Banbury location
Town in Oxfordshire about 50 km north of Oxford, on the River Cherwell (tributary of the Thames)
Why scheme was required
1998 flood closed train station and roads, causing £12.5 million damage and over 150 homes and business affected, 2007 flooding caused anxiety and economic loss
Hard management
2.9km Earth Embankment parallel to M40 creating flood storage reservoir, flow control structure with raised flood gates, raised A361 road, new pumping stations
Current high economic cost
Pumping stations like morrfiled brook that protect 400 homes in grimsbury by pumping rainwater out
Soft engineering
Afforestation (increases lag time), Wetland habitats (handles flooding), floodplain zoning (convert to parkland), flood warning systems (environmental agency)
Management strategy2
flow control structure with flood gates, raised A361 road, new pumping stations, Biodiversity Action Plan creating habitats and ponds
Social impacts
Reduced anxiety and depression after flooding, temporary disruption during construction(noise, road diversions), new recreational areas near reservoir
Economic impacts 1
Cost ≈ £18.5 million funded by Environment Agency and Cherwell District Council, protects 441 homes and 73 businesses worth over £100 million
Economic impacts 2
prevents costly flood damage, boosts local confidence
Environmental impacts
Moved ≈ 100 000 tonnes of earth for embankment, created new wetland habitats, improved biodiversity, reduced pollution risk (less spills and vegetation runoff), heavy machinery damaged nearby vegetation
Overall evaluation
Effective and sustainable long term protection: high initial cost and disruption but major social and economic benefits