Supply Chain Exam 2

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/48

encourage image

There's no tags or description

Looks like no tags are added yet.

49 Terms

1
New cards

Prevention

Attacks the root causes before waste occurs

2
New cards

Inspection

Catches defects already created

3
New cards

Act

Standardize success or revise and repeat

4
New cards

Plan

Identify the problem and hypothesize cause

5
New cards

Do

Run a small-scale, controlled experiment

6
New cards

Check

Measure results against initial baseline data

7
New cards

Master black belt

Organizational leader coaching other belts

8
New cards

Black belt

Full time professional solving complex defects at amazon/GE

9
New cards

Green belt

Part-time leader of functional products

Highly relevant for supply chain

Commands notable salary premiums

10
New cards

Yellow belt

Team member with basic awareness

11
New cards

Value

Defined strictly from the end customer’s perspective

12
New cards

Value stream

Mapping every action from raw material to delivery

13
New cards

Flow

Moving products continuously without waiting or batching

14
New cards

Pull

Producing only when triggered by actual downstream demand

15
New cards

Perfection

Continuously repeating the cycle to eliminate newly exposed waste

16
New cards

Push systems

Build to forecast, creating inventory and waste

17
New cards

Pull systems

Produce when triggered by actual demand

Reduces forecast dependence and minimizes the bullwhip effect

Replenishment driven by actual consumption, not monthly guesses

18
New cards

Overproduction

Producing more than needed generates all other forms of waste

Requires transportation, storage, and unnecessary human motion

Freezes working capital and hides critical quality defects

Equivalent of upstream bullwhip effect amplification

A true pull system structurally prevents overproduction from occurring

19
New cards

Just in time(JIT) Foundations

Synchronizes production and delivery tightly with actual customer demand

Eliminates inventory buffers to expose hidden process inefficiencies

Demands exceptional quality, as defects immediately stop the flow

Assumes a fundamentally stable and predictable supply chain environment

Eliminates the exact buffers that protect against unexpected shocks

Dominates low-risk, high-velocity, commodity operations

Relies on stable, predictable supply environments

20
New cards

Just in case(JIC) Foundations

Holds strategic buffer inventory to absorb unexpected supply disruptions

Prioritizes supply chain resilience over pure capital efficiency

Protects against volatile demand and geographically concentrated supply risks

Accepts higher carrying costs as a necessary insurance policy

Acknowledge that perfect flow is impossible in extreme uncertainty

Protects critical, high-risk, single-source components

21
New cards

Toyota Production System(TPS)

The absolute foundation of modern lean thinking

22
New cards

Kanban

Visual signals triggering pull-based inventory replenishment

Replaces forecast-based push pull with pure consumption-based pull

Nothing is produced without explicit ________ authorization

Restricts work-in-progress inventory to strict, manageable limits

Drastically reduced overproduction and the dreaded Bullwhip Effect

23
New cards

Jidoka

Embedding quality directly at the production source

Halts production immediately when any defects occur

24
New cards

Poka-yoke

Mistake-proofing operations to physically prevent errors

Physically prevents human errors from happening entirely

25
New cards

Andon Cord

Empowers every worker to stop lines

Prevents defective units from advancing and accumulating value

26
New cards

Value Stream Mapping

Maps material and info flow across the supply chain

Visualizes both value-adding activities and hidden systemic waste

Current state maps reveal massive non-value-adding waiting times

Future state maps provide precise blueprints for lean transformation

27
New cards

Cycle stock

Averages accumulated from ordering in large batches

28
New cards

Safety stock

Buffers protecting against demand and lead-time uncertainty

29
New cards

Anticipation

Pre-built stock for known future demand peaks

30
New cards

Pipeline

Goods physically in transit between supply chain nodes

31
New cards

Decoupling

Buffers isolating process stages with different operating speeds

32
New cards

Holding costs

Capital, space, insurance, and obsolescence expenses

Punish excess inventory and infrequent bulk ordering

33
New cards

Ordering cost

Fixed expenses per purchase order placed

Punish overly frequent, small-batch replenishment cycles

34
New cards

Stockout cost

Lot sales, expedited freight, and brand damage

Trigger bullwhip effect, amplifying supply chain instability

35
New cards

Purchase cost

Unit price paid to the supplier

36
New cards

Basic EOQ(Fixed Price)

Assumes the purchase price remains fixed

The optimal decision requires a mathematical trade-off analysis

37
New cards

Discount EOQ(Variable Price)

Suppliers often reduce unit prices for large orders

Purchase cost becomes a dynamic decision variable

Larger orders yield savings but drive up holding

38
New cards

All-units discount logic

Reduced prices apply to the entire order quantity

Crossing a threshold triggers immediate purchase savings

Holding costs must be recalculated for each tier

Lower unit prices inherently lower per-unit holding cost

39
New cards

Independent demand

External

Must be forecasted

40
New cards

Dependent

Internal

Can be mathematically calculated

41
New cards

Bill of materials

Provides the exact structured recipe for each finished product

Lists all sub-assemblies, components, and raw materials needed

Specifies the exact quantity required per parent item

Maps the precise manufacturing sequence for production

Ensures calculations match the physical assembly requirements

42
New cards

BOM Explosion

Multiplying requirements down through the product recipe

43
New cards

Netting

Subtracting existing on hand inventory from total gross requirements

44
New cards

Time-phasing

Offsetting order dates backward by supplier lead times

45
New cards

Planned order releases

The system schedule for placing exact purchase orders

46
New cards

Enterprise Resource Planning(ERP)

Acts as a single database for the entire firm

Eliminates disconnected functional data silos

Integrates MRP directly with finance and procurement

Ensures all departments plan from identical inventory reality

Automates cross-functional workflows instantly

47
New cards

Electronic Data Interchange(EDI)

Enables standardized computer-to-computer business communication

Eliminates manual re-entry between buyer and supplier systems

Transmits automated purchase orders directly to suppliers

Sends advanced ship notices prior to physical delivery

Accelerates supply chain info flow in real time

48
New cards

Vendor Managed Inventory(VMI)

Transfer replenishment responsibility directly to the supplier

Suppliers actively monitor buyer inventory levels using shared data

Reduces the bullwhip effect by eliminating demand signal distortion

Decreases ordering workload and transaction costs for buyers

Places inventory decisions with the most informed supply chain partner

49
New cards

Consignment Inventory

Supplier physically places inventory at the buyer location and legally retains ownership until the moment of consumption

Buyer only pays for inventory once it is used

Shifts working capital investment from buyer to supplier

Guarantees immediate availability at the physical point of use