MGMT 339 K06 Lean Systems Quiz

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/24

encourage image

There's no tags or description

Looks like no tags are added yet.

25 Terms

1
New cards

Which of these terms is NOT one of the Five​ Ss?

A. Store

B. Sustain

C. Sort

D. Shine

A. Store

2
New cards

The method that groups products with similar characteristics into families and sets aside groups of machines for their production is called

A. jidoka.

B. kanban.

C. group technology.

D. 5S.

C. group technology.

3
New cards

One of the LEAST effective supplier strategies for lean systems is

A. use of local suppliers.

B. to include suppliers during the product design phase.

C. a​ short-term, competitive relationship between the company and the supplier.

D. ​smaller, more frequent stock shipments.

C. a​ short-term, competitive relationship between the company and the supplier.

4
New cards

Manufacturing an item before it is needed is an example of what form of​ waste?

A. underutilization of employees

B. inappropriate processing

C. overproduction

D. motion

C. overproduction

5
New cards

What is the takt time of a manufacturing cell that must produce 250 parts over one shift with 7 hours of available​ time?

A. 0.60 parts per minute

B. 1.68 minutes per part

C. 35 parts per hour

D. 0.60 minutes per part

B. 1.68 minutes per part

6
New cards

The ability to automatically detect the occurrence of an​ abnormality, thereby helping achieve quality at the​ source, is

A. jidoka.

B. muda.

C. ​poka-yoke.

D. kaizen.

A. jidoka.

7
New cards

What is a major reason why a traditional labor contract may cripple a​ company's ability implement​ lean?

A. it reduces the​ company's ability to reassign workers to other tasks as the need arises

B. it reduces a​ company's ability to freeze their schedules to avoid disruptive changes in daily production

C. it reduces a​ company's ability to change their existing layout

D. it may require a company to use​ large-lot production

A. it reduces the​ company's ability to reassign workers to other tasks as the need arises

8
New cards

Value stream mapping analysts start from ​ ________ and work​ _______ to draw the map by hand.

A. a project​ description; with management

B. secondary​ data; quickly

C. the raw material​ end; downstream

D. the customer​ end; upstream

D. the customer​ end; upstream

9
New cards

Lean systems coupled with statistical process control​ (SPC) requires a high degree of regimentation which in turn can lead to

A. trust issues among workers.

B. worker stress.

C. cooperation issues between workers and management.

D. the elimination of reward systems.

B. worker stress.

10
New cards

Which diagram is NOT a part of value stream​ mapping?

A. Current state drawing

B. Future state drawing

C. Implementation plan

D. Transitional phase diagram

D. Transitional phase diagram

11
New cards

Which of the following best characterizes JIT​ systems?

A. Annual review of operation methods

B. Build inventory at a modest rate

C. Push method of material flow

D. Pull method of materials flow

D. Pull method of materials flow

12
New cards

Lean Farms operated every process with a lean philosophy. For example once Cletus returned with an empty​ wheelbarrow, Jake knew it was time to get busy shoveling manure in order to fill it back up. This is an example of

A. a kanban card.

B. a container system.

C. a containerless system.

D. a​ poka-yoke.

B. a container system.

13
New cards

Which of the following is NOT a benefit of small lot size for lean​ systems?

A. ​Reduction-of-cycle inventory

B. Reduction in product lead times

C. Enables a uniform system workload

D. Potential increase in process setups

D. Potential increase in process setups

14
New cards

Benefits of having a flexible workforce include all of the following​ EXCEPT:

A. decreased reliance on inventory buffers.

B. it is easier to relieve bottlenecks.

C. decreased worker morale.

D. a more uniform work flow.

C. decreased worker morale.

15
New cards

The average daily demand for component B is 750 units. The average time for waiting during the production process and materials handling is 0.15 days. Processing time per container is 0.1 days. The container capacity is 50 units and the policy variable is​ 5%. What number of containers is required for component​ B?

A. 2

B. 17

C. 8

D. 4

D. 4

16
New cards

Value stream maps typically include data related to each process including

A. changeover time.

B. cycle time.

C. uptime.

D. All of the above.

D. All of the above.

17
New cards

The service department of Monroe Brothers Automotive would like to achieve uniform workstation loads. An effective system for this firm would be

A. ​single-digit setup.

B. producing items for inventory when demand is slow.

C. a​ big-lot production.

D. a reservation system.

D. a reservation system.

18
New cards

Lean systems can be an integral part of a corporate strategy based on speed as they improve which of the​ following?

A. inventory turnover

B. cycle times

C. labor productivity

D. All of the above.

D. All of the above.

19
New cards

If​ 3,000 parts are in work in process before an assembly operation which is scheduled to process​ 7,500 parts every 5​ days, how many days of work in process inventory are sitting before​ assembly?

A. 2.5 days

B. 2.0 days

C. 0.5 days

D. 0.4 days

B. 2.0 days

20
New cards

In lean​ systems, part commonality serves to increase

A. repeatability.

B. the number of suppliers needed.

C. inventory.

D. the number of deliveries needed.

A. repeatability.

21
New cards

It has been determined that 25 containers are necessary to adequately support the workstation that uses component Y. Each container used has a capacity for 90 components. What is the planned daily supply of component Y to the next​ workstation?

A. ​1,750

B. 900

C. ​3,000

D. ​2,250

D. ​2,250

22
New cards

Which of the following is NOT characteristic of a kanban​ system?

A. It controls the movement of containers from​ source/storage to the production process.

B. Each container contains equal numbers of​ non-defective parts.

C. It serves as a push mechanism.

D. At least one card is associated with a container of process input material.

C. It serves as a push mechanism.

23
New cards

Line flows are recommended in designing lean system layouts because they eliminate waste by reducing

A. the complexity of setups.

B. the requirement for advanced employee training.

C. standard work.

D. the frequency of setups.

D. the frequency of setups.

24
New cards

The pull method is illustrated by

A. farm products.

B. ​made-to-order computer systems.

C. automobile assembly.

D. building it so they will come.

B. ​made-to-order computer systems.

25
New cards

Which of these issues is a problem associated with the conversion to a lean production​ system?

A. Workers can become bored when the current layout is retained and remains fixed.

B. Lean systems require considerable specialization and emphasize each worker retaining one specific job assignment.

C. There is a decrease in the level of trust in a plant once all of the processes have been automated.

D. Workers can feel pushed and stressed since the safety net of inventory has been removed.

D. Workers can feel pushed and stressed since the safety net of inventory has been removed.