LEED V5 - Flashcards/Terms (Part 2)

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/84

flashcard set

Earn XP

Description and Tags

Flashcards

85 Terms

1
New cards
<p>101</p>

101

Xeriscaping

2
New cards
<p>102</p>

102

Flush and Flow Rates

3
New cards
<p>103</p>

103

High-Efficiency Fixtures

4
New cards
<p>104</p>

104

Cooling Tower

5
New cards
<p>105</p>

105

Process Water

6
New cards
<p>106</p>

106

Goals of the Water Efficiency Credit Category

7
New cards
<p>107</p>

107

Types of Water use in and Around Buildings

8
New cards
<p>108</p>

108

Strategies to Reduce Outdoor Water use

9
New cards
<p>109</p>

109

Strategies to Reduce Indoor Water use

10
New cards
<p>110</p>

110

Strategies to Reduce Process Water use

11
New cards
<p>111</p>

111

Energy-Efficient Building

12
New cards
<p>112</p>

112

Building Envelope

13
New cards
<p>113</p>

113

R-Value

14
New cards
<p>114</p>

114

Thermal Bridges

15
New cards
<p>115</p>

115

Energy-Recovery Ventilation

16
New cards
<p>116</p>

116

Ventilation

17
New cards
<p>117</p>

117

Connected Lighting Power (also known as Lighting Power Density

18
New cards
<p>118</p>

118

Occupant Engagement Programs

19
New cards
<p>119</p>

119

Parasitic Loads

20
New cards
<p>120</p>

120

Plug Load

21
New cards

Heat or electricity consumed in support og a manufacturing, industrial, or commercial process other than conditioning spaces or maintaining comfort and amenities for the people in a building

Process Energy

22
New cards

The total energy demand that results from the consumption or release of process energy. Examples include the energy used for commercial cooking, operating and escalator, and supermarket freezers.

Process Load

23
New cards

The amount of energy that needs to be available to operate the project. Energy demand is also known as load.

Energy Demand

24
New cards

The maximum amount of thermal energy or electrical power that must be available at a specific point in time

Peak Demand

25
New cards

Technology used to control HVAC, lighting , and more in a building

Building Automation System (BAS)

26
New cards

Measuring devices and reporting systems that track energy use over time

Energy Meters

27
New cards

A type of commissioning that helps ensure that components of the building envelope are installed and functioning properly

Building Enclosure Commissioning (BECx)

28
New cards

The process of verifying and documenting that a project and all it’s systems and assemblies are planned, designed, installed, tested, operated, and maintained according to project requirements

Commissioning (Cx)

29
New cards

A written document that details the ideas, concepts, and criteria the owner has prioritized

Owner’s Project Requirements (OPR)

30
New cards

A type of commissioning that maintains and continuously improves project performance over time by gathering information about energy performance and using this information in a cycle of analysis, problem-solving, staff training and implementation, and further monitoring.

Monitoring-Based Commissioning

31
New cards

A type of commissioning that is provided by a third party for an existing project that includes assessment and testing of building systems and documentation of any measures that are needed to improve performance

Retro-Commissioning

32
New cards

The process of reducing or eliminating greenhouse gas emissions

Decarbonization

33
New cards

Fluids that change from liquid to gas and back again as they move heat from one place to another

Refrigerants

34
New cards

A measure of how much energy one ton of a gas will absorb over a given period of time relative to CO2. The larger the GWP, the more a given gas warms the Earth compared to CO2.

Global Warming Potential (GWP)

35
New cards

The networks of wires and cables that transport electricity from power plants to end users

Electrical Grids

36
New cards

The process of replacing non-electric energy sources with electricity

Electrification

37
New cards

A type of HVAC system that draws thermal energy out of water, air, or the ground into a refrigerant and then transfers that heat to another place

Heat Pump

38
New cards

A change in a project’s normal electricity-use patterns that is triggered by a signal from a grid operator — typically either an increase in the price of electricity or an alert that system reliability has been jeopardized

Demand Response

39
New cards

The ability to sore electrical or thermal energy on the project site and then either consume the stored energy or return it to the grid if grid power is in short supply

Energy Storage

40
New cards

Systems that allow buildings to manage the level and timing of their electrical demand on the grid

Grid Interactivity

41
New cards

Energy sources that exist in finite quanties and cannot be naturally replenished or regenerated within a human timescale, such as fossil fuels (e.g., oil, coal, and gas) and nuclear energy

Non-Renewable Energy

42
New cards

Renewable energy that is generated at a location seperate from where it is consumed

Off-Site Renewable Energy

43
New cards

Renewable energy that is consumed at the same location where it is produced

On-Site Renewable Energy

44
New cards

Energy that is derived from sources that are replenished at a faster rate than they are consumed, such as sunlight, wind, rain, tides, waves, and geothermal heat.

Renewable Energy

45
New cards

Purchased certificates that fund the production of off-site renewable energy to offset a project’s energy use. RECs are also known as energy attribute certificates (EACs)

Renewable Energy Certificates (RECs)

46
New cards

Separating one part of an electric grid (e.g. a projects’s energy generating system) from the main power network, making the project’s system its own disconnected grid

Islanding

47
New cards
  • Enable well-designed, constructed, and operated buildings that use less energy, produce fewer carbon emissions, and increase their resilience to disruptions.

  • Increase carbon literacy among the people who design, construct, and operate buildings

  • Provide a clear framework to reduce or eliminate carbon emissions, achieve greater energy independence and security, and lower operational energy costs


Goals of the Energy and Atmosphere Credit Category

48
New cards
  • Increasing energy efficiency

  • Managing refrigerant use

  • Replacing on-site combustion with electricity

  • Obtaining energy from renewable sources


Decarbonization Strategies

49
New cards
  • HVAC Systems

  • Water Heating

  • Plug Loads

  • Process Loads


Ways that Buildings use Energy

50
New cards
  • Reducing energy use through efficiency

  • Maintaining energy efficiency over time

  • Decarbonizing through electrification

  • Procuring or producing renewable energy


Steps to an Energy Efficiency Approach

51
New cards

Two Cases that an Energy Model Compares

  1. Base Case

  2. Design Case


52
New cards

A building model (for the project’s size, location, and use) with energy features that meet minimum required energy codes

Base Case

53
New cards

A building model (with the same size, location, and use as the base case), that includes solutions for achieving the project’s energy-performance goals

Design Case

54
New cards
  • Selecting systems that use refrigerants with the lowest possible global warming potential (GWP)

  • Selecting systems that use refrigerants that do not deplete the ozone layer

  • Designing systems to use no more refrigerant than necessary

  • Managing HVAC systems to minimize leaks and to catch them quickly if they occur

  • Developing protocols for HVAC maintenance and decommissioning to help ensure refrigerants are captured and either recycled or destroyed


Strageties to manage refrigerants over the project’s life cycle

55
New cards

Strategies to manage demand on electrical grids


  • Grid Interactivity

  • Demand Response

  • Energy Storage


56
New cards

Chemicals found in many products that can evaporate, or off-gas, at normal indoor temperatures and pressures

Volatile Organic Compounds (VOCs)

57
New cards

Using less material to perform the same function or produce the same resulrs. This is also referred to as material-use optimization

Material Efficiency

58
New cards

A set measures and practices that avoid demand for energy, materials, land, and water while delivering human well-being within planetary boundaries

Sufficiency

59
New cards

An approach where resources are continuously reused and recycled, reducing dependence on virgin resources and minimizing waste

Material Circularity

60
New cards

An evaluation of the environmental impact of a building product or a whole building project over it's entire life cycle, from raw material extraction to construction and disposal. An LCA provides valuable information for decision-making related to design, construction, operation, maintenance, and eventual reuse, recycling, or disposal.

Life-Cycle Assessment (LCA)

61
New cards

Certifications that rate products on their performance across multiple measures, such as environmental and social impact

Multi-Attribute Certifications

62
New cards
63
New cards
64
New cards
65
New cards
66
New cards
67
New cards
68
New cards
69
New cards
70
New cards
71
New cards
72
New cards
73
New cards
74
New cards
75
New cards
76
New cards
77
New cards
78
New cards
79
New cards
80
New cards
81
New cards
82
New cards
83
New cards
84
New cards
85
New cards