Finite Capacity Scheduling
AKA finite scheduling
Production planning method that creates creates realistic schedule
Considered limited resource
Machine availability, labour and materials
Ensures efficiency
Features of FCS
Bottleneck management
Capacity management
Realistic scheduling
Benefits of FCS
Increased efficiency
Reliable delivery dates
Cost reduction
High accuracy
Optimized utilization
Enhanced visibility

CUTE
Common Utility Equipment
Used by different departments
: Check in desks at airports
Scheduling in Manufacturing
Inv. For smooth demand
Machine schedules
Union contracts
Social or behaviourial issues
Scheduling in Service
Schedule staff
Maintain inventories
Legal issues for flexibility
Social and behavioural
Scheduling Criteria
Min completion time
Max. Utilize of facilities
Min WIP inventory
Min customer waiting time
Optimism resources so objectives are met
Planning Files
Am item master file obtaining information about each component
A routing file indicates each component’s flow through the shop
A work-center master file contains information about the work center
Forward Scheduling
As soon requirements are known
Produces feasible schedule even if they don’t meet due dates
Results in buildup of WIP inv.

Backward Scheduling
Begins with due dates and schedules final operation first
Schedule produced backwards
Resources may not be available

Critical Ratio
An index number found by dividing the time remaining until the due date by the work time remaining on the job
Jobs with low critical ratios are scheduled ahead of jobs with higher critical ratios
Performs well on average job lateness criteria
= due date - today’s date / work/lead time remaining
= time remaining / workdays remaining
Critical Ratio Technique
1. Helps determine the status of specific jobs
2. Establishes relative priorities among jobs on a common basis
3. Relates both stock and make-to-order jobs on a common basis
4. Adjusts priorities automatically for changes in both demand and job progress
5. Dynamically tracks job progress
Assignment Method
Special class of linear programming models that assigns tasks or jobs to resources
Min cost or time
1 worker = 1 machine
Limitations of Rule Based Dispatching Systems
Needs to be revised to adjust to changes
Don’t look up or downstream
Do not look beyond due dates
Divergence Points
The specific stage in a production process where a generic, unfinished product is customized or finalized into a specific end item
Demand Management
Appointment or reservation systems
FCFS sequencing rules
Discounts or other promotional schemes
When demand management is not feasible, managing capacity through staffing flexibility may be used
Constraint
Anything that prevents the system from achieving a goal
Internal or external
Always at least 1
Theory of Constraints
System based methodology that identifies and address the weakest link in a process
Limits goals to be achieved
Five Focusing Steps
Help identify limiting factor
Identify
Exploit
Subordinate
Elevate
Repeat
Drum Buffer Rope
Drum: Constraint that sets the pace for entire process
Buffer: Small amount of time or resources (inventory) placed before the constraint
Rope: Communication that inventory has been consumed to trigger more inventory to be released into the process without creating excess
TOC Step 1: Identify the Constraint
Look for signs to a constraint
Gather data from work software
Audits/inspections
Metrics: Overall Equipment Effectiveness and Overall Labor Effectiveness
Root cause analysis
Ask operators
TOC Step 2: Exploit the Constraint
Ensure it is running at 100% capacity using your resources
Non-constraints should NOT run at 100%
TOC Step 3: Subordinate All Non-Constraints
Look for factors outside the constraint
Without looking it could lead to build ups from non bottlenecks
Need to give a measure of control
TOC Step 4 : Elevate Constraint Performance
Max and take action to break the constraint
Serious changes; new tech and redistribution of resources
Establish best practices
Analyze KPIs
Perform time studies
Eval. Resources
TOC Step 5: Repeat
Look for the next one
New bottle necks with take the place
Benefits of DBR
Reduces WIP
Increases throughput: Bottleneck is fully utilized
Improves delivery times
Key Technologies in TOC
AI and Machine Learning
Predictive Analytics
Process mining tools
Simulation models
IoT
Automation tools
TOC and Tech in Practice
IT Service Management (ITSM)
Manufacturing
Software development