1/237
Looks like no tags are added yet.
April 5, 2006
Date: Adoption and Promulgation of the Code of Ethical Conduct
The Code of Ethical Conduct
SPP Doc 200?
No. 5, s.2018
(#5-2018)
Amended Architect's Credo:
PRBOA Res. No. ____ Series of _________
June 4, 2018
Date: Amendment date of The Architect's Credo
- highest integrity
- responsiveness
- business acumen
- sensibility
- artistic and technical ability
(SPP 200)
Traits of Architects
- honesty of purpose must be beyond reproach
- acts as professional adviser (unprejudiced) to Client
- exercise of mediation and conciliation functions between Client and Contractor (impartial)
- engaged in a profession which carries with it grave responsibilities to the public
(SPP 200)
Duties and Responsibilities
I - General Provisions
II - People
III - Client
IV - Contractor
V - Manufacturers, Dealers, and Agents
VI - Colleagues and Subordinates
VII - Architects Credo
VIII - Miscellaneous Provisions
(SPP 200)
Articles
- Accountability
- Norm of Conduct
- Professional Excellence
- Ethical relationship
- Sharing
- Respect
- Legacy
(SPP 200)
Amended Architect's Credo (April 5, 2006)
July 27, 2010
Date: approval of SPP Docs 201-209
No. 3, s.2010
(#3-2010)
New/updated SPP for Architects
PRBOA Res. No. ____ Series of _________
Standards of Professional Practice (SPP)
(SPP Annex A)
a required document under Sec. 41 of R.A. No. 9266 (The Architecture Act of 2004) and its Implementing Rules and Regulations (IRR)
Tender
(SPP Annex A)
Bid and ______ shall mean the same
Constructor, Builder
(SPP Annex A)
Contractor/General Contractor shall also mean ___________ or _________
Direct Selection
- reputation
- recommendation from a friend/acquaintance
- recommendation from a former Client
- recommendation from another architect
(SPP Annex A)
This method of selection is used when undertaking a relatively small project
Comparative Selection
(SPP Annex A)
This method of selection may be conducted by committees representing institutions, corporations or public agencies.
(SPP Annex A)
Comparative selection process (IPIVEN)
Architectural Design Competition (ADC)
idea, design, or design-build competition
(SPP Annex A)
Method of selection used for civic or monumental projects.
Advantages:
- opportunities will be open only
- wider range of options
Disadvantages:
- expensive and time-consuming
- time and effort may discourage participation
- potentially unscrupulous prospective Clients will seek free services under the guise of design competition
(SPP Annex A)
ADC advantages and disadvantages
IAPOA or one of its local chapters
(SPP Annex A)
ADCs should be conducted with the assistance of __________ in accordance with the Architect's Guidelines
1) Sponsor or Client
2) Competitors
3) Professional Adviser
4) Jury
(SPP Annex A)
ADC participants
5 members:
1) Architect in good standing
2) Sponsor or Client
(SPP Annex A)
In ADCs, the Jury must be composed of at least ________ members
Pre-Design Services
SPP Doc. 201?
Consultation
(SPP Doc. 201)
When a Client calls upon the Architect to give oral or written advice and direction, to attend conferences, to make evaluations and appraisals regarding a contemplated project and similar activities, the Architect renders valuable inputs whether or not the Client pursues the project
Pre-feasibility Studies
(SPP Doc. 201)
involve the procurement, analysis and use of secondary information gathered for the project to aid the Client in early decision-making
Pre-feasibility Studies
(SPP Doc. 201)
Represents the Architect's initial assessment of a project's soundness, allowing the Client to promptly explore available/ readily identifiable directions/ options
Feasibility Studies
(SPP Doc. 201)
requires primary data gathering and analysis
Feasibility Studies
(SPP Doc. 201)
Detailed analysis of the project based on pre-feasibility studies will determine the viability of a proposed development. This requires primary data gathering and analysis
Feasibility Studies
(SPP Doc. 201)
The studies will set the project against present and future trends to forecast how it will perform over time.
Site Selection and Analysis
(SPP Doc. 201)
This entails the:
1) formulation of site criteria
2) assistance to the Client in site evaluation
3) analysis to determine the most appropriate site/s for a proposed project or building progra
Site Utilization and Land-use Studies
(SPP Doc. 201)
detailed analysis of the site involves the identification of a site's development potentials through the proper utilization of land
Site Utilization and Land-use Studies
(SPP Doc. 201)
The analysis covers the context of the site as well as that of its surrounding environment and the development controls that apply to the site and its environs.
Architectural Research
(SPP Doc. 201)
Entails the conduct of primary and secondary researches and assembled facts used as basis for conclusion
Architectural Programming
(SPP Doc. 201)
This analytical problem-seeking process will lead to the statement and identification of both horizontal and vertical requirements in offering a solution
Architectural Programming
(SPP Doc. 201)
It incorporates a space program with characterizations of the envisioned spaces such as ambiance, cost range, etc
Space Planning
(SPP Doc. 201)
The Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration of the use, allocation and interface of spaces for given activities
Space Planning
(SPP Doc. 201)
is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions (FGDs), space planning surveys, space audits, etc. and subsequent analyses i.e. spatial layouts with stacking concepts, particularly for multi-storey structures
Space Management Studies
(SPP Doc. 201)
An analysis of the space requirements of the project based on organizational structure and functional set-up pinpoints linkages and interaction of spaces.
Space Management Studies
(SPP Doc. 201)
The formulation of the space program will serve as the basis for the development of the architectural plan/design.
Design Brief Preparation
(SPP Doc. 201)
The Architect states the project terms of reference (ToR) including the concept, objectives and other necessary requirements to bid out architectural services (whether public or private).
Promotional Services
(SPP Doc. 201)
Projects may require this in order to develop and generate financial support and acceptance from governing agencies or from the general public. The Architect can act as the agent of the Owner by producing and coordinating the additional activities necessary to complete the services.
Regular Design Services
SPP Doc. 202?
NOT authorized
(SPP Doc. 202)
Business Process Outsourcing (BPO) and Knowledge Process Outsourcing (KPO) firms which have been DTI- or SEC-registered in the Philippines to provide services for overseas clients are ________________ to provide architectural services for projects located on Philippine soil unless they are PRC-registered architectural firms
Project Definition Phase
(SPP Doc. 202)
This phase involves the definition of the requirements of the project by the Owner
Project Definition Phase
(SPP Doc. 202)
In this phase, the Architect in turn informs the Owner of the technical requirements of the project and the concomitant professional fees
Project Definition Phase
(SPP Doc. 202)
In this phase, the Architect consults with the Owner to ascertain the conceptual framework and related requirements of the project and confirms such requirements with him
Project Definition Phase
(SPP Doc. 202)
In this phase, the Architect gathers relevant information and data leading to the definition of the requirements of the project, including the scope of the Architect's services
Project Definition Phase
(SPP Doc. 202)
In this phase, the Architect reviews and refines the owner's space requirements and translates them into an architectural program
Project Definition Phase
(SPP Doc. 202)
In this phase, the Architect prepares an initial statement of probable construction cost
Schematic Design Phase
(SPP Doc. 202)
In this phase, the Architect evaluates the Owner's program, schedule, budget, project site and proposes methods of project deliveries
Schematic Design Phase
(SPP Doc. 202)
In this phase, the Architect prepares the initial line drawings representing design studies leading to a recommended solution, including a general description of the project for approval by the Owner
Schematic Design Phase
(SPP Doc. 202)
In this phase, the Architect submits to the Owner a Statement of the Probable Project Construction Cost (SPPCC) based on current cost parameters
Design Development Phase
(SPP Doc. 202)
In this phase, the Architect prepares outline specifications to fix and illustrate the size and character of the entire project as to type of materials, type of structural, electrical, mechanical, sanitary, electronic and communications systems
Design Development Phase
(SPP Doc. 202)
In this phase, the Architect prepares diagrammatic layout of construction systems
Design Development Phase
(SPP Doc. 202)
In this phase, the Architect prepares an updated Statement of the Probable Project Construction Cost (SPPCC) for submission to the Owner
Contract Document Phase
(SPP Doc. 202)
In this phase, the Architect prepares prepares Technical Specifications describing type and quality of materials, finish, manner of construction and the general conditions under which the project is to be constructed
seven (7) sets
(SPP Doc. 202)
In CD phase, the Architect submits to the Owner ________ sets of all construction drawings and technical specifications for purposes of obtaining a building permit.
Contract Document Phase
(SPP Doc. 202)
In this phase, the Architect updates the Statement of the Probable Project Construction Cost (SPPCC) based on changes in scope, requirements or market conditions
Bidding and Negotiation Phase
(SPP Doc. 202)
In this phase, the Architect prepares the Bid Documents such as
1) forms for contract letting
2) documents for construction
3) forms for invitation and instruction to bidders,
4) forms for bidders' proposals,
5) general / specific conditions of contract, etc.
Bidding and Negotiation Phase
(SPP Doc. 202)
In this phase, the Architect assists the Owner from the early stage of establishing a list of prospective Contractors to awarding of the construction contract.
Construction Manager
Preparation of Bid Documents is usually by _________. If none, architect's responsibility
The Bid Documents are the intellectual property of the Architect and must be returned by all entities acquiring bid documents. A bond may be required to assure the return of the Bid Documents.
(SPP Doc. 202)
Bid Documents are loaned to bidders at an amount sufficient to cover direct and indirect costs attendant to the preparation, packaging, reproduction and delivery of the said documents.
Bidding and Negotiation Phase
(SPP Doc. 202)
For competitive bids / procurements, the Architect
1) furnishes complete sets of the Bid Documents
2) helps in organizing and conducting pre-bid conferences
3) responds to questions from bidders
4) assists the Owner in obtaining proposals from Contractors, analyzes bid results and prepares abstract of bids, notice of award, notice to proceed and other construction contracts
Construction Phase
(SPP Doc. 202)
In this phase, the Architect makes decisions on all claims of the Owner and Contractors on all matters relating to the execution and progress of work or the interpretation of the Contract Documents.
Construction Phase
(SPP Doc. 202)
In this phase, the Architect prepares change orders, gathers and turns over to the Owner written guarantees required of the Contractor and Sub-Contractors.
periodic
(SPP Doc. 202)
In Construction phase, the Architect makes _________visits to the project site to familiarize himself with the general progress and quality of work and to ascertain that the work is proceeding in accordance with the Contract Documents.
During such project site visits and on the basis of his observations, he shall report to the Client defects and deficiencies noted in the work of Contractors, and shall condemn work found failing to conform to the Contract Documents.
(SPP Doc. 202)
The Architect shall NOT be required to make exhaustive or continuous 8-hour on-site supervision to check on the quality of the work involved and shall not be held responsible for the Contractor's failure to carry out the Construction work in accordance with the Contract Documents.
Construction Phase
(SPP Doc. 202)
In this phase, the Architect determines the amount owing and due to the Contractor and issues corresponding Certificates for Payment for such amounts based on his observations and the Contractor's Applications for Payment.
1) Provide full project information
2) When necessary, designate authorized representative to act on their behalf
3) Examine and make decisions re: documents'
4) Furnish or direct the Architect to obtain at his expense, a certified survey of the site
5) Promptly pay arch'l and eng'g
6) Pay for the design and consulting services
7) Arrange and pay for such legal, auditing, insurance, counseling and other services as may be required for the project
8) Pay all reimbursable expenses and all taxes
9) Give prompt written notice to Architect of anything that may impair the successful implementation of the project
(SPP Doc. 202)
Owner's responsibilities
Architect
(SPP Doc. 202)
The Owner should issue orders to the General Contractor only through the ____________
100 km
(SPP Doc. 202)
A per diem plus traveling and living expenses shall be chargeable to the Owner whenever the Architect or his duly authorized representative is required to perform services at a locality beyond _____________ from his established office as it appears in the letterhead.
90% (up to CD)
(SPP Doc. 202)
When the Owner therefore fails to implement the plans and documents for construction as prepared by the Architect, the Architect is entitled to receive as compensation the sum corresponding to _____ of the Architect's fee.
6 months (
(SPP Doc. 202)
When the suspension of construction exceeds a period of _________, the fee for the remaining works shall be doubled.
Architect.
(SPP Doc. 202)
If no Project / Construction Manager is present, the full-time construction supervisor shall be under the technical control and supervision of the _________
the Owner and to the Architect
(SPP Doc. 202)
The full-time construction supervisor shall make periodic reports to _______________ regarding the progress and quality of the work done.
Upon completion of the project, the Owner shall furnish the Architect a copy of the summary of all cost of labor, services, materials, equipment, fixtures and all items used at and for the completion of the construction.
(SPP Doc. 202)
During the progress of work, the Owner shall furnish the Architect a copy of the records of expenses being incurred on the construction.
Income Tax
(SPP Doc. 202)
Any tax (except _____________) that the national and/or local government/s may impose on the Architect as a consequence of the services performed for the project shall be paid by the Owner.
Project Construction Cost (PCC)
(SPP Doc. 202)
The cost of the completed building to the Owner, including the structure, plumbing/sanitary and electrical fixtures, mechanical equipment, elevators, escalators, airconditioning system, fire protection system, alarm and clock system, communications and electronic system, elements attached to the building and all items indicated in the plans, designs, drawings and specifications prepared by the Architect and his consultants.
Project Development Cost
(SPP Doc. 202)
Includes the
1) cost of the construction as well as
2) all professional fees,
3) permits,
4) clearances and
5) utilities and
6) cost of acquiring the project site / lot, cost of money, etc
Specialized Architectural Services
SPP Doc. 203?
Specialized Architectural Services
(SPP Doc. 203)
deals with specific expertise for further enhancement of the architectural interior and exterior components of a project.
Architectural Interiors (AI)
(SPP Doc. 203)
Involves the detailed planning and design of the indoor / enclosed areas of any proposed building / structure, including retrofit, renovation, rehabilitation or expansion work which shall cover all architectural and utility aspects, including the architectural lay-outing of all building engineering systems found therein.
Acoustic Design Services
(SPP Doc. 203)
Involves the detailed planning and design to control sound transmission for compatibility with the architectural design concept.
Architectural Lighting Layout and Design Services
(SPP Doc. 203)
Involves the detailed planning and design of light transmission, timing and control for compatibility with the architectural design concept.
Cost of the Work
(SPP Doc. 203)
means the total cost of all fixtures and accessories, which were either designed, specified or procured by the Specialist Architect and/or his Specialist Consultants (SCs) for the Owner/ Client, and that were used or installed in the project
Site Development Planning Services
(SPP Doc. 203)
The space planning, architectural lay-outing and utilization of spaces within and surrounding a specific building/ structure in relation with the existing natural and/or built environments
civil works and landscaping works
(SPP Doc. 203)
The Architect's Fee for site development planning (SDP) services shall depend on the estimated cost of the _________________, depending on the magnitude and complexity of the work required by the project
small building projects (only)
(SPP Doc. 203)
Ordinarily, the landscaping layout of ____________ could be done by the Architect as part of the site development planning (SDP) effort.
Physical Planning
(SPP Doc. 203)
Refers to the orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as rights-of-way (ROWs), open spaces and activity spaces are to be proposed.
Lead Professional (like Sir Dinky)
(SPP Doc. 203)
Should other services be required by the project, such as environmental studies, feasibility studies, market analysis, access/movement systems, impact analysis and others, said services should be performed by duly qualified professionals with the Architect acting as the _________________ of the physical planning team.
1) physical layout/distribution of areas
2) road network/s
3) vehicular and pedestrian movement/access systems
4) legal easements
5) basic utility layouts/ corridors
6) landscape layouts
7) lot pad elevations
8) lot primacy matrices
9) deed of restrictions (DoR)
10) development standards and guidelines (DSG)
11) lot counts and typology
12) land use tabulations
13) building footprints
14) roof-prints, basement level-prints
15) view corridors
16) building cast shadow projections and/or reflected light/heat projections from buildings, etc.
(SPP Doc. 203)
In Site and Physical Planning (Master Development Planning, Subdivision Planning, Urban Design), the architect prepares
Preliminary up to Detailed Master Development Plans (PMDPs/ DMDPs) showing the:
Comprehensive Development Planning (CDP) Services
(SPP Doc. 203)
are based on the concept of expanded physical planning services to include other activities necessary for the proper handling of the numerous components considered in the formulation, implementation and realization of a Master Development Plan (MDP).
Comprehensive Development Planning (CDP) Services
(SPP Doc. 203)
covers the range of all services from primary data gathering through the formulation of the MDP and the parallel preparation of the environmental impact assessment/ statement (EIA/S)
Comprehensive Development Planning (CDP) Services
(SPP Doc. 203)
may place heavy emphasis on the non-physical/ non-engineering components of the development plan i.e. financial, economic/market demand/forecast, administrative-political-institutional-legal, socio-cultural, environmental, and the like
MDP Services puts a premium on the physical planning and engineering components of the development plan, which are the direct or sequential physical translations of the inputs from the initial stages of the CDP effort.
(SPP Doc. 203)
CDP vs MDP
1) Identifies existing land use, resources, social behavior and interaction
2) Undertakes environmental analysis, demographic analysis and feasibility studies
3) Examines existing laws, ordinances, political/ social constraints
4) Prepares the conceptual development plans, policies, implementing strategies
(SPP Doc. 203)
When the Consulting Architect is commissioned to do a Comprehensive Development Planning effort, he performs the following:
1) Physical Component - land use and the changes which occur within the physical environment
2) Economic Component - the nation's assets and its management.
3) Socio-Cultural Component - the people, their living conditions and the seeking of ways to ameliorate it.
4) Transport Component - road and transit networks, land-sea-air linkages, the movement of people and goods
5) Legal and Administrative Component - the relationship of adopted development proposals and policies to existing laws.
(SPP Doc. 203)
If the Architect (an RLA) is separately qualified and suitably experienced as an Environmental Planner, the range of all services offered by the Architect from data base gathering, to the preparation of environmental impact assessments/statements (EIA/S), up to the formulation of the Comprehensive Development Plan (CDP), may include the following components:
Historic and Heritage Conservation and Planning
(SPP Doc. 203)
The suitably trained and experienced Consulting Architect in this area of architectural practice provides research, assessment, recording, management, interpretation and conservation of historical heritage.
Security Evaluation and Planning
(SPP Doc. 203)
The Consulting Architect in this area of practice arranges and formulates methods of rating and ascertaining the value of structures or facilities which must be fully secured, kept safe, protected, assured, guaranteed and provided sufficient safeguards for the conduct of any work or activity.
Building Systems Design
(SPP Doc. 203)
The Architect in this area of practice engages in methods of producing building components in a highly engineered, efficient and cost-effective manner, particularly for residential and commercial applications.
Facilities Maintenance Support
(SPP Doc. 203)
The Consulting Architect in this area of practice provides the Owner/Client with means and measures to ensure the proper function and maintenance of the building/structure and site after final inspection