1
New cards

Poka-yoke

Error-proofing; preventing mistakes or detecting them immediately.

2
New cards

Pull system

Work begins because of actual demand.

3
New cards

Standardized work

Documenting the best-known way to perform a task.

4
New cards

Value Stream Mapping

Mapping the steps and information needed to deliver customer value.

5
New cards

Visual factory

Using visible signs and signals to communicate important information.

6
New cards

5S

Workplace organization method.

7
New cards

Just-in-Time (JIT)

Producing or delivering what is needed, when it is needed.

8
New cards

Kaizen

Continuous improvement through small changes.

9
New cards

Kanban

A visual signaling method used to manage workflow and inventory.

10
New cards

Nominal Group Technique

Structured brainstorm: individual ideas first, then round-robin sharing, clarification, and private ranking

11
New cards

• Multivoting

Narrow a long list by giving each person limited votes and tallying the top items.

12
New cards

• Vroom-Yetton (Vroom-Yetton-Jago) decision model

Framework to choose how leader-driven or group-driven a decision should be based on situational questions

13
New cards

• Paired Comparison Analysis

Compare options two at a time to produce a ranked order.

14
New cards

• Q-sort

participants rank statements into a forced distribution (most agree to most disagree) to reveal shared viewpoints and priorities

15
New cards

• Sigma level

Capability rating that maps DPMO to standard deviations; higher sigma = fewer defects.

16
New cards

• Cost of poor quality (COPQ)

money that would be saved if work were performed without defects, errors, or rework.

17
New cards

Project charter.

formally defines the improvement project: purpose, goals, scope, team and expected results

18
New cards

Project scope

hat is in and what is out; keeps the project from growing or losing focus.

19
New cards

Project metrics

the measures used to size the problem and track results — objective evidence that the effort is working

20
New cards

Project closure

formal completion: results evaluated, improvements documented and handed to the process owner, lessons learned captured

21
New cards

Phase (tollgate) reviews

formal checkpoints at the end of each phase on progress, results and readiness to move on

22
New cards

Precision

how close repeated measurements are to one another — random variation, summarized by a standard deviation

23
New cards

Stability

consistency of the measurement system over time; drift shows up on a control chart of a master part.

24
New cards

Repeatability (EV)

same operator, same instrument, same part, several times — equipment variation.

25
New cards

Reproducibility (AV)

different operators, setups or shifts, same part — appraiser variation. EV + AV = Gage R&R.

26
New cards

Linearity

whether bias stays the same across the instrument's range (a scale that over-weighs heavier boxes).

27
New cards

Bias

the systematic difference between the average measurement and the true value (a probe that reads 2 °F high)

28
New cards
Common-cause variation

Routine variation generated by the process as it currently operates.

29
New cards
Special-cause variation

Variation signaling that a specific change or unusual event has affected the process.

30
New cards

Distribution center

A warehouse that performs additional services for processing orders

31
New cards

Cross-docking

An approach where large incoming shipments are broken down into small shipments for local delivery

32
New cards

Hub-and-spoke

goods from multiple locations go to one central location then to final destination

33
New cards

Fulfillment center

A distribution center designed to handle small, individual orders that are prepared for shipment to individual retail customers

34
New cards

E-com Fulfillment

filling customer orders that are placed online and delivering the products to them.

35
New cards

• Retail Fulfillment

filling customer orders directly through a physical retail store.

36
New cards

• Omni-Channel Fulfillment

multiple connected ways to order and receive products.

37
New cards

• Cross-Dock Facility

warehouse where products come in from suppliers and are quickly transferred to outgoing trucks to be delivered to stores or customers.

38
New cards

• Cold Storage

temperature-controlled warehouse used to store products that need to stay cold or frozen to prevent spoilage.

39
New cards
• Grocery (multi zones) – Frozen, Cooler, Floral, Dry Goods (Kroger)
40
New cards
• Darkstore – Urban fulfillment, forward inventory deployment
41
New cards

backhaul

Using a truck's return trip to carry another shipment instead of driving back empty.

42
New cards

Request for proposal (RFP)

used for purchasing items that are more complex or expensive and

where there may be a number of potential vendors

43
New cards

Functional products

Staples

44
New cards

• Innovative products

fashionable clothes, life cycle = few months

45
New cards

• Stable supply process

underlying technology is stable

46
New cards

• Evolving supply process

underlying technology changes rapidly

47
New cards

acquisition costs

cost of purchasing something

48
New cards

ownership costs

inventory, insurance, maintenance, taxes, holding costs, cost of capital

49
New cards

total cost of ownership

estimated cost of an item

50
New cards

post ownership cost

cost when you dispose or sell product after use

51
New cards

Average aggregate inventory value:

total value of all items held in inventory

52
New cards

whats included in cogs

direct labor, material, freight & logistics and manufacturing overhead

53
New cards

SMED (Single-Minute Exchange of Die)

Lean technique used to reduce the time it takes to switch a machine from making one product to making another

54
New cards

Push system

Makes products before customers actually order them based on predicted demand

55
New cards

Pull system

Makes products when theyre demanded

56
New cards

What are the lean principles

value, value stream, flow, pull, perfection

57
New cards

what does SIPOC stand for

suppliers, inputs, process, outputs, customers