Vocabulary practice flashcards generated from the PMP Exam Prep Cheat Sheet aligned with PMBOK 8.

Last updated 1:34 AM on 9/25/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

44 Terms

1
New cards

A.R.T.U.

The sequence for identifying root causes before taking action: Assess/Analyze →\rightarrow Review →\rightarrow Take Action →\rightarrow Update Documents.

2
New cards

Risk

An uncertain event that might occur in the future and could impact the project positively or negatively, addressed through preventive responses and recorded in the Risk Register.

3
New cards

Issue

A problem that has already occurred or is currently happening in the project, addressed through corrective responses and recorded in the Issue Log.

4
New cards

Rolling Wave Planning

A progressive elaboration technique where near-term work is planned in detail, while future work is planned at a higher level and refined as more information becomes available.

5
New cards

Adaptive Planning

A flexible planning approach used in dynamic environments where plans, priorities, and deliverables are continuously adjusted based on feedback and changing conditions.

6
New cards
<p>Lead and Lag</p>

Lead and Lag

Lead is an overlap where a successor task starts before its predecessor completes; Lag is a required delay between the completion of a predecessor task and the start of a successor task.

7
New cards

Resource Leveling

A schedule optimization technique that adjusts activity start and finish dates to balance resource demand with availability, which may change the critical path and extend project duration.

8
New cards

Resource Smoothing

A schedule optimization technique that adjusts activities within their free and total float so that the critical path and overall completion date are not delayed.

<p>A schedule optimization technique that adjusts activities within their free and total float so that the critical path and overall completion date are not delayed.</p>
9
New cards

Analogous Estimating

A top-down technique that uses historical data and parameters from a similar previous project to estimate duration or cost.

10
New cards

Parametric Estimating

An estimating technique that uses an algorithm based on historical data and project parameters to calculate activity duration or cost.

11
New cards

Bottom-up Estimating

A method of estimating project duration or cost by aggregating detailed estimates of individual lower-level components of the Work Breakdown Structure (WBS).

12
New cards

Three-Point Estimating (PERT / Beta Formula)

A weighted average formula considering estimation uncertainty expressed as E=O+4M+P6E = \frac{O + 4M + P}{6}, where OO is Optimistic, MM is Most Likely, and PP is Pessimistic.

13
New cards

Three-Point Estimating (Triangular Formula)

A simple average formula considering estimation uncertainty expressed as E=O+M+P3E = \frac{O + M + P}{3}, where OO is Optimistic, MM is Most Likely, and PP is Pessimistic.

14
New cards

Fast-Tracking

A schedule compression technique where activities normally performed sequentially are performed in parallel, increasing risk and potential rework without increasing cost.

15
New cards

Crashing

A schedule compression technique where additional resources are added to shorten task duration, typically resulting in increased project cost.

<p>A schedule compression technique where additional resources are added to shorten task duration, typically resulting in increased project cost.</p>
16
New cards

Cost Baseline

The approved time-phased project budget, including contingency reserves but excluding management reserves, used to measure and monitor cost performance.

17
New cards

Contingency Reserve

Budget allocated within the cost baseline for identified risks and approved risk responses (known-unknowns).

18
New cards

Management Reserve

Budget allocated outside the cost baseline for unidentified risks (unknown-unknowns), requiring sponsor or CCB approval to utilize.

<p>Budget allocated outside the cost baseline for unidentified risks (unknown-unknowns), requiring sponsor or CCB approval to utilize.</p>
19
New cards

Cost Performance Index (CPI)

A measure of cost efficiency calculated as CPI=EVAC\text{CPI} = \frac{\text{EV}}{\text{AC}}, where a value greater than 1.01.0 indicates under budget and less than 1.01.0 indicates over budget.

20
New cards

Schedule Performance Index (SPI)

A measure of schedule efficiency calculated as SPI=EVPV\text{SPI} = \frac{\text{EV}}{\text{PV}}, where a value greater than 1.01.0 indicates ahead of schedule and less than 1.01.0 indicates behind schedule.

21
New cards

Project Business Case

A documented business justification and feasibility study created before project initiation to explain why the project should be started.

22
New cards

Project Benefits Management Plan

A document defining how project benefits will be measured, realized, maximized, and sustained over time.

23
New cards

Project Charter

A formal document issued by the Project Sponsor that authorizes the project existence and grants authority to the Project Manager.

24
New cards

Scope Baseline

The approved version of the Project Scope Statement, Work Breakdown Structure (WBS), and WBS Dictionary.

25
New cards

Validate Scope

The process of formalizing acceptance of completed project deliverables by key stakeholders.

26
New cards

Control Quality

The process of evaluating deliverables against quality requirements and standards to ensure technical correctness before Validate Scope.

27
New cards

Power/Interest Grid

A stakeholder analysis tool that groups stakeholders by authority level and concern, guiding management strategies: manage closely, keep satisfied, keep informed, or monitor.

28
New cards

Team Charter

A working agreement developed collaboratively by team members establishing values, operating rules, communication norms, and conflict resolution guidelines.

29
New cards

Servant Leadership

A leadership model that prioritizes serving team needs, removing obstacles, coaching, and empowering members rather than exercising command and control.

30
New cards

Tuckman Ladder Model

A model defining the five stages of team development: Forming, Storming, Norming, Performing, and Adjourning.

31
New cards
<p>Collaborate / Problem Solve</p>

Collaborate / Problem Solve

A win-win conflict resolution technique that incorporates multiple perspectives through open dialogue to reach consensus and commitment.

32
New cards

Residual Risk

The remaining risk that lingers after all planned risk responses and mitigation efforts have been implemented.

33
New cards

Secondary Risk

A new risk that arises as a direct consequence of implementing a risk response.

34
New cards

Communication Channels Formula

A calculation determined by N(N−1)2\frac{N(N - 1)}{2} to identify potential communication paths among NN stakeholders.

35
New cards

Product Owner

The Agile role responsible for maximizing product value, defining product vision, and managing and prioritizing the Product Backlog.

36
New cards

Scrum Master

The Agile role that provides servant leadership by coaching the team, facilitating Scrum events, and removing impediments.

37
New cards

Theme, Epic, User Story, Task Hierarchy

The breakdown of Agile work: Themes guide high-level goals, Epics define broad features, User Stories specify concise user-value requirements, and Tasks represent actionable step-by-step activities.

<p>The breakdown of Agile work: Themes guide high-level goals, Epics define broad features, User Stories specify concise user-value requirements, and Tasks represent actionable step-by-step activities.</p>
38
New cards

Team Velocity

An Agile planning metric calculated by summing completed story points in an iteration to forecast future workload capacity.

39
New cards
<p>Burn-Down Chart</p>

Burn-Down Chart

A chart showing the amount of remaining work (story points) over time across iterations.

40
New cards

Lead Time

In Kanban, the total duration from when a work request is first submitted until it is fully completed and delivered.

41
New cards

Cycle Time

In Kanban, the elapsed time from when work actively begins on a task until it is completed.

42
New cards

Fixed-Price Contract

A agreement establishing a set price for well-defined scope, transferring financial risk primarily to the seller.

43
New cards

Cost-Reimbursable Contract

A agreement reimbursing actual seller costs plus a fee, flexible for evolving or uncertain project scopes.

44
New cards

Time and Materials (T&M) Contract

A hybrid contract type combining fixed hourly labor rates with variable material expenses, ideal when scope duration is undefined.