1/20
Vocabulary practice flashcards covering prestressed concrete terminology, mechanical principles, historical developments, and elastic stress analysis formulas.
Prestressing
The artificial creation of stresses in a structure prior to loading so that the stresses that exist under load are more favourable, aiming to keep concrete in compression throughout its service life.
Pre-tensioning
A prestressing method in which steel tendons are tensioned before concrete is poured and released from anchorages after the concrete hardens, transferring force by bond stresses.
Post-tensioning
A prestressing method in which concrete is poured and allowed to harden before tendons (sheathed or unbonded) are tensioned and anchored against the hardened concrete member.
Unbonded Tendons
Prestressing strands or wires coated with grease or bituminous material and encased in plastic, preventing bond stresses from developing between the tendon and the concrete.
Bonded Tendons
Tendons housed in metallic or plastic sleeves or formed ducts that are tensioned after concrete hardens and filled with pressurized grout, enabling stress transfer to the concrete via bond stresses.
Transfer
The critical design stage immediately after the prestress force has been fully applied to the concrete and before any long-term stress losses have occurred.
Flexural Bond Stresses
Bond stresses that develop along bonded tendons when a member is subjected to external loading, typically remaining negligible until flexural cracks occur.
Kern Area
The region within a cross-section bounded by eccentricity limits e1=Ay1I below the neutral axis and e2=Ay2I above the neutral axis, within which a tendon develops no tension in the section.

Passive Prestressing Force (Arch Action)
The compressive reactions at the abutments of an arch that evolve directly from and increase in proportion to the magnitude of the applied load.

Line of Thrust
The internal path representing the trajectory of the resultant compressive force in a structural member under combined axial force P and transverse load W.
Eugene Freyssinet
French engineer recognized as 'the father of prestressed concrete,' who understood concrete creep and developed practical prestressed concrete applications beginning in 1908.
Creep
The time-dependent strain of concrete under sustained stress, investigated by Sir William Glanville, whose understanding was critical to overcoming long-term prestress losses.
Veurdre Bridge Trial Arch (1908)
Freyssinet's first prestressing project in Moulins, France, featuring a 50m span and 2m rise that utilized a prestressed tie between pile-supported abutments.
Live-End Anchorage
An anchorage positioned at the end of a post-tensioned member through which the tendon projects and where a hydraulic jack is attached to tension the tendon.
Dead-End Anchorage
A fixed anchorage embedded within the concrete member opposite the jacking end that secures the tendon during post-tensioning.
Minimum Cover for Circular Ducts (cmin,b)
The diameter of the circular post-tensioned duct, not to exceed a maximum of 80mm.
Minimum Cover for Pre-Tensioned Tendons (cmin,b)
A cover depth defined as kϕ, where k=1.5 for plain wire or strand, and k=2.5 for indented wire.
Sign Convention (Prestressed Analysis)
Compressive stresses are defined as positive (+), tensile stresses as negative (−), and tendon eccentricities below the centroidal axis as positive (+).
Hogging Moment (Eccentric Prestress)
An internal upward bending moment induced by positioning the prestress force P at an eccentricity e below the neutral axis, directly counteracting external gravity moments.
Critical Prestress Condition for No Tension (Axial)
The condition where the bottom fibre stress equals zero under maximum bending moment (Mmax), requiring a minimum concentric force of P=zbMmaxA.
Moment Capacity Increase from Eccentricity
An increase in a beam's maximum bending moment capacity by the value P×e, achieved by placing the prestressing tendon at eccentricity e rather than concentrically.