158 Terms

1
New cards

The phase with the largest fee share (35-40%) is ____.

Construction Documents

2
New cards

Schematic Design typically bills about ____% of the fee.

15-20

3
New cards

Design Development typically lasts ____ months.

2-4

4
New cards

Construction Documents typically last ____ months.

3-8

5
New cards

Bidding and Negotiation bills about ____% of the fee.

5

6
New cards

The longest phase, lasting 1-3 years, is ____.

Construction Administration

7
New cards

Which phase's primary objective is a clearly defined, feasible concept the client accepts?

Schematic Design

8
New cards

Which phase leaves no major issue unresolved that could force restudy in CDs?

Design Development

9
New cards

The B101 lists ____ project phases.

Five

10
New cards

The last step of every design phase is formal client ____.

Approval (in writing)

11
New cards

True or False: Design stops at the end of Design Development.

False

12
New cards

An SD estimate by cost per square foot has what accuracy?

15-20%

13
New cards

Which estimate is most accurate?

Unit price

14
New cards

Which estimate is typical in Design Development?

Assemblies/systems

15
New cards

Cost per bed or per seat is which estimate?

Order of magnitude

16
New cards

Unit price estimates follow the ____ format.

MasterFormat

17
New cards

Assemblies/systems estimates follow the ____ format.

UniFormat

18
New cards

Detailed cost estimating is an ____ service under B101.

Additional

19
New cards

The architect does not ____ that bids will match the estimate.

Warrant

20
New cards

If the lowest bid exceeds the budget, name the owner's B101 options.

Increase budget, rebid or renegotiate, revise scope, terminate, or other alternative

21
New cards

When the owner cuts scope to meet budget, the architect revises CDs ____ additional compensation.

Without

22
New cards

Which phase takes the most time and resources?

Construction Documents

23
New cards

The written part of the contract package is the project ____.

Manual

24
New cards

Divisions 1-49 of the specifications are part of the ____.

Project manual

25
New cards

Instructions to bidders are a ____ requirement.

Bidding

26
New cards

General and supplementary ____ set out contract rights and duties.

Conditions

27
New cards

Which set is NOT part of the contract documents?

Bidding requirements

28
New cards

Issued during bidding, ____ clarify the bidding documents.

Addenda

29
New cards

Issued after signing, change orders are contract ____.

Modifications

30
New cards

Contract form and conditions are separated to hide the ____ ____.

Contract sum

31
New cards

Who controls means and methods of construction?

Contractor

32
New cards

Quantities and relationships are best shown in the ____.

Drawings

33
New cards

Qualities and workmanship are best placed in the ____.

Specifications

34
New cards

CSI's master list of spec divisions is ____.

MasterFormat

35
New cards

The three parts of a spec section are General, ____, and Execution.

Products

36
New cards

MasterFormat Division 00 is ____.

Procurement and Contracting Requirements

37
New cards

MasterFormat Division 01 is ____.

General Requirements

38
New cards

Which division covers Openings?

Division 08

39
New cards

Which division covers Thermal and Moisture Protection?

Division 07

40
New cards

Which division covers Finishes?

Division 09

41
New cards

Which division covers Concrete?

Division 03

42
New cards

Which division covers Masonry?

Division 04

43
New cards

Four specifying methods: descriptive, performance, reference standard, and ____.

Proprietary

44
New cards

Which spec names exact products by manufacturer and model?

Proprietary

45
New cards

Which spec states the end result and testing criteria, naming no products?

Performance

46
New cards

Which spec describes material characteristics without brand names?

Descriptive

47
New cards

Which spec cites ASTM, ANSI or UL standards?

Reference standard

48
New cards

'UL Class A roof, flame spread 25 or less, R-14' is which spec type?

Performance

49
New cards

'48-mil PVC membrane over 2 in. insulation' is which spec type?

Descriptive

50
New cards

Public projects list several brands to allow full and open ____.

Competition

51
New cards

Which AIA document is Instructions to Bidders?

A701

52
New cards

Which bond guarantees the contractor completes the work?

Performance bond

53
New cards

Which bond guarantees subs and suppliers get paid?

Payment bond

54
New cards

A payment bond is also called a labor and ____ bond.

Material

55
New cards

A ____ bond guarantees the winning bidder will sign and furnish bonds.

Bid

56
New cards

True or False: The architect may answer one bidder's question verbally.

False

57
New cards

Responses to bidders are issued in writing as ____.

Addenda

58
New cards

The ____ conference gives bidders a clear view of scope.

Pre-bid

59
New cards

Who makes the final prequalification decision?

Owner

60
New cards

Without prequalification, the award goes to the lowest ____ and responsive bidder.

Responsible

61
New cards

A letter of ____ lets work start before the formal agreement.

Intent

62
New cards

In design-bid-build, the contractor is hired during which phase?

Bidding and Negotiation

63
New cards

Which bidding type uses one prime contractor and multiple subs?

Cost plus a fee

64
New cards

Who alone can alter construction documents after an RFI?

Architect

65
New cards

A graphic RFI response that changes the documents is a job ____.

Drawing

66
New cards

Which form asks a contractor to price a possible change?

Proposal request (G709)

67
New cards

Which form directs work before price or time is agreed?

Change directive (G714)

68
New cards

Which document legally changes contract sum or time?

Change order

69
New cards

Change orders typically total ____% of construction value.

1-5

70
New cards

Largest change order source?

Field conditions (50%)

71
New cards

Owner directives make up ____% of change orders.

35

72
New cards

Accepted nonconforming work requires a ____ to the contract sum.

Credit

73
New cards

Who approves a product substitution?

Owner

74
New cards

Submittals are reviewed only for ____ with the contract documents.

Conformance

75
New cards

Action or informational: which submittals need architect approval?

Action

76
New cards

The contractor can't start submittal-related work until it is ____.

Approved

77
New cards

Application and Certificate for Payment is ____.

G702

78
New cards

The Continuation Sheet is ____.

G703

79
New cards

The Certificate of Substantial Completion is ____.

G704

80
New cards

The Contractor's Affidavit of Payment is ____.

G706

81
New cards

The Affidavit of Release of Liens is ____.

G706A

82
New cards

The Consent of Surety to Final Payment is ____.

G707

83
New cards

The Field Observation Report is ____.

G711

84
New cards

G709 is a proposal ____.

Request

85
New cards

G714 is a construction change ____.

Directive

86
New cards

Withheld payment percentage until completion is ____.

Retainage

87
New cards

A schedule of ____ breaks the contract sum into work portions.

Values

88
New cards

The owner normally has ____ days to pay an application.

30

89
New cards

The architect certifies payment for ____ work.

Completed

90
New cards

The architect makes how many formal 'inspections'?

Two

91
New cards

The two inspections are for substantial and ____ completion.

Final

92
New cards

Substantial completion means occupancy, not ____ complete.

Fully

93
New cards

Substantial completion starts the ____ periods.

Warranty

94
New cards

Who sets the substantial completion date?

Architect

95
New cards

The list of items left to finish is the ____ list.

Punch

96
New cards

Which reconciles allowances and alternates at the end?

Final change order

97
New cards

A ____ is a legal claim on property until a debt is paid.

Lien

98
New cards

Contractor correction period after completion is ____ year(s).

One

99
New cards

The architect checks record drawings for ____, not accuracy.

Compliance

100
New cards

Architect's construction phase duties end with the final ____.

Certificate for Payment