Y10 Geography - Banbury

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/10

encourage image

There's no tags or description

Looks like no tags are added yet.

11 Terms

1
New cards

Banbury location

Town in Oxfordshire about 50 km north of Oxford, on the River Cherwell (tributary of the Thames)

2
New cards

Why scheme was required

1998 flood closed train station and roads, causing £12.5 million damage and over 150 homes and business affected, 2007 flooding caused anxiety and economic loss

3
New cards

Hard management

2.9km Earth Embankment parallel to M40 creating flood storage reservoir, flow control structure with raised flood gates, raised A361 road, new pumping stations

4
New cards

Current high economic cost

Pumping stations like morrfiled brook that protect 400 homes in grimsbury by pumping rainwater out

5
New cards

Soft engineering

Afforestation (increases lag time), Wetland habitats (handles flooding), floodplain zoning (convert to parkland), flood warning systems (environmental agency)

6
New cards

Management strategy2

flow control structure with flood gates, raised A361 road, new pumping stations, Biodiversity Action Plan creating habitats and ponds

7
New cards

Social impacts

Reduced anxiety and depression after flooding, temporary disruption during construction(noise, road diversions), new recreational areas near reservoir

8
New cards

Economic impacts 1

Cost ≈ £18.5 million funded by Environment Agency and Cherwell District Council, protects 441 homes and 73 businesses worth over £100 million

9
New cards

Economic impacts 2

prevents costly flood damage, boosts local confidence

10
New cards

Environmental impacts

Moved ≈ 100 000 tonnes of earth for embankment, created new wetland habitats, improved biodiversity, reduced pollution risk (less spills and vegetation runoff), heavy machinery damaged nearby vegetation

11
New cards

Overall evaluation

Effective and sustainable long term protection: high initial cost and disruption but major social and economic benefits