Network+ Lesson 16: Disaster Recovery (DR) Concepts

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/8

encourage image

There's no tags or description

Looks like no tags are added yet.

9 Terms

1
New cards
Recovery Point Objective (RPO)
  • Maximum acceptable data loss, measured in time

  • Sets the maximum age of files recovered from backup


2
New cards
Recovery Time Objective (RTO)
  • Target time to restore a business process after a disaster

  • Beyond it, consequences become unacceptable


<ul><li><p>Target time to restore a business process after a disaster</p></li><li><p>Beyond it, consequences become unacceptable</p></li></ul><p></p>
3
New cards
Mean Time Between Failures (MTBF)
  • Average time between failures of a system or component

  • Higher MTBF = more reliable


4
New cards
Mean Time to Repair (MTTR)
  • Average time to repair a failed device and restore operations

  • Lower MTTR = more efficient recovery


5
New cards
Recovery Sites: Cold, Warm, Hot
  • Cold: no equipment, connections, or data; days to weeks; cheapest

  • Warm: some equipment and connections; outdated configs/data

  • Warm: hours to days; costs more than cold

  • Hot: all equipment, connections, recent configs and data

  • Hot: minutes to hours; most expensive, fastest


6
New cards
Active-Active vs. Active-Passive
  • Active-active: both systems run at once and share the load

  • Maximizes performance and availability

  • Active-passive: one runs, the other stands by

  • Passive takes over on failure; possible downtime during switchover


7
New cards
Disaster Recovery Testing
  • Ensures recovery procedures are effective and current

  • Regular testing minimizes downtime and data loss


8
New cards
Tabletop Exercises
  • Discussion-based walkthrough of disaster scenarios

  • Evaluates the DR plan; identifies gaps

  • No actual resources are activated


9
New cards
Validation Tests
  • Actually execute the DR processes

  • Verify systems/data restore within recovery objectives

  • Confirm the plan works; train staff on their roles