is cured for a period of at least _____ days from the date of installation.
93
New cards
Retaining Wall
are structures that support soils at slopes steeper in their angle of repose and because of their resistance to earth pressure derived from their own weight they are also known as “gravity walls”.
94
New cards
less than 150
Stones should have a thickness of not ____ mm.
95
New cards
not be more than 50
Face stones should be pitched to the line along the beds and joints. The maximum projection of rock faces beyond the pitch lines should ___________ mm.
96
New cards
Boulders
one and one half
_________ thickness of not less than 150 mm, and widths of not less than ___________________ times their respective thickness, and lengths of not less than one and one half times their respective widths.
97
New cards
Mortar
composed of one part of Portland Cement and two parts of fine aggregate by volume and sufficient water to make the mortar such consistency that it can be handled easily and spread with a trowel.
98
New cards
Sidewalk
is typically 100 mm to 150 mm thick slab on grade and it is an important feature of the urban environment.
99
New cards
Curb
is the raised rim which forms the edge of the sidewalk
100
New cards
gutter
is the lower horizontal paved portion.