PAES PART 3

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/99

encourage image

There's no tags or description

Looks like no tags are added yet.

100 Terms

1
New cards

chute

passageway for the animals that connects the lairage to the slaughtering area

2
New cards

Downer

animal that is unable to move/stand

3
New cards

Emergency slaughter

Killing as soon as possible to prevent further suffering of the animals like downer

4
New cards

finish floor line

uppermost surface of a floor once construction has been completed

5
New cards

Isolation pen

Designated compartment in the lairage used to seperate sick and injured animals identified at the unloading area and ante mortem inspection

6
New cards

Lairage

place where the animals can rest prior to slaughter and

7
New cards

live weight

weight of the live animal prior to slaughter

8
New cards

transport vehicle

means of transporting animals, including but not limited to trucks, tractor, trailers or utility vehicles

9
New cards

Slaughter houses or abattoir

Premises that are approved and registered by the controlling authority in which food animals are slaughtered for human consumption

10
New cards

suspected animal

any animals presented for slaughter showing physical or physiological abnormalities that may lead the authority to pass or condemn until final judgement can be ascertained and therefore requiring further inspection and/or examination

11
New cards

swine

general bterm for hogs, pigs native pigs and shoats

12
New cards

small ruminants

refers to sheep goat and deer

13
New cards

aeration

movement of air through stored grains for purposes other than drying

14
New cards

access door

provides access inside the silo which may be located at the roof or at the wall

15
New cards

angle of friction

angle of the material when grains held starts to move

16
New cards

base flooring

floor located at the basement of flat bottom silos

17
New cards

control panel

panel where all the controls are located with or without mimic board

18
New cards

evae height

height of the vertical walled segment of silo

19
New cards

Elevator

mechanism that facilitates vertical movement of grains

20
New cards

elevator boot

equipment for receiving grains at the bottom of a bucket elevator

21
New cards

equivalent height

height of grains at level condition

22
New cards

fumigation

action of releasing a toxic chemical in the gaseous state to control a targeted pest

23
New cards

grain headhouse or dumping house

milled or unmilled, seeds or fruits of various food plants more specifically the cereal grasses, intake house grain receiving area which may consist of elevator and other accessories such as weighing and cleaning machine

24
New cards

hopper

eloping, walled structure for discharging grains

25
New cards

load distribution system

structure above the silo bins that houses conveyor systems for frain distribution

26
New cards

mimic board

board where the flow of grains at different points of the system at anytime will be reflecte

27
New cards

overall height

distance between the horizontal supporting plane surface and the horizontal plane touching the uppermost part of the silo structure

28
New cards

overall length

Distance between vertical planes ath the right angles to the median plane of the silo structure and touching it’s front and rear extremities

29
New cards

Overall width

distance between the vertical plane parallel to the median plane of the machine, each plane touching the outermost point of the silo structure on its respective side

30
New cards

peak height

overall height of the silo structure from the topmost structure of the roof to the ground

31
New cards

silo

unit consisting of upright containers used for storage and handling of grains in bulk and provided with necessary equipment and accessories

32
New cards

silo diameter

inside diameter of the largest inscribed circle within the silo cross section

33
New cards

Silo flooring

surface at the bottom of the silo where the grains lie

34
New cards

Slenderness/aspect ratio

ratio of the equivalent height to the silo diameter

35
New cards

spout

Passageway ofvgraina to be loaded into the silo

36
New cards

Stiffener

vertical frame fastened to the silo walls which carries the loads

37
New cards

storage block

portion of the sili where grains are stored

38
New cards

transition

intersection of the Hopper and the vertical wall for Hopper bottom type silos

39
New cards

unloading system

structure below or at ground level that houses the collection equipment

40
New cards

Volumetric capacity

volume contained in the cylindrical portion only of the silo or the volume contained in both the cylindrical portion and the conical section within the roof space

41
New cards

Wall ring

one level of the storage bloack of silo

42
New cards

weather proofing

process ofvsealing the connection s between sheets and other parts such as caulking

43
New cards

wind rings

connected to the side wall stiffeners to provide continuous circular reinforcement around the silo

44
New cards

access ramp

slope located at the side of the road carriageway that provides entrance from lower ground levels

45
New cards

aggregates

granular material of mineral composition such as sand, gravel, she’ll crushed and uncrushed stone or lightweight materials

46
New cards

Agriculture and fisheries

Production of crops, livestock and aquatic flora and fauna

47
New cards

Base course

Layer of aggregate, soil-treated aggregate, treated soil, or soil aggregate of designed thickness that rests upon the subbase or, if no subbase, upon the subgrade, to support a surface course.

48
New cards

borrow

Suitable material used for embankments.

49
New cards

California Bearing Ratio (CBR)

Ratio between a test load and an arbitrarily defined standard load, expressed as a percentage.

50
New cards

Clearing

Removal and disposal of trees, vegetation, or other unwanted materials from the ground surface.

51
New cards

Coco Coir Twine

String made of coconut coir strands twisted together.

52
New cards

coco coir peat

Natural and residual materials from coconut coir which serve as soil conditioner.

53
New cards

Coco log

TubularTubular of coconut coir fiber blankets of different diameter filled with coco coir and or cocobpeat

54
New cards

Coconet

Handspun coconut coir fiber twine woven into blankets of different densitt

55
New cards

Coconut geonet

any coconut coir fiber based material such as coconut, coco , coco peat, placed in slowing lands and embankments to hold the vulnerable soil and permit vegetative growth to control surface erosion and conserve

56
New cards

Compaction

application of pressure to soil materials to result in a dense mass free of excessive voids minimizes settlement, decreases permeability and increase strength

57
New cards

concrete

Hardened mixture of fine and coarse aggregate water, cement and admixture

58
New cards

contractor

entity having contract with procurement agency and accredited by the Philippines Constructors Accreditation Board

59
New cards

course

structural component of specified thickness;it may consist of one layer or more

60
New cards

crossfall or cross slope

transverse slope that helps the carriageway to drain prooerly

61
New cards

culvert

drainage structure that may or may not, directly support and that extends a cross and beneath a highway street, driveway, alley arterial or other public way

62
New cards

drainage

Removal of water from the road area by the use culverts, ditches, channels and other several structures

63
New cards

earthwork

operations connected with excavating and placing embankments with soil, earth or rock

64
New cards

embankment

construction, usually of earth or stone, to raise the ground or formation level above the natural surface

65
New cards

Engineer

a person authorized by law and registered andblicensed by the Professional Regulations Commission to design and supervise the construction box Farm to Market Roads; refers to the engineer of the implementing agency

66
New cards

Equivalent Single Axle Load

load from the conversion of an expected axle load into an equivalent number of 18kip single axle load

67
New cards

erosion control

protection of soil from disclosing by water, wind or other agent

68
New cards

excavation

act of cutting, digging or scooping to remove material

69
New cards

Farm

place devoted for agricultural and fisheries production

70
New cards

Farm to market road

road within the agriculture and fisheries production areas, coastal landing points, and postharvest or processing facilities that links to local roads, national highway and markets

71
New cards

Field density test

determination of the degree of compaction of the soil

72
New cards

Sight distance

distance at which a driver of a vehicle can see an object of specified height on the road ahead, assuming adequate sight and visual acciuty and clear atmospheric conditions

73
New cards

Salvage material

Saving of different existing materials from the projects which are removed and intended to be used in other construction.

74
New cards

sidewalk

Portion of the roadway primarily constructed for the use of pedestrians.

75
New cards

Roadway

Space, location, or site intended to employ traffic consideration, preferably for the transport of agricultural and fisheries products.

76
New cards

Roadbed

Graded portion of a road between top and side slopes, prepared as a foundation for the pavement structure and shoulders.

77
New cards

Road upgrading

Civil works covering removal, replacement, widening of pavement, and/or increase of thickness of pavement to ensure road safety and easier road safety.

78
New cards

Road shoulder

Portion of the roadway contiguous with the traveled way for accommodation of stopped vehicles, for emergency use, and for lateral support of base and surface courses.

79
New cards

Road carriageway width

Lateral design width for one lane or two lanes strip of roadway

80
New cards

road carriageway

Portion of a road intended for the movement of vehicles, exclusive of shoulders.

81
New cards

Rip rap

Quarried stone especially selected, graded and placed to prevent erosion and thereby preserve the shape of a surface, slope, or underlying structure.

82
New cards

Right of way

A part or the entirety of the property, site, or location with defined physical boundaries used or required by a government project.

83
New cards

Plans

The contract drawings which show the locations, character, and dimension of the prescribed work, including layouts, profiles, cross sections, and other details.

84
New cards

One lane concrete road

Concrete roadway, with clearly marked single or one lane for vehicular traffic.

85
New cards

Masonry

Form of stone, brick, concrete block, concrete, or other similar building materials that have been bonded together with mortar to form a structure.

86
New cards

Market

A place, building, or structure where buyers and sellers meet for the sale or purchase of agriculture and fisheries products.

87
New cards

Local roads

Road that predominantly carries through traffic from one area to another, forming principal avenues of travel for traffic movements which include provincial, municipal, city, and barangay roads.

88
New cards

Lane roadway

Roadway with single, two, or more clearly marked lanes for vehicular traffic.

89
New cards

Intersection

General area where two or more roads, within which are included the roadway and roadside facilities for traffic movements in that area.

90
New cards

Grubbing

Removal and disposal of trees, and other unwanted materials below the ground surface.

91
New cards

Grading

Preparation of the subgrade, in line and elevation, for application of pavement materials including base and surfacing materials.

92
New cards

Gradient

Rate of increase or decrease in the level of the land, the slope expressed in percentage.

93
New cards

Gradation

Property of a soil which describes the distribution of size groups.

Gradient Rate of increase or decrease i

94
New cards

Grade

Slope of a roadway, channel, or natural ground.

95
New cards

Geotextile

Fabrics used in subsurface drainage, hydraulic filter, erosion control, sediment control, pavement structures and used as waterproofing and stress relieving membrane, and as a permeable separator to prevent mixing of dissimilar materials such as foundations and select fill materials.

96
New cards

Fill

Suitable embankment materials placed above natural ground line.

97
New cards

Backfilling

The act of refilling suitable materials or replacing unsuitable materials removed during construction.

98
New cards

Backfill

Suitable materials such as gravel, sand, and earth used to refill excavated materials during construction.

99
New cards

shoulder roll over

difference in crossfall between the pavement and it’s adjacent shoulder

100
New cards

specifications

written technical description of materials, equipment, construction system, standard and workmanship that, in conjunction with the drawings, detail the requirements for acceptable completion of the work