1/31
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Management Strategies
Gas release monitoring
Tiltmeter
Helicopter monitoring
Remote monitoring
Lava samples
Land zone
Preparedness
Planning
Evacuation
Ballooning bulging
Seismic monitoring
Monitoring types
Seismic
Gas release
Land height change (bulging)
Temperature
Magma release
Lahar sensor
What gas monitoring for?
Sulfur
Can volcanic events be prevented?
No.
But the consequences of a Volcanic Eruption can be prevented
Land zone management
Govern what can happen near volcano
Value of Land Zone Management
Physical separating between people and hazard
Incentivise urbanisation elsewhere
Cons of Land Zone Management
Hard to enforce
Hard to retrofit if already existing
Why land zone not good in LIC
No resource to enforce legislation on rapid development
4 approaches to management
Prevention, preparedness, mitigation, adaptation
Only 1 prevention
Land Zone Management
Preparedness examples
Evacuation plans
Monitoring
Analysis of past eruptions
Analyse?
Previous eruptions
May be similar and learn about specific volcano
Preparedness pros
Allows quick response
Indicate where and when
Preparedness cons
May be reactive only after the event do we know
Expensive
Needs lots of specialist and specialist equipment to implement properly
Mitigation examples
Lava channeling
Water and Dynamite
Effective warning systems
Lava channeling and Water and Dynamite Cons
Good as a last resort, but better to not be exposed at all
Financially extravagant
Single use management scheme
Good last resort
Warning Systems
Use the preparedness to communicate that even is happening
People can effectively respond and reduce their own vulnerability
Education and training of emergency services
Able to respond effectively and act accordingly for specific event
Specialist support
Pros: Valuable in immediate response
Cons : Expensive
Mitigation is only as effective as?
The preparedness that created the system
Why is mitigation risky?
People feel safe due to mitigation methods
Not enough is known
Caught out
Influences and optimistic bias in perception
Use this:
The risk involved with analysis based mitigation is that people are influenced towards a positive hazard perception, with high levels of optimistic bias.
Then get caught out and die.
False sense of Security
Adaptation typically at what scale?
Local community
adaptation value
People naturally move from something they consider a risk
Where is low level adaptation seen
High frequency Volcanoes
People are aware of danger if see lava loads
How can governments adapt
Repurpose the role of the volcano
Land Zoning!
What adaptation in DR Congo?
Change Volcano to grow Cash Crops
Fertile Soils maximised
Adaptation pros
Can function with no central control
Natural cycle
Cheap
Maximised opportunities
Adaptation cons
Perception based - low frequency = no action
No education = no action
No guarantee or science behind it
Best strategy?
Encompasses all four, with an infinite budget
Limits to Hazard Management Capacity?
Budget
Social conditions
Political stability
Resources
Perception
Frequency and magnitude of events
L’Aquila perception example
Evacuated 2x in 2009 with no EQ
Then didn’t evacuate the third time and 300+ died
Boy who cried wolf known as?
Alert Fatigue
People just ignore it