How is the scheme moving towards net zero?

  • For operational carbon use LED lighting, energy-efficient design and renewables e.g. solar panels

  • For embodied carbon, we use existing materials, recycled and local materials

  • Keep the existing road network instead of building new roads


2
New cards

Is ground source heat realistic, and what does it cost?

  • We use piled foundation walls and existing mineshafts to reach latent ground heat, giving residents cost-effective heating

  • Upfront costs are high but running costs are lower so it evens out over the long term

  • Heat exchange and water treatment sit in the same heat and water hub, working as one combined system


3
New cards

Why should we believe the net-zero claim?

  • We use the Environment Agency's Net Zero by 2030 commitment as our benchmark
  • We address it at every stage of the life cycle assessment
  • Would quantify it properly in the final report with an embodied-carbon calculation
4
New cards

How do green features benefit residents as well as the environment?

  • Planting is designed to be used with sensory planting and sheltered seating
  • Tree lined routes connect residents to nature every day
  • Dementia village is a car free square, enclosed by trees which improves air quality and gives a greener outlook
5
New cards

How does travel reduce emissions?

  • Cycle and pedestrian routes follow LTN 1/20
  • Mobility hub sits next to the shuttle route, close to the dementia village, the BTR homes and residential buildings
  • Makes shuttle a low effort daily option as opposed to the car
6
New cards

Where does the scheme's energy come from?

  • Solar panels provide renewable energy where possible
  • Ground-source heat supplies heating for residents
  • LED lighting and energy-efficient design cut demand in the first place
7
New cards

How does ground-source heat actually work here?

  • Piled foundation walls and existing mineshafts reach latent heat in the ground
  • This gives residents cost-effective heating
  • It sits in the Heat and Water Hub, so it works as one system with the water treatment
8
New cards

Isn't the upfront cost too high?

  • The initial cost is high, but running costs are lower
  • It evens out over the long term through cheaper heating
  • Using foundation piles and mineshafts that already exist reduces the extra work (suggestion)
9
New cards

What if the ground-source system doesn't deliver enough heat?

  • Ground conditions would be tested first with a ground investigation (suggestion)
  • Solar panels and efficient building design lower the heat demand
  • A backup system could top up peak demand (suggestion, so agree with your team)
10
New cards

Why does energy matter especially for this site?

  • Many residents are older, and 15 million people in the UK are over 60
  • Cheap, reliable heating supports the health pillar of the brief
  • Lower bills feed the wealth pillar, because savings stay with residents
11
New cards

How do you reduce embodied carbon?

  • Reuse existing materials and use recycled materials
  • Use local materials, which also cuts transport
  • Keep the existing road network instead of building new roads
12
New cards

Why use local materials?

  • They fit the palette of the neighbouring buildings
  • Shorter transport distances mean lower carbon (suggestion)
  • Red brick is also part of the dementia-friendly colour scheme
13
New cards

Why keep the existing roads?

  • New roads carry a lot of embodied carbon, so keeping them avoids it
  • Less construction means less disruption for neighbours (suggestion)
  • Pedestrian and cycle routes can be added along the existing network
14
New cards

How would you prove the carbon savings?

  • Assess carbon at every stage of the life cycle
  • Quantify embodied carbon with a calculation in the final report
  • Compare against the Environment Agency's net-zero-by-2030 benchmark
15
New cards

Does reusing materials compromise quality or safety?

  • Reused materials would be tested and checked before use (suggestion)
  • Recycled content must still meet design standards (suggestion)
  • The aim is to cut carbon without lowering durability, since the scheme is meant to be "built to last"
16
New cards

How does the scheme protect nearby homes?

  • High-rise blocks are kept away from the west of the site
  • That avoids overlooking and shadows over existing homes, which protects privacy and sunlight
  • The tall buildings go in the south, near parking and existing routes
17
New cards

Will the existing community be able to use the site?

  • Public access runs throughout the site, as the council's DMU9 principles require
  • Green spaces are open to the surrounding area
  • Retail stays below the 1,300 m² limit
18
New cards

How does the scheme respect local heritage?

  • The site was originally Newcastle General Hospital, and its history is respected
  • Heritage cues act as wayfinding
  • The local material palette sits naturally alongside neighbouring buildings
19
New cards

What benefits do existing residents get?

  • Flood protection from the retention ponds in the highest-risk areas
  • Shuttle buses and better walking and cycling routes
  • A wider community, with green spaces open to all, instead of a place only for older people
20
New cards

How will you limit disruption during construction?

  • Phasing builds the infrastructure and community first, before the care buildings are occupied
  • Keeping the existing roads reduces the amount of new construction
  • A construction management plan covering noise, dust and traffic would be needed (suggestion; the slides don't mention one