Facilities and Supply Chain

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/104

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 3:39 PM on 10/2/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

105 Terms

1
New cards
What is facility logistics?
Design and material handling for manufacturing, distribution, and servicing.
2
New cards
What is the goal of managing logistics facilities?
Efficient flow of goods, services, and related information.
3
New cards
What does flow analysis help determine?
The most effective arrangement of machines, workstations, and departments.
4
New cards
What three levels of flow should be analyzed?
Within workstations, within departments, and between departments.
5
New cards
What product factor affects facility flow?
The number of parts and sequence of operations in each product.
6
New cards
What production-volume factor affects flow?
The number of units to be produced.
7
New cards
What are five flow-analysis information tools?
Assembly, operation process, flow process, multi-product, and from-to charts.
8
New cards
What does an assembly chart model?
The assembly process.
9
New cards
What does a single-link circle mean on an assembly chart?
A basic component.
10
New cards
What does a circle with several links represent?
An assembly operation or subassembly.
11
New cards
What does a square represent on an assembly chart?
An inspection operation.
12
New cards
How should you begin constructing an assembly chart?
Start with the final product and trace disassembly to basic components.
13
New cards
What creates an operations process chart?
Placing route sheets onto the assembly chart.
14
New cards
On a flow process chart, what does a circle mean?
Operation.
15
New cards
On a flow process chart, what does an arrow mean?
Transportation.
16
New cards
On a flow process chart, what does a square mean?
Inspection.
17
New cards
On a flow process chart, what does a triangle mean?
Storage.
18
New cards
On a flow process chart, what does D represent?
Delay.
19
New cards
What do connecting lines on a flow process chart show?
The sequence in which activities are performed.
20
New cards
What does a multi-product process chart contain?
Several products and their process sequences.
21
New cards
What is a from-to chart?
A matrix showing material flow between machines, departments, or buildings.
22
New cards
What can entries in a from-to chart represent?
Distances, material-handling trips, weights, costs, or quantities.
23
New cards
Why may both halves of a from-to matrix be needed?
One-way routes can make A→B distance differ from B→A.
24
New cards
What can a from-to chart establish for future comparison?
A baseline for material-handling performance.
25
New cards
What should effective facility flow accomplish?
Progressive movement from origin to destination with adequate aisles.
26
New cards
Which facility locations strongly affect flow patterns?
Receiving entrance and shipping exit.
27
New cards
What points are commonly used to estimate department distance?
The centroids of the departments.
28
New cards
Departments with many trips should generally be located how?
Near each other to minimize total travel distance.
29
New cards
How is total distance traveled between departments determined?
Sum each pair's distance multiplied by its number of trips.
30
New cards
What does flow simplification try to eliminate?
Unnecessary intermediate steps and movements.
31
New cards
What is direct-to-use flow?
Delivering material, information, or people directly to their ultimate use.
32
New cards
How can multiple flows be simplified?
Use as few movements as possible between consecutive points of use.
33
New cards
Why combine material movement with processing?
To reduce separate handling steps and simplify flow.
34
New cards
What problem is well suited to a flow process chart?
A process taking too long, such as paperwork processing and distribution.
35
New cards
Are inventory stockouts mainly a flow-process-chart problem?
No. They are primarily an inventory-policy problem.
36
New cards
Are excessive repair costs mainly a flow-process-chart problem?
No. They are primarily a reliability problem.
37
New cards
What is a facility layout?
The arrangement of machines and other equipment within a facility.
38
New cards
What are the four major layout types?
Process, product, fixed-position, and group technology.
39
New cards
What is a process layout?
Similar equipment or activities are grouped together.
40
New cards
When is a process layout appropriate?
Custom work with relatively low demand for each product.
41
New cards
What is a product layout?
Equipment is arranged according to the sequence used to make the product.
42
New cards
When is a product layout appropriate?
High-volume or bulk production.
43
New cards
What is a fixed-position layout?
The product remains stationary while workers and resources come to it.
44
New cards
When is a fixed-position layout appropriate?
Large, heavy, or fragile products that are difficult to move.
45
New cards
What is another name for a group technology layout?
Cell layout.
46
New cards
What does group technology create?
Small product layouts dedicated to groups of similar items.
47
New cards
What is a key advantage of a fixed-position layout?
Reduced material movement and high flexibility.
48
New cards
What is a key disadvantage of a fixed-position layout?
More personnel movement and low equipment utilization.
49
New cards
What is a key advantage of a process layout?
Equipment and human-resource flexibility.
50
New cards
What is a key disadvantage of a process layout?
Longer flow lines, production times, and more work-in-process inventory.
51
New cards
What is a key advantage of a product layout?
Short material travel distance and reduced per-unit production time.
52
New cards
What determines the pace of a product layout?
The slowest machine.
53
New cards
What is a major disadvantage of a product layout when products change?
A product change may require a major layout change.
54
New cards
What are key advantages of a group layout?
Short travel distance, smooth flow, and good machine utilization.
55
New cards
What is a potential disadvantage of a group layout?
Work-in-process storage and possible unbalanced workloads.
56
New cards
What production volume is associated with product layouts?
High-volume output with relatively few products.
57
New cards
Why can machine failure be costly in a product layout?
Downtime can disrupt the entire connected production line.
58
New cards
What factors matter when choosing a facility site?
Geography, access, zoning, client base, environment, and incentives.
59
New cards
What environmental factors may affect site selection?
Climate factors such as temperature and humidity.
60
New cards
What technique compares sites using supplier shipments and distance?
Load-distance technique.
61
New cards
What distance is used in the notes' load-distance site example?
Straight-line (Euclidean) distance.
62
New cards
What is the load-distance calculation?
LD = Σ(load × distance).
63
New cards
What does a lower load-distance score indicate?
A preferable location based on weighted transportation distance.
64
New cards
What is capacity?
The throughput or units a facility can hold, receive, store, or produce over time.
65
New cards
What is design capacity?
The theoretical maximum output under ideal conditions.
66
New cards
What is effective capacity?
Expected achievable capacity given current operating constraints.
67
New cards
Why is effective capacity often below design capacity?
Operating constraints, product changes, or a different product mix.
68
New cards
What factors can affect available capacity?
Product specifications, work content, product mix, plant, and equipment.
69
New cards
What is input in capacity analysis?
Resources, materials, labor, or other items put into the system.
70
New cards
What is output in capacity analysis?
What the system produces or its end product.
71
New cards
What is utilization?
The percentage of available capacity or time actually being used.
72
New cards
What is the utilization formula based on output?
Utilization = Output ÷ Design capacity.
73
New cards
What is utilization using hours?
Utilization = Actual hours worked ÷ Available hours × 100%.
74
New cards
What is efficiency?
Efficiency = Actual production rate ÷ Standard production rate × 100%.
75
New cards
What is rated capacity?
Rated capacity = Available time × Utilization × Efficiency.
76
New cards

How is available time calculated?

Available time = Number of machines × Number of workers × Hours of operation.

77
New cards
What should good capacity planning include?
Demand forecasts, technology, capacity increments, operating level, and change.
78
New cards
What can a firm do when demand exceeds capacity?
Raise prices or schedule longer lead times.
79
New cards
What can a firm do when capacity exceeds demand?
Reduce prices or use more aggressive marketing.
80
New cards
How can staffing be used to match capacity and demand?
Increase or decrease employees or shifts.
81
New cards
How can equipment changes adjust capacity?
Buy equipment or sell or lease excess equipment.
82
New cards
How can process improvement affect capacity?
Increase throughput without necessarily adding facilities.
83
New cards
What is a supply chain?
Organizations, people, activities, information, and resources involved in delivering a product or service from supplier to customer.
84
New cards
What three broad processes form an integrated supply chain?
Sourcing, making, and delivering products.
85
New cards
What do supply-chain activities transform?
Raw materials and components into finished products delivered to customers.
86
New cards
What is the purpose of supply chain management?
To satisfy customer requirements as efficiently as possible.
87
New cards
What inventory stages does supply chain management control?
Raw materials, work-in-process inventory, and finished goods.
88
New cards
What are the four essential elements of a supply chain?
Purchasing, production, inventory management, and transportation and distribution.
89
New cards
What does purchasing do in the supply chain?
Acquires the resources needed to produce goods and services.
90
New cards
What does production do in the supply chain?
Converts acquired resources into goods and services.
91
New cards
What does inventory management control in a supply chain?
The quantity and location of raw materials, work-in-process, and finished goods.
92
New cards
What does transportation and distribution accomplish?
Moves resources needed for production and distributes goods and services to customers.
93
New cards
What is distribution network configuration concerned with?
The number and location of suppliers, production facilities, distribution centers, warehouses, and customers.
94
New cards
What choices are involved in distribution strategy?
Centralized vs. decentralized, direct shipment, and push vs. pull strategies.
95
New cards
Why is information integration important in supply chains?
It allows systems and processes to share demand signals, forecasts, and other valuable information.
96
New cards
What is material handling?
The movement, storage, control, and protection of materials, goods, and products.
97
New cards
What is the goal of material handling?
Move the right material to the right place, at the right time, in the right amount and condition, while minimizing production cost.
98
New cards
What costs make up material-handling cost?
Handling, transportation, packaging, space, and equipment costs including operation, maintenance, and depreciation.
99
New cards
What is the primary goal of material-handling improvement?
Reduce unit production costs.
100
New cards
How can material handling promote productivity?
Use straight-line flow, move more material at once, mechanize handling, and automate handling.