Comprehensive practice flashcards covering tariffs, metering systems, power factor correction, instrument transformers, and grid management concepts from the Phase 6 Electrical Craft Practice notes.
Maximum Demand (MD)
The highest power (measured in kW or kVA) drawn by an electrical consumer over a specified measuring interval, typically 15 minutes or 30 minutes.
Load Factor
The ratio of average load to maximum demand over a specified period of time (Load Factor=Maximum DemandAverage Load), where a higher value indicates steady, more cost-effective energy usage.
Diversity Factor
The ratio of the sum of individual maximum demands to the maximum demand of the entire group (Diversity Factor=Group Maximum Demand∑Individual Maximum Demands), which is always greater than 1 (>1) and allows supply sizing below total connected load.
Two-Part Tariff
An electricity tariff consisting of a fixed standing charge (€/day) to cover network capacity and capital availability, combined with a variable unit charge (€/kWh) for the actual energy consumed.
Standard Variable Tariff (SVT)
An electricity price plan with no fixed end date where unit rates can rise or fall based on wholesale market changes, typically carrying no exit fees but often priced higher than fixed deals.
Fixed-Term Tariff
An electricity pricing contract that fixes unit rates and standing charges for a set duration (typically 1 to 2 years), providing budget certainty against price hikes but often subject to early exit fees.
Night-Saver Tariff
A dual-rate tariff structure offering discounted unit rates during night hours (e.g., 11 p.m. to 8 a.m. or 11 p.m. to 7 a.m.) and higher rates during daytime hours, suited for night storage heating or electric vehicle charging.
Time-of-Use (ToU) Tariff
A tariff enabled by smart metering where electricity prices vary across distinct time bands (such as off-peak, shoulder, and peak hours) to incentivise shifting power consumption away from periods of high grid demand.
Public Service Obligation (PSO) Levy
A statutory levy charged to all final electricity consumers in Ireland to recover additional generation costs from sustainable, renewable, alternative, and indigenous fuel sources (such as peat) for environmental protection and supply security.
Maximum Import Capacity (MIC)
The agreed limit of electrical power (rated in kVA) contracted between a commercial/industrial consumer and ESB Networks to meet the site's maximum power requirements.
Excess Capacity Charge
A penalty fee billed to non-domestic consumers on maximum demand tariffs for every kVA drawn above their contracted Maximum Import Capacity (MIC) during a billing period.
Low Power Factor Surcharge
A tariff penalty applied to industrial and commercial consumers in Ireland when their reactive energy consumption (kVArh) exceeds one-third (31) of their total active energy consumption (kWh) in a billing period.
Demand Charge (Low Voltage Maximum Demand)
A charge levied on large business consumers for every kW of average power exceeding a 30kW threshold drawn during peak hours (17:00 to 19:00, Monday to Friday) during the winter months (1st November to end of February).
50% Rule (Maximum Demand Billing)
A tariff regulation specifying that the maximum demand billed in any two-month period will be either the actual measured maximum demand or 50% of the highest maximum demand billed in the preceding five billing periods, subject to a minimum of 30kW.
Winter Demand Reduction Incentive (WDRI)
A scheme during November/December and January/February where the ESB restricts maximum demand metering from the standard weekday 13-hour window (8 a.m. to 9 p.m.) to just the two-hour evening peak (5 p.m. to 7 p.m.), rewarding demand reduction.
Active Power (P)
The true, wattful power component that performs physical work, produces light, or creates heat in an AC electrical circuit, measured in kilowatts (kW) and calculated as P=V×I×cos(ϕ).
Reactive Power (Q)
The wattless, non-working power component measured in reactive kilovolt-amperes (kVAr) that sustains oscillating electromagnetic fields in inductive devices, calculated as Q=V×I×sin(ϕ).
Apparent Power (S)
The vector combination of active power (kW) and reactive power (kVAr) supplied to an AC circuit, measured in kilovolt-amperes (kVA) and expressed by the power triangle relationship S=P2+Q2=V×I.
Power Factor (PF)
The ratio of active power (kW) to apparent power (kVA), represented by cos(ϕ), indicating the overall electrical efficiency of power delivery to an installation.
Capacitor Rating Formula (Qc)
The mathematical formula to determine the required power factor correction capacitor rating: Qc=P×[tan(ϕ1)−tan(ϕ2)], where ϕ1=arccos(initial PF) and ϕ2=arccos(target PF).
Current Transformer (CT)
An instrument transformer used to step down high primary currents (100A to 4000A) to standardised, safe secondary currents (5A or 1A) for measurement and system protection.
CT Secondary Open-Circuit Hazard
The dangerous failure condition occurring when a CT secondary circuit is opened under load, causing all primary current to act as magnetising current, producing lethal kilovolt (kV) spikes, insulation breakdown, and core saturation.
CT Burden
The total impedance of the secondary circuit connected to a current transformer, rated in volt-amperes (VA), which must not be exceeded if the rated accuracy class is to be maintained.
Voltage Transformer (VT)
An instrument transformer designed to scale high or medium distribution voltages (such as 400V or 11kV) down to a standard 110V secondary level for instrumentation and protection.
VT Secondary Short-Circuit Hazard
The hazardous failure state of a voltage transformer acting as a voltage source, where a secondary short circuit causes massive overcurrent that destroys the windings unless protected by secondary fuses.
Smart Meter
An electronic metering device equipped with an analog-to-digital converter, microprocessor, and two-way communication module that records consumption in 30-minute intervals and sends readings directly to the utility.
Base Load
The continuous minimum level of electricity demand on the electrical grid across a 24-hour cycle, supplied by the most cost-effective and efficient generating stations running continuously.
Pumped Storage
The technique of storing potential energy by using inexpensive, off-peak night electricity to pump water to an elevated reservoir, later releasing it through turbines during peak hours to modify the daily load curve.
Turlough Hill
Ireland's pumped storage hydroelectric generating station located in County Wicklow, used to balance national electricity grid demand by pumping water at night and generating power during peak hours.
Ardnacrusha
The ESB's first hydroelectric power generating station, commissioned on the River Shannon in 1947 to harness renewable water energy for national supply.

Two-Wattmeter Method
A power measurement method used on a three-phase, three-wire system (balanced or unbalanced) where the total real power is the algebraic sum of both readings: Total Power=W1+W2.

Three-Wattmeter Method
A power measurement configuration used on a three-phase, four-wire supply with a neutral conductor to determine the total real power of an unbalanced load: Total Power=W1+W2+W3.

Optical Scatter Smoke Detector
An optical detector comprising a matte black chamber, a light source focusing onto a light trap, and a right-angle photocell that detects light scattered by smoke particles to trigger an alarm.

Analogue Meter Dial Reading Rule
The standard procedure of reading dials from left to right, recording the lower number whenever a pointer sits between two figures (or recording 9 if the pointer is between 9 and 0).

National Grid System Architecture
The electrical infrastructure hierarchy where bulk electricity is generated at power stations, stepped up to high transmission voltages (400kV/220kV), stepped down at substations, and distributed by ESB Networks at low utilization voltages (230V/400V).
ESB Networks Customer Interface Code Requirements
Regulations mandating commercial and industrial consumers to maintain a minimum power factor of 0.95 lagging to avoid penalty charges, with the authority holding the right to refuse connection for new loads below 0.85.
Commission for Regulation of Utilities (CRU)
The independent statutory regulator in Ireland responsible for consumer protection, energy safety, utility market oversight, and the phased deregulation of retail electricity suppliers.
Deregulation of Irish Electricity Supply
The policy process concluded in 2011 ending price regulation on ESB Customer Supply once its domestic market share dropped below 60% and at least two competitors reached 10% market share, prompting its rebranding as Electric Ireland.
Bulk Group Power Factor Correction
A central power factor correction system where a bank of capacitors is connected across the main incoming busbars and automatically switched in stages via contactors to compensate overall installation load.
Individual Power Factor Correction
Connecting static power factor correction capacitors directly across individual inductive loads (e.g., motor terminals) so that capacitance is introduced only when the specific load operates, reducing cable currents locally.