National Building Code of the Philippines (PD 1096)
• Established last 1977 and was revised last 2005
• Legal Opinions have been raised particularly in signing of
drawings
• RA 544 – Civil Engineering Law
• RA 9266- New Architecture Act of 2004
• IRR of BP 344 - Requiring Certain Buildings, Institutions, Establishments
and Public Utilities to install Facilities and Other Devices
• RA 9514 - Fire Code of the Philippines of 2008
• National Plumbing Code of the Philippines
• RA 10752 - An Act Facilitating the Acquisition of the Right-of-Way, Site
or Location for National Government Infrastructure Projects
• National Structural Code of the Philipines
• Philippine Electrical Code
• Philippine Mechanical Engineering Code
• Civil Code of the Philippines
National Building Code of the Philippines (PD 1096)
Legal Provisions:
“No person, firm or corporation, including any agency or instrumentality of
the government shall construct, alter, repair, convert, use, occupy, move,
demolish and add any building/structure or any portion thereof or cause the
same to be done, without first obtaining a building permit therefor from the
Building Official assigned in the place where the subject building/structure is
located or to be done.”
National Building Code of the Philippines (PD 1096)
General Building Provisions:
Building Permits:
• At least five sets of signed and sealed plans and
specifications
• Transfer Certificate of Title (TCT)/copy of contract of lease
• Tax Declaration/Deed of Absolute Sale
• Current Real Property Tax Receipt
• Estimated cost of the proposed work
• Use or occupancy for which the proposed work is intended
• Description of work
Application of Building Permit:
-The owner of the building/structure shall submit to the Office of
the Building Official the application of Certificate of Occupancy.
Attached with the application are, as-built plans and
specifications, certificate of completion and inspection sheet.
National Building Code of the Philippines (PD 1096)
Occupancy Permit:
a) Geodetic Engineer- lot survey plans;
b) Architect/Interior Designer- architectural documents; architectural interior/interior
design documents
c) Civil Engineer-civil/structural documents;
d) Professional Electrical Engineer- electrical documents;
e) Professional Mechanical Engineer- mechanical documents;
f) Sanitary Engineer- sanitary documents;
g) Master Plumber- plumbing documents;
h) Electronics Engineer- electronics documents.
The sets of plans and specifications should be signed and sealed by the
duly licensed professionals.
true
Floor Plans drawn to scale of not less than 1:100 showing:
Location Plan and Site Plan of minimum scale 1:2000
• Plumbing Plans, Layouts and Details, of minimum scale 1:50
yung iba madalas 1:100 na dapat or lower
true
The dwelling shall occupy not more than 90% of corner lot and 80% of
inside lot and shall be at least 2 meters from the property line. This is to
provide maximum light and ventilation to the building.
true
All inner court/lot shall be connected to a street/yard either by a
passageway with a minimum width of 1.2m or by a door through room/s.
• Yard is the required open space left between the outermost face of building
and the property line
true
A carport shall not be considered as part of the Total Open Space within
Lot (TOSL) particularly if it is entirely roofed or roofed with overhangs. In
such a case, it must be counted as an integral component of the Allowable
Maximum Building Footprint (AMBF)
yes
Minimum air space:
a. School Rooms – 3.00 cu. meters with 1.00 sq. meter of floor area per
person;
b. Workshop, Factories, and Offices – 12.00 cu. meters of air space per
person; and
c. Habitable Rooms – 14.00 cu. meters of air space per person.
Minimum ceiling height is not less than 2.4m.
For more than one storey:
1st floor: 2.7m
2nd floor: 2.4m
Succeeding: 2.1m
Mezzanine floors – 1.8m
oms
Stairs:
• shall be at least 750 millimeters in clear width, with a rise (riser) of 200
millimeters and a minimum run (tread) of 200 millimeters
Entrance and Exit
• There shall be at least one entrance and another one for exit.
Doors:
• Minimum width of 900mm and 2m height
okay
Earthworks:
• Cut slopes for permanent excavations shall not be steeper than two (2) horizontal to
one (1) vertical and slopes for permanent fills shall not be steeper than two (2)
horizontal to one (1) vertical.
• Deviation from the foregoing limitations for slopes shall be permitted only upon the
presentation of a geotechnical/geological investigation report acceptable to the Building
Official.