1/185
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Continuing Professional Development under RA 9266
Section 28
Approval date of RA 9266
March 17, 2004
Short title of RA 9266
The Architecture Act of 2004
Which of the following is not considered an unprofessional or dishonorable conduct and hence not a ground for the revocation of certificate?
None of the above
Activity that is NOT prohibited in the practice of architecture
Supervising the preparation of contract documents
Which of the following shall be issued by the Board to a registrant as an evidence that the person named therein is entitled to the practice of the profession the privileges appurtenant thereto while such remains unrevoked and unsuspended?
PRC Certificate of Registration
Integrated and Accredited Professional Organization of Architects
United Architects of the Philippines (UAP)
IAPOA
Integrated and Accredited Professional Organization of Architects
What the Architect must do to be fair to the Contractor
All of the above
Is it ethical and legal for an architect to hire employees on a per project basis since SSS and Medicare is not required but only group insurance and employees can be terminated even after six months?
No
Appropriate response of an architect to corruption as a concerned citizen
Abide by the Code of Ethics
Unethical practice concerning colleagues and subordinates
Affixing a signature to plans prepared by another person or entity
Liability for documents under the seal of the Architect of Record
The Registered and Licensed Architect serving as Architect of Record is professionally responsible for the documents issued under the seal
The Architect has a duty to God, country, and
Himself
Practice of architecture as a privilege to be enjoyed by all
False; it is a regulated professional practice
Which is not part of Pre-Design Services?
Equipment Evaluation
What type of architectural services is provided for site utilization and feasibility studies?
Pre-Design Services
Activity that does NOT fall under Specialized Allied Services
Architectural Programming
Architect activity that does NOT fall under the Construction Phase
Checking salaries of workers
Fee paid upon completion of Contract Documents Phase
85% of the basic fee
transport
In master development plan formulation, which with movement of people/goods from one place to another?
Specialized Allied Service for plans of contiguous sites for industrial estates, tourist centers, housing subdivisions, and similar developments
Physical Planning
Specialized Allied Service for schedules of shrubs, trees, plants, and landscaping elements
Landscape Design
Built-in the maximum cost exclusive of arch reg. fee
Design build by Maximum Cost, how much is the architect remunerated?
A client is very happy with the plans his Architect made for his house decided that he will use the same design/plans for his son's house. How much will the Client pay the Architect for his second house?
80% of the applicable basic fee
Compensation when an Architect is hired as Facilities Manager
Salary
Compensation after an approved Schematic Design when the Owner terminates the Architect
15% of the applicable contract/basic fee for the completed service
The Architect may still be entitled to just compensation for services actually rendered
Termination without a formal written service agreement
Fee when the Owner does not implement the Architect's completed plans and documents for construction
90% of the Architect's fee
Compensation when the same person serves as Architect and Interior Designer
10% Architectural fee + 15% Interior Design fee
Person in charge of supervising an Architectural Design Competition
Professional Advisor
Time within which prizes in an Architectural Design Competition are to be paid after official announcement of results
One month
Minimum corridor/aisle width serving only one side under PD 1096
800 mm
As per PD 1096, what is the maximum distance to exit of a building if it is equipped with sprinklers?
60 m
Minimum ceiling height of habitable rooms with natural ventilation
2.70 m
Minimum area and least dimension of a habitable room
6.00 sq.m. with a least dimension of 2.00 m
Open space bounded on three sides by building lines and on one side by another open space
Through Court
Failure to commence work after Building Permit issuance
12 months
Total number of persons who may occupy a building or portion thereof at one time
Occupant Load
Minimum first storey ceiling height of a habitable room with artificial ventilation
2.4 m
Minimum area of a habitable room
6.00 sq.m.
Minimum clear width for Group A dwelling stairs under PD 1096
0.75 m
"R-3" classification for Residential Zone?
high density
Minimum corridor width for apartments with required capacity over 50 persons under the Fire Code
1.10 m
Protected passageway providing a way of travel to an exit discharge
Fire Exit
Minimum number of exits for a Class A place of assembly with capacity over 1,000 persons
4
Maximum travel distance for places of assembly without automatic fire suppression
46 m
Bar across a door leaf that opens the door when pressure is applied
Panic Hardware
Fire Code of the Philippines
Republic Act No. 9514
Minimum opening width of doors under the Fire Code
0.81 m. minimum
Integrated piping system that automatically suppresses fire when actuated
Automatic Fire Suppression System
Passageway from one building to another or through/around a wall at approximately the same floor level
Horizontal Exit
1:12
ramp gradient under the traditional BP 344 standards
Maximum gradient of a dropped curb under the traditional BP 344 standards used by the reviewer
1:12
Minimum walkway width allowing a wheelchair user to traverse safely
1.20 m
As per BP 344, accessible public washrooms and toilets shall permit easy passage of wheelchair and must allow how much turning space for wheelchairs?
2.25 sq. m.
Maximum ramp length at a 1:12 gradient under the traditional BP 344 standards
6.00 m
Minimum width of an accessible parking slot
3.70 m
Clear space required before and after doorways
1.50 m × 1.50 m
Central refuge requirement
Provide a central refuge when the carriageway exceeds 10 m
Maximum distance of an accessible elevator from the entrance
30 m
Maximum distance of accessible parking from the facility served
60 m
Inclined break in a sidewalk or traffic island
Dropped Curb
Minimum RROW from PD 957
8 m.
Maximum block length without requiring an alley under PD 957
250 m
Minimum area for a single park/playground in a residential condominium project
50 sq.m.
As per PD 957, what is the minimum floor area for a condominium unit?
18 sqm.
1%
BP 220, percent required for areas allocated as community facilities for project density of 150 and below?
Minimum clear width of stairways under BP 220
0.60 m
Maximum length of an alley in a residential block under BP 220
60 m
Minimum lot area for a single detached socialized housing unit under BP 220
64 sq. m.
Minimum distance between two buildings where the taller building has 3 or 4 storeys under BP 220
6 m
The minimum lot frontage of a regular lot for single-detached units as provided for in BP 220.
8 m.
Most fair compensation method for architect and client
Percentage of Construction Cost
Professional fee for a P3,000,000 residential project basing on UAP’s Schedule of Minimum Basic Fee?
300,000
n architect has done the renovation of a residence in Valenzuela. Project construction cost is P3,000,000.00. Using UAP Standards, how much does the architect expect to receive as a minimum basic fee from his client?
450,000
In a typical-owner agreement, which of the following is chargeable to the owner?
Miniature Models
Item generally not part of the Architect's professional fee
Special interior design / movable furniture
Under the owner-architect agreement, which of the following include the contract document phase of architect's basic services? A. Assistance in
all listed items
Who is responsible for payment of professional services required by architect such as normal structural, electrical, plumbing, and mechanical engineering services?
Owner
Item not included in Project Construction Cost
Architect's professional fee
Service that must be paid separately when designed/planned by the Architect
Landscaping
Duty violated when historical elements of a heritage structure are removed solely for modernization
Conserve cultural and historical heritage
Architect's proper response to a valuable gift from a contractor
Decline it because it may place the Architect under obligation
An architect signs and seals drawings prepared entirely by a third-party draftsman working independently. This violates the rule that:
He shall not sign and seal documents not prepared under his direct supervision
Claiming another architect's building design as one's own
Violation of professional relations with colleagues
Failure to report substandard construction materials
Violation of the duty to reject materials that do not comply with the contract documents
Master's degree credit toward diversified architectural experience for licensure
A master's degree may be credited as one year of diversified experience under the applicable RA 9266 qualification requirements
Item NOT within the defined scope of architectural practice under RA 9266
Structural conceptualization, when presented as an independent engineering structural
Architectural plans and designs prepared by an architect
Intellectual property of the architect, unless otherwise stipulated
Ground that is NOT a basis for removal of a Board member
Designing a building similar to another
Ground for refusal to issue a Certificate of Registration
Conviction of an offense involving moral turpitude
A private client forces an architect to proceed without a signed service agreement. Under RA 9266:
Misdemeanor
Minimum architect ownership in a registered architectural firm/corporation
75%
Person fully responsible for documents issued under a professional seal
Architect of Record
Agency with which an architectural corporation/partnership is registered
Securities and Exchange Commission (SEC), together with registration requirements of the Board
Primary basis for selecting the most appropriate Architect
Type and complexity of the project
Basis of the Terms of Reference in Comparative Selection
Design Brief prepared for the project
Typical use of an Architectural Design Competition
Civic or monumental projects
Typical submission in Comparative Selection
Price proposal/bid