1/46
Looks like no tags are added yet.
EMB MC 2014 - 005
Revised Guidelines for Coverage Screening and Standardized Requirements
Category A
projects or undertakings which are classified as ENVIRONMENTALLY CRITICAL PROJECTS (ECPs) under Presidential Proclamation No. 2146 (1981), Proclamation No. 803 (1996), and any other projects that may later be declared as such by the President of the Philippines. Proponents of these projects implemented from 1982 onwards are required to secure an ECC.
Category B
Projects or undertakings which are not classified as ECP, but which are likewise deemed to significantly affect the quality Of the environment by virtue of being located in an ENVIRONMENTALLY CRITICAL AREA (ECA) as declared under Proclamation No. 2146 and according to the parameters set forth in the attached guidelines. Proponents of these projects implemented from 1982 onwards are likewise required to secure an ECC.
Category C
Projects or undertaking that are intended to directly enhance the quality of the environment Or directly address existing environmental problems.
Category D
projects or undertakings that are deemed unlikely to cause significant adverse impact on the quality of the environment according to the parameters set forth in the Screening Guidelines.
Category D
These projects are not covered by the Philippine EIS system and are not required to secure an ECC. However, such non-coverage shall not be construed as an exemption from compliance with other environmental laws and government permitting requirements.
Environmental Impact Assessment
EIA
Environmental Impact Statement
EIS
Initial Environmental Examination
IEE
Environmental Performance Report and Management Plan
EPRMP
- EIA Report
- EIS
- IEE Checklist Report
- EPRMP
- Programmatic EIS / EPRMP
All ECC applications shall be accompanied by the following:
Certificate of Non-Coverage
CNC
Philippine Environmental Impact Statement System
PEISS
Certificate of Non Coverage
a certification issued by the EMB certifying that, based on the submitted project description, the project is not covered by the EIS System and is not required to secure an ECC
Undertakings
projects, or series of similar projects or a project subdivided to several phases and/or stages by the same proponent, located in contiguous areas. (Also known as co-located projects)
Environmental Compliance Certificate
document issued by the DENR/EMB, certifying that based on the representations of the proponent, the proposed project or undertaking has complied with all the requirements of the EIS System and has committed to implement its approved Environmental Management Plan to address the environmental impacts.
Environmentally Critical Area
environmentally sensitive area such that significant environmental impacts are expected if certain types of proposed projects or programs are located, developed or implemented in it.
Environmentally Critical Projects
Project or program that has high potential for significant negative environmental impact
Environmental Impact Assessment
process that involves evaluating and predicting the likely impacts of a project on the environment during construction, commissioning, operation and abandonment. It also includes designing appropriate preventive, mitigating and enhancement measures addressing these consequences to protect the environment and the community's welfare.
Environmental Management Plan/Program (EMP)
Section in EIS that details the prevention, mitigation, compensation, contingency and monitoring measures to enhance positive impacts and minimize negative impacts and risks of a proposed project or undertaking.
Heavy Industries
Resource Extractive Industries
Infrastructure Projects
Golf Course Projects
4 main categories of ECPs (Classified as Category A)
Programmatic Environmental Impact Statement
PEIS
Programmatic Environmental Impact Statement (PEIS)
a documentation of comprehensive studies on environmental baseline conditions of a CONTIGUOUS AREA. It also includes an assessment of the carrying capacity of the area to absorb impacts from co-located projects such as those in industrial estates or economic zones.
Environmental Impact Statement (EIS)
the document of studies on the environmental impacts of a project including the discussions on direct and indirect consequences upon human welfare and ecological and environmental integrity.
Initial Environmental Examination (IEE) Checklist Report Form
SHORT AND SIMPLIFIED checklist version of an EIS prescribed by the DENR and required to be filled up by proponents for describing the project's environmental impact and corresponding mitigation and enhancement measures for non-environmentally critical projects located in an ECA.
Programmatic Environmental Performance Report and Management Plan
PEPRMP
Programmatic Environmental Performance Report and Management Plan (PEPRMP)
documentation of actual cumulative environmental impacts of co-located projects with proposals for expansions. Should also describe the effectiveness of current environmental mitigation measures and plans for performance improvement
Environmental Performance Report and Management Plan (EPRMP)
documentation of the actual cumulative environmental impacts and effectiveness of current measures for single projects that are already operating
Project Description
a standard documentation of the description necessary to confirm non-coverage of Category D and Category C projects as wel as projects operating prior to 1982.
DAO 2003 - 30
IRR for the Philippine Environmental Impact Statement (EIS) System
EIS System
aids proponents in incorporating environmental considerations in planning their projects as well as in determining the environment's impact on their project.
EIS System
is concerned primarily with assessing the direct and indirect impacts of a project on the biophysical and human environment and ensuring that these impacts are addressed by appropriate environmental protection and enhancement measures.
Environmental Guarantee Fund (EGF)
fund to be set up by a project proponent which shall be readily accessible and disbursable for the immediate clean-up or rehabilitation of areas affected by damages in the environment and the resulting deterioration of environmental quality as a direct consequence of a project's construction, operation or abandonment. Fund also used for compensation to negative impacts of the project to the environment.
Environmental Guarantee Fund
EGF
EIA Consultant
a professional or group of professionals commissioned by the proponent to prepare the EIS/IEE and other related documents.
Environmental Impact Assessment Review Committee
EIARC
Environmental Impact Assessment Review Committee (EIARC)
independent technical experts and professionals of known probity from various fields organized by the EMB to EVALUATE the EIS and other related documents and to make appropriate recommendations regarding the issuance or non-issuance of an ECC.
Environmental Management Systems
EMS
Environmental Management Systems (EMS)
is a part of the overall management system of a project or organization.
Environmental Monitoring Fund
EMF
Environmental Monitoring Fund (EMF)
fund that a proponent shall set up after an ECC is issued for its project or undertaking, to be used to support the activities of the multi-partite monitoring team. It shall be immediately accessible and easily disbursable.
Environmental Performance
capability of proponents to mitigate environmental impacts of projects or programs.
Environmental Risk Assessment (ERA)
assessment, through the use of universally accepted and scientific methods, of risks associated with a project. It focuses on determining the probability of occurrence of accidents and their magnitude
Initial Environmental Examination (IEE) Report
document similar to an EIS, but with reduced details and depth of assessment and discussion.
Multipartite Monitoring Team (MMT)
community-based multi-sectoral team organized for the purpose of monitoring the proponent's compliance with ECC conditions, EMP and applicable laws, rules and regulations.
Procedural Review
phase in the ECC application review process to check for the completeness the required documents, conducted by EIAM Division at the EMB Central Office or Regional Office.
Scoping
the stage in the EIS System where information and project impact assessment requirements are established to provide the proponent and the stakeholders the scope of work and terms of reference for the EIS.