Operational Process System
Characterized by a large number of homogeneous products passing through a series of processes
May require materials, labor, and overhead inputs
Upon completion of a particular process, the partially completed goods are transferred to another process
Process-costing system
Accumulates production costs by process
Transferred-in cost: Cost transferred from a prior process to a subsequent process
Has a work-in-process (WIP) account for every process
Job-order costing system
Accumulates production costs by job
Uses a single WIP account
Production Report
Traces the flow of units through a department and identifies the costs charged
Shows the computation of unit costs and reveals the disposition of the department’s costs for the reporting period
Divided into unit information and cost information sections
Unit information section:
Units to account for
Units accounted for
Unit Costs
Key input to the cost of production report
Presence of significant work-in-process inventories complicates cost and output definitions needed for unit cost calculation
JIT Manufacturing Firms
Emphasize continuous improvement and the elimination of waste
Strive to minimize inventories
Objective - Simplification
Create work cells that produce a product or subassembly from start to finish
Unit costs are computed by dividing the costs of the period by output of the period
Equivalent Units of Output
Complete units that could have been produced given the total amount of productive effort expended for the period under consideration
Every transferred-out unit is an equivalent unit
Physical flow schedule
Provides an analysis of the physical flow units
Calculation of the period’s equivalent units
Unit cost calculation
Valuation of inventories
Cost reconciliation
Costs in beginning WIP and costs incurred during the current period should equal the total costs assigned to goods transferred out and to goods in ending WIP
FIFO Costing Method
Equivalent units and manufacturing costs in beginning work in process are excluded from the current period unit cost calculation
Recognizes that the work and costs carried over from the prior period legitimately belong to that period
Categories of completed units
Beginning work-in-process units
Units started and completed during the current period
Weighted Average Costing Method
Treats beginning inventory costs and accompanying equivalent output as if they belong to the current period
Merges prior period output and manufacturing costs found in beginning work in process with the current period output and manufacturing costs
Weighted Average Method VS FIFO
The output is calculated
What costs are used for calculating the period’s unit cost
Advantage of WAM- simplicity
Disadvantage - May impair accuracy and performance measurement
Treatment of Treansferred-In Goods
Cost of this material is the cost of the goods transferred out computed in the prior department
Units started in the subsequent department correspond to the units transferred out from the prior department
Units of the transferring department may be measured differently than the units of the receiving department
Goods transferred in must be converted to the units of measure used by the second department
Operation Costing
Blend of job-order and process-costing procedures applied to batches of homogeneous products
Uses job-order procedures to assign direct materials costs to batches
Uses process procedures to assign conversion costs
Work orders
Are used to collect production costs for each batch and initiate production