DAY 12 — Sources of Uncertainty

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/34

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 8:37 AM on 10/2/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

35 Terms

1
New cards
What are sources of measurement uncertainty?
Multiple input quantities and other factors that influence the measurement result
2
New cards
Does measurement uncertainty come from only one source?
No
3
New cards
At what stages can uncertainty enter the measurement process?
At different stages including the standard method instrument operator and measurement result
4
New cards
What can contribute uncertainty from a reference standard?
Calibration uncertainty stability or drift resolution assigned or reference value and traceability information
5
New cards
What can contribute uncertainty from the UUT or instrument?
Resolution repeatability indication variation instrument characteristics and corrections
6
New cards
What can contribute uncertainty from the measurement method?
Method limitations approximations corrections mathematical model and setup or configuration
7
New cards
What environmental factors can contribute to uncertainty?
Temperature humidity pressure vibration and electromagnetic effects
8
New cards
Should every environmental factor automatically be included?
Each factor should be considered according to whether it significantly influences the result
9
New cards
What is repeatability?
Variation when repeated measurements are made under defined repeatability conditions
10
New cards
What example repeatability readings are shown?
100.10 → 100.12 → 100.09 → 100.11 °C
11
New cards
How can observed repeatability variation be used?
It can be used to estimate a standard uncertainty component
12
New cards
What are operator or setup effects?
Effects such as measuring or parallax probe placement alignment loading connection and handling
13
New cards
How can limited resolution affect uncertainty?
Limited resolution can contribute to uncertainty
14
New cards
Is resolution the only possible contributor to instrument uncertainty?
No
15
New cards
What calibration data can contribute to uncertainty?
Previous calibration results calibration certificates corrections correction factors and historical data
16
New cards
What information can manufacturer specifications provide?
Accuracy or tolerance limits stability resolution temperature coefficients and other performance characteristics
17
New cards
Should manufacturer specifications simply be copied into an uncertainty budget?
No
18
New cards
What are examples of reference data or external inputs?
Certified reference materials reference tables handbook data calibration standards and external measurements
19
New cards
Are all input quantities independent?
No
20
New cards
What happens when input quantities are correlated?
Covariance terms may need to be considered
21
New cards
When is the simplified RSS approach applicable?
When the relevant inputs are uncorrelated
22
New cards
What is the basic uncertainty-budget process?
Identify contributors estimate input values and uncertainties assign probability distributions determine standard uncertainties apply sensitivity coefficients check correlation and combine to calculate combined uncertainty
23
New cards
What is the first step in building an uncertainty budget?
Identify contributors
24
New cards
What is the second step in building an uncertainty budget?
Estimate input values and uncertainties
25
New cards
What is the third step in building an uncertainty budget?
Assign probability distributions
26
New cards
What is the fourth step in building an uncertainty budget?
Determine standard uncertainties
27
New cards
What is the fifth step in building an uncertainty budget?
Apply sensitivity coefficients
28
New cards
What is the sixth step in building an uncertainty budget?
Check for correlation
29
New cards
What is the seventh step in building an uncertainty budget?
Combine the contributions to calculate combined uncertainty
30
New cards
What is an uncertainty-budget red flag?
A neat uncertainty budget does not automatically mean it is complete
31
New cards
What questions should be asked when reviewing an uncertainty budget?
Were all significant contributors identified
32
New cards
What is the calibrator's mindset for uncertainty sources?
Do not start with the uncertainty calculator
33
New cards
start with the measurement
34
New cards
What question should be asked before calculating uncertainty?
What can influence my result?
35
New cards
What is the main lesson of Day 12?
A complete uncertainty evaluation begins by identifying the factors that can influence the measurement result