MARPOL Annex VI - Prevention of Air Pollution from Ships

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/25

flashcard set

Earn XP

Description and Tags

Comprehensive vocabulary flashcards covering the key terms, regulatory definitions, survey specifications, and emission standards established in MARPOL Annex VI.

26 Terms

1
New cards

A similar stage of construction

The stage at which construction identifiable with a specific ship begins, and assembly of that ship has commenced comprising at least 50 tonnes50\,\text{tonnes} or 1%1\% of the estimated mass of all structural material, whichever is less.

2
New cards

Continuous feeding

The process whereby waste is fed into a combustion chamber without human assistance while the incinerator is in normal operating conditions with the combustion chamber operative temperature between 850∘C850^\circ\text{C} and 1200∘C1200^\circ\text{C}.

3
New cards

Emission

Any release of substances subject to control by Annex VI from ships into the atmosphere or sea.

4
New cards

New installations (Regulation 12)

The installation of systems, equipment (including new portable fire-extinguishing units), insulation, or other material on a ship after the date Annex VI enters into force, excluding repair or recharge of previously installed systems or units.

5
New cards

NOx\text{NO}_x Technical Code

The Technical Code on Control of Emission of Nitrogen Oxides from Marine Diesel Engines adopted by Conference resolution 2, as may be amended by the Organization.

6
New cards

Ozone-depleting substances

Controlled substances defined in paragraph 4 of article 1 of the Montreal Protocol on Substances that Deplete the Ozone Layer, 1987, listed in Annexes A, B, C, or E to the Protocol (such as Halons and CFCs).

7
New cards

Sludge oil

Sludge from the fuel or lubricating oil separators, waste lubricating oil from main or auxiliary machinery, or waste oil from bilge water separators, oil filtering equipment, or drip trays.

8
New cards

Shipboard incineration

The incineration of wastes or other matter on board a ship, if such wastes or other matter were generated during the normal operation of that ship.

9
New cards

Shipboard incinerator

A shipboard facility designed for the primary purpose of incineration.

10
New cards

Ships constructed

Ships the keels of which are laid or which are at a similar stage of construction.

11
New cards

SOx\text{SO}_x emission control area

An area where the adoption of special mandatory measures for SOx\text{SO}_x emissions from ships is required to prevent, reduce, and control air pollution from SOx\text{SO}_x and its attendant adverse impacts on land and sea areas.

12
New cards

Tanker

An oil tanker as defined in regulation 1(4) of Annex I or a chemical tanker as defined in regulation 1(1) of Annex II of the present Convention.

13
New cards

The Protocol of 1997

The Protocol of 1997 to amend the International Convention for the Prevention of Pollution from Ships, 1973, as amended by the Protocol of 1978 relating thereto.

14
New cards

Anniversary date

The day and the month of each year which will correspond to the date of expiry of the International Air Pollution Prevention Certificate.

15
New cards

Initial survey

A survey conducted before a ship is put into service or before the certificate is issued for the first time to ensure that equipment, systems, fittings, arrangements, and materials fully comply with Annex VI.

16
New cards

Renewal survey

A survey held at intervals specified by the Administration not exceeding 5 years5\,\text{years} to verify that equipment, systems, fittings, arrangements, and materials comply with Annex VI.

17
New cards

Intermediate survey

A survey conducted within 3 months3\,\text{months} before or after the second or third anniversary date, replacing one of the annual surveys to ensure equipment and arrangements fully comply and are in good working order.

18
New cards

Annual survey

A general inspection within 3 months3\,\text{months} before or after each anniversary date of the certificate to ensure the equipment, systems, and fittings have been properly maintained and remain satisfactory.

19
New cards

Additional survey

A survey, either general or partial according to the circumstances, conducted after an investigation repair or whenever any important repairs or renewals are made.

20
New cards

International Air Pollution Prevention Certificate

A certificate issued after an initial or renewal survey to ships of 400 gross tonnage400\,\text{gross tonnage} and above and platforms or drilling rigs engaging in voyages under the jurisdiction of other Parties, valid for a period not exceeding 5 years5\,\text{years}.

21
New cards

Major conversion (Marine Diesel Engine)

A modification of an engine where it is replaced by a new engine built on or after 1 January 2000, undergoes a substantial modification as defined in the NOx\text{NO}_x Technical Code, or has its maximum continuous rating increased by more than 10%10\%.

22
New cards

General fuel oil sulphur limit

The maximum permissible sulphur content of any fuel oil used on board ships globally, which shall not exceed 4.5% m/m4.5\%\,\text{m/m}.

23
New cards

SOx\text{SO}_x emission control area fuel sulphur limit

The operational requirement that fuel oil used on board ships within a designated SOx\text{SO}_x emission control area does not exceed 1.5% m/m1.5\%\,\text{m/m}, unless an approved exhaust gas cleaning system or alternative technology is applied.

24
New cards

Vapour emission control systems

Approved systems provided in designated ports and terminals to control and safely collect volatile organic compound (VOC) emissions during the loading of tankers.

25
New cards

Batch-loaded shipboard incinerator

An incinerator unit designed such that the temperature in the combustion chamber reaches 600∘C600^\circ\text{C} within 5 minutes5\,\text{minutes} after start-up.

26
New cards

Bunker delivery note

A document providing details of combustion fuel oil delivered on board, which must be retained on board for at least 3 years3\,\text{years} and accompanied by a representative fuel sample kept for at least 12 months12\,\text{months}.